-__.
- ]
> -~
NUMOHAWK Y NIAGARA -
NIAGARA BAOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE. N.Y.13202/ TELEPHONE (315) 474-1511 December 10, 1984 (NMP2L 0285)
.Mr. R. W. Starostecki, Director
. U. S. Nuclear Regulatory Comission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
Enclosed is an interim report in accordance with 10CFR50.55(e) for the probic.i concerning failure to meet wall thickness criteria.
This problem was reportet.
via tel-con to T. Silko of your staff on November 9,1984 Very truly yours, C. V. Mangan Vice President Nuclear Engineering and Licensing CVM/GG:csb (0573H) xc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gram, NRC Resident Inspector Project File (2) 8412270230 841210 PDR ADOCK 05000 8
lI L77 1
.a NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Failure to Meet Wall-Thickness Criteria (55(e)-84-49)
Description of the Problem During an unscheduled surveillance of inservice inspection welds and adjacent base metal, Niagara Mohawk identified welds with manufacturer's minimum wall discrepancies.
Final QC inspection of the welds by ITT Grinnell had failed to identify the deficiencies.
This matter is still under investigation.
A final report will be submitted by March 1,1985 4