. ATTACHMENT 1 J;rssy Centr:I Pcw2r & Light Company
)}
Macison Avenue a: Punct. Bout Road p
- ,j_, L,',,
Momstown. New Jersey 07963 (201)455-8200, March 3,1980 s
Mr. Peter Koltay Huclear Regulatory Commission 631 Park Ave.
King of Prussia, PA 19406
Dear Mr. Koltay:
)
SUBJECT:
4160 Volt Fire Protection Vault
,e
=m
'7 Please~ find the following-documents and dradin'gs that you requested
~~
concerning the 4160 volt switchgear vault:
1.
System description for 4160 volt Switchgear Ro'om; 218-77-18.1, Rev. 1.
2.
Safety evaluation for the Fire Protection System Augmentation 4160 volt switchgear vault, 218-77-18.2 Rev. O.
3.
Design criteria 218-77-38, Rev. O.
~
~
4.
Installation Specification, 218-77-45, Rev. 2.
5.
Installation Specification, 218-77-61, Rev.1.
6.
GPU drawings E-1-110-313-001, Rev.1; E-1-110-313-002, Rev.1, and E-1-110-313-003, Rev.1.
-7.
Marine Fabricators drawings Job #26465 101 thru 110 Rev. 2.
8.
Bowman Construction drawings, 28555, Sheets 1, 2, and 3 dated 12-20-79.
Please be advised that some of your concerns regarding the 4160 volt vault have been<previously addressed in the following letters:-
8 041221 0
DR PDR O
i Jefiey Ct".:rs' Power 6 L g-* C,ompany is a fJe noer o'14 General Puba: Uv.1.es Systern
a.
Ivan Finfrock to the Director, NRC, dated March 23,1978; t
b.
Ivan Finfrock to the Director, NRC, dated June 1,1979.
In addition, all fire protection modifications have been reviewed in detail and approved by JCP&L's Fire Protection Consultant, Professional Loss Control Inc.
With respect to the exterior walls of the vault, they have been designed to provide a three-hour fire barrier to protect the switchgear from the lube oil fire hazard. This has been accomplished by a coating of fire retardant material applied to the exterior surfaces of the vault walls and ceiling.
Manufacturer's test data, based upon ASTM E-119 testing, indicates that a two inch coating on. Walls and decks is the required thickness needed to. provide a three-hour fire barrier..
Any fire originating inside the vault will be of short duration due to the low fire loading, the detection system, and the nanual CO.
For this 2
reason, the interior wall separating the redundant switchgear is a two-hour fire barr.ier by designet-In actuality, however.. -the' fire rating is probably much. greater..tt'Detai:1. A on GPUSC drawing E,1_110-313-001 shows..the interior.
det <ing :or wallccovered on each side with-lath and:1-11'/.16""of Pyrocrete:102.~.0
-In cordance with the.manu#acturer's-test ' data',xthis would be equivalent'.to a two-hour barrier on each side of the ~ interior wall. ~,
Concerning the seismic adequacy of Pyrocrete, manufacturer's test data indicates excellent adhesion and minor indentation without cracking resulting from impact testing, as compared with poured in-place concrete.
If you have any further questions,.please contact me.
Very truly yours, f