ML20100R751
| ML20100R751 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/31/1992 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20100R749 | List: |
| References | |
| NUDOCS 9204170165 | |
| Download: ML20100R751 (10) | |
Text
__m.-
._, _.m._
4 JFERA!!WS DATA EEf0EI DOU ET NO M-_41L _,_.,,
EATE eraLL 1992 OrEN!M STATUS CC"FifilD EY R,A. Williaes TELEFtChE
'??4-373-5487
- 1. U1it Nate: Catants 1-
- 2. Re;critng feritd: Mars 1.19?2949 31, lH2
- 3. Litersed Iternal iceer (Ntt:
3411
- 4. Aaseplate Fating (Bras Nei:
1X58 htes aNaterlate Fating
- 5. Dest;n Electrical Rating met wh
!!'5 (Sr ns N el calculated as
- 6. Manaus Orpedatie Ca;a:ity (Brtss %eh 1192 1450.000 EVA x.50 p a er-
- 7. raxis a rependable Capabity thet Neh 1129 f ator per tage tii, B. If Chages Oc gr in Capacity Rattras iltens L.eber 3 Thecugh 7) since Last UE540M.
Re;;rt. Eive Reasen:
I
- 9. Fema level in Mich Restri:ted, if Any Bet Ne;:
10, Reann FM Eestrt tint, if anf t Yhts Penth ir.-tedate Caulative
!b mrt It, Reptrtir,; f uncd 74.0 2154.0 3233.0 12, ks:e-Of Mrs Reactor Was Critical-7%.a 21S+.0 4E7*.2 r -
- 13. Fea:ter Reserve SN;than ruurs -
--0-- -
H. Heurs Generater 0 &Line 76 r,
[194,0 g579,9
- 15. but Reserve Shine Hars
-+- -
--0--
'It. Eress Thersal Energy Generated t M )
204273 2SM76 9 0767021
- 17. Gr:ss Ele:trical Er:ergy Gecerate: iN"1 SM45 2587597 4n59291 E Net iicctrical Energy Eenerated i%
SM56?
2457031 46390725
- 19. Unit E?rvice Facto' 100.0 100.0 73.6
- 20. Unit Anilatility Fa:tn ISO 100.0 73.6 2L Unit Carntly Futsr (Us:ng C Net) 9t,4 97.7 p.0
- 22. Dnit Cunity fa: tor (Lsing DER Net) 95.0 93.3 62,4
- 23. Uut force! Cata;e Fate.
a.0 0.0 11.0
- 24. Stut m o Schehle: Over hext t h ntss lig e, Oate, an Curiti n of E n hh
-Refuelinn - June 26, 1992 - 6)_ days t
- 23. If ht Cas At Era Cf Rep;rt Peried. Estinated Date et Startu::
'26.-Units Ir. Test-Status tFrict 1: Coteercial Operatin):
Fere:ast A:htevej ik!IIAL.CRIIIGLlII IN!!!AL ELECH ICITY CC VER lAL CCEFAT:Ch I'
I l
9204170165 920415 PDR ADOCK 05000413 R
~... -. _..... _... - _ -.. _.. _ _.. _ _ _
'4 0FEGATI% MTA AEFERI 00CLET ND
$0-413 UNil Catada 1 MT! Mrtl 15. IGi?
C W LETED BY P A Willias,1 TELEFKNE 7M-373-sib 7
- G in
?;rh, IN!
a
- dt AV!H5! MILf FEWER LE'iEL Tf A M AGE P!LV FL4f; LEVEL (Nr-het)
(Nedet!
1 it*f
!?
tl49
_ 1144 12 1148 3
'!u
!?
!168 4
873 20 1127 5
7M
!!$2 i
I 6-M' 22 1151 l
(
-l 7
c52 23 1162 l
5 457 24 1152 i
9 959 2;
!!51 10 H3 26
!!48 l
1 i
11
!!!B 27 1149 l
1.
12 inn es un l-i il 1035 29 llW i
i
['
rp I
. 15' 1153' 31 lla m
nse l
l l.
.. ~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CATAWUA 1 DATE v4/13/ 9 z l
REPORT MONTH March 1992 COMPLETED BY' N.C.
s1MMuus TELEPHONE tius)-J/;-und9-l (1) 2)
(4)
(5) l E
HOD T
A OF LICENSE s
i N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 2-P 92 4 F
A HB INSTRU-MAIN TURBINE ELECTRO-HYDRAULIC CONTROL PROBLEMS-I i
1 I
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions A-Equi ment FailureB-Main enance or test (Explain)
S Scheduled 1-Manual for Preparation of, Data i
2-Manual Scram Enty Sneets For Licensee i
C-Refueling 3-Automatic Scram Event Report (LER 1
(NUREG-0161))
[
i D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination 1
F-Administrative (5)
(Explain) (Explain) l G-Operator Error Exhibit I - Same Source i
H-Other D
t
')
I i
^
I t
j~
I
(
DOCKET No:
50 413 UNIT:
Catawba 1 DATE: 4/15/92 NARRATIVE
SUMMARY
MONTil: March 1992 Catawba ~ Unit 1 began the month of March operating at 100% full' power.
The unic operated at or nea: 100% full power until 0300 on 3/t, when a power reduction to approximacely-90% power was commenced for sain turbine valve movement t s. c t i ng.
During this test -it was disc wered that the test solenoid. valve on stop valve a4 would have to be eplaced.
A power reduction to 65% power was begun at 1005 on 3/4
.The uiJr remained at 65%-power from 1230-on 3/4 to 2230 on 3/5.
During the power escalation, the unit was held at 85% power from 0040 on 3/6 to
-1549,n 3/10 to allow for the cleanup of the turbine valve control ol' l
system. The unit returned to 100% full power at 2326 on 3/10, and j
~
operated at or near 100% full power for the remainder of the month.
I i
i Prepared by:
N. C. Simmons
' Telephone:
704-373-8559
.. _.... _.. ___ _ _. _ _.. _. - _.. ~. _ _ _ _ _
m.~.._
r 4
f MONTHLY REFUELING INFORMAT_ ION REOUIMj' l.
Facility name: Catawba.
Un'it 1
- 2.
Scheduled next refueling shutdown: Ju_ne 1992 3.
Scheduled restart following refueling: Auguat 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER DE MAINTAINED IN THIS REPORT.
4.
Will-refueling or resumption of operation thereafter require a technical specification change or other license amendment?
d If'yes, what will these be?
If no, has_ reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or difforent design or supplier,- unreviewed design or performance analysis
- methods, significant changes in design or new operating procedures).
-7.
Number of Fuel assemblies (a) in the core: 12].
(b) in the spent fuel pool: 336 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9.
Projected date of last refueling which can be accommodated by present licensed capacity: Ee._p_tembe r 2 009 DUKE POWER COMPANY
'DATE:
April 15, 1992 Name of-Contact:
]L. A. Williams Phone:
704-373-5987 l
l
.M.,
_a_Ja.J,pm.44As.4+A-a eh86-4 ;g.h A
.614a p -mA Mt f t.w w 2i43-.s4f.-p4-M.J-.4.hh--
v'-aas n:o-o-m W 6-88 na
'.W.-
as 44Ji, +.
Ah.
a.,a.&,rdBA.J Je $ a M--
.t-w+4.st,Ja#m_._r4.4.M am3.aJwas, s 44,4A_4AA.m,,,h4Aem
,,jf__
-4 X G [1 ND 50-414 tafE A;ri! th 1992 0*iMT!N3 STUS C04LETED D F A W !1Lais_,
1 TELffHONE 704-373 5 97
- 1. hit hat: Catada 2
- 2. Reptrtig Feriodt March 1,1992-Mc:h 31, lii2
- 3. Licensed Theraal Praer iNth 3411 j
- 4. hateplitt 5411DQ (6"tss fit):
1338 kettl that?plateIatIDg l
$. Desip Electrical F4 ting (Net Neh
!!45 f 6tess Nel calculated as i
$. Maxists Dnendale Caputtr (Ettss Weh 1192 1450.000 MA s.90 power
)
- 7. Mausva Depen:atle Esp.nty thet Neh 11di futcr per f agt tu, i
- 3.11 Ch49e% CCpr in Capdity Ratiq5 (lteth huCet 3 ThrCagh 71 Since (451 g
NMEE-0020.
Reprt sive n as:nst O fceer Level Ic Witch Restricted, if Any f het Neh
- 10. Fe4sen 4r Festrictien, if ny:
e'--
eg' ame t -
This N eth Vr,-terate Cuealative l
li. k rg n Re grti..g Ftrict 764J 2154.0 4?249.0 IP, Leber Of Ars Onter Was Critical 744,0 2161d 36459,0
- 13. Rente Reserve Sut6n Sturs
+
+
- 14. Mrs 5eurater DM :e
%0 F130.9 151 %.1 1
- 15. Urat hsene Ssutume scurs
+
--0--
- 16. Srosa 3ereal Dergy Fenerated !NH) 2513724 70B1977
!!E206174
- 17. Gr ss Electrical (nergy Generated (Nh) 899377 J525705 37701610
- 18. Ne: Electrical Energy bretats iNHi 6543h 23?57M 37247322
- IL Unit Bervice F uter 100.0 97.6 72J
- 20. Unit A rilablHty fact:r F,0. 0 77d 72.5
- 21. Unit Cdacity futcr (L'UN NC Net) 101.7 97.E 60.8 E2. ihit Cap ntty fatter.(!; sing LEF ktti 100,3 95J 66.1
- 23. thit Forced htap Eate ed 1.5 12.5
- 24. Jhutan Scre:gles 0,er Next' 6 nontiis t!)p, Date, 4W hretm, of Ea:nh i:
None-
-25. If Srct he At Ene Of feprt.Ferted. Stianed 5. ate of Starte:
l
~ Ei, Units it2 Test States (Pritr 1: Cca m a al h erettonn Fcretast Achieved l
-!NITIAL CFitICAd IY l-INIT.4L ELEiCICITY l
CEN E6CIAL PSE Ai!DN l
i
. ~..... ~....
~..... -.
...... ~.....-. -. - - - - - - -...
~~~.. ~., -
4 9
DFE UTING DATA FEFORT l
DOCKET NO 56414 Unit _
Cat any1_
l DME tr.ril 15. IN (CMPLETED BY R. A. Willian TELEFK N 7M-3?H9??
PChiH Mae:5, 1902 QE AVERA5E BAILY f:WER LEVEL "2
AVEF AGE DAli.Y FDsER LEVEL INe4:eti (Ne-het i 1
1 -.
I154 17 113.?
I.
115?-
19 1149 115E__
=19 1142 4
11!0 20 1155 5
1150 2
1156 J
'6 1147 22
!!5?
-7~
!!45 23
!!53 B
1849 2A lt!4 9 --
1164 25
!!51 10
- 11 9 h
1147 11-ItS6
!?
!!05 12
!!53 29 11S1
'13 1154 29
!!53
~ 14 1155 30 1145 15-
-1:54 31 1149 16
!!63 t
.~.w a
d
->--c-a w
e
'm-r
>--Tr1 v
== w ww--g T-r-
e,~
re, m
l l
UNIT, SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414' UNIT NAME CATAWUA Z DATE v4/13/ vz REPORT MONTH March 1992 COMPLETED BY ^H.
C.
simulio TELEPHONE
(/u4)-J/J-upov (1)
(2R)
(3)'
(4)
(5)
MET-E HOD T
A OF LICENSE t
N Y
S SHUT EVENT SYS-CAUSE.AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE i
NO SHUTDOWNS OR REDUCTION S
i 4
i i
I d
1 i
(1)
(2)
(3),
(4)
F Forced Reason:
Method:
Exhibit G - Instructions l
S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data
-[
B-Malnuenance or test 2-Manual'Screm Ent W Sheets,For Licensee-7 C-Refueling 3-Automatic Scram Event Report (NUREG-0161))
(LER D-Regulatory Restriction 4-Other (Esplain)
File E-Operator training & License Examination F-Administrative (5) 4 G-O!her (Explain) (Explain) erator Error Exhibit I - Same Source-H-O
{
i j
t L
[
t b
. - - _ _. _.... ~. _ - _ _..
m.
DOCKET NO:
50 414 UNIT:
Catawha 2
-DATE:
4/15/92_
1
)
NARRATIVE SUFCIARY MONTH: March 1992 Catawba Unit:2 began the month of March operating,at 1001 full power.
The unit operated at or near 100% full power for the entire month, and ended the month operating at 100% full power.
1 s
6 Prepared by:
N. C. Simmons Telephone:
704-373,8559
MONTHLY REFUELING INFORMATION REOUE!iT i
1.
Facility =name:___ Catawba.
Unit 2 2.
Scheduled next refueling shutdown: January 1993 3.
Scheduled restart following refueling: April 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS
-4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these_-be?
If no, has reload design ar.d core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing acticn and supporting information.
6,-
Important licensing considerations (new or dif ferent design - or
- supplier, unreviewed _ design or performance analysis
- methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 111 (b) in the-spent fuel pool: 18 0 8.
Present licensed fuel pool capacity: 1418 Size of requested 4 planned increase:
- 9.
Projected date of.last refueling which can be accommodated by present' licensed capacity: September 2011 DUKE POWER COMPANY DATE:
6pfil 15, 1992 Name of
Contact:
R.
A. Wil1 lams Phone:
704-373-5987 i
e
.-+.--
..,,