Monthly Operating Rept for Mar 1992 for Wolf Creek Generating Station
ML20100R659
Person / Time
Site: Wolf Creek 
Issue date: 03/31/1992
From: Wideman S
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20100R656 List:
References
NUDOCS 9204170013
Download: ML20100R659 (6)


Text

1

to NO 92-0114 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION-MONTHLY OPERATING REPORT j

MONTH:

March YEAR:

1992 i

Docket No.:

50-482 l

Facility Operating License No.:

NPF-42 l

Report No.

85_

s P

Prepared by:

Steve-G. Wideman I

E 9204170013 920413 PDR ADOCK 05000482 R

PDR

. to NO 92-0114 SUbiARY The following report highlights the operating experience of Wolf Creek Generating Station for the month of March, 1992.

This report is being provided pursuant to Technical Specificntion 6.9.1.8.

I.

SUMMARY

OF OPERATING EXPERIENCE After an unplanned reactor trip on February 19, 1992, the unit remained shutdown until March 27, 1992.

While the unit was shutdown, repair of the reactor vessel canopy seal weld and the reactor cavity seal ring was performed.

An investigation of an unexplained noise that occurred on February 28, 1992 identified that the crossover leg saddles were coming in contact with the thrust block shims.

The investigation also identified the need to rework the Loop A and C vertical drop restraints The unit reached full power at 2234 hours0.0259 days <br />0.621 hours <br />0.00369 weeks <br />8.50037e-4 months <br /> on March 28, 1992 and remained at full power for the remainder of the month II.

MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES 1.

Repair of the reactor canopy seal weld leakage.

2.

Repair of reactor cavity seal ring.

3.

Adjustments to the Loop A and C vertical drop restraints and the thrust block shims.

Wolf Creek Generating Station Monthly Operating Report March 1992 Page 1 of 5

. to NO 92-0114 OrERATING DATA REPORT DOCKET NO.

50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 04-07-92 COMPLETED BY S. Wideman TELEPHONE 316-364-8831 OPERATING STATUS 1.

Reporting Period:

March. 1492 Gross Hours in Reporting Period 744 2.

Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net):, _1, J,JJ.

Design Electrical Rating (MWe-Net):

1170 3.

Power Level to Which Restricted (If Any)(MWe-Net):

N!A 4.

Reasons for restriction (If Any):

N/A This Month Yr. to Date Cumulative 5.

Number of Hoars Reactor was Critical 120.5 1.038.1 44.728.2 6.

Reaccor Reserve Shutdown Hours 0.0 0.0 339.A 7.

Hours Generator on Line 109.4 470.5 44.082.8 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross Thermal EnerFy Generated (MWH) 321.390 3.114.742 143,'108.333 10.

Gross Electrical Energy Generated (MWH) 112.470 1.081.445 49./94,951 11.

Net Electrical Energy Generated (MWH) 86.447 994.988 47.450.459 12.

Reactor Service Factor 16.2 47.5 77.6 13.

Reactor Availability Factor 16.2 47.5 78.2 14.

Unit Service Factor 14.7 44.4 76.5 15.

Unit Availability Factor 14.7 44.4 76.5 16.

Unit Capacity Factor (Using MDC) 10.3 40.3 72.8 17.

Unit Capacity Factor (Using Design MWe) 9.9 38.9 70.4 18.

Unit Forced Outage Rate 85.3 55.6 7.2 19.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of each):

N/A 20.

If Shut Down at End of Report Period Estimated Date of Startup:

N/A Wolf Creek Generating Station Monthly Operating Report Marcit 1992 Page 2 of 5

  • Attachment 1 to NO 92-0114 AVERAGE DAILY UNIT POWER LEVEL DOCKET No.

50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 04-07-92 COMPLETED BY S. Wideman

~

MONTH Harch. 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 152 12 0

28 872 13 0

29 1149 14 0

30 1147 15 0

31 1148 16 0

Wolf Creek Generating Station Monthly Operating Report March 1992 Page 3 ef 5

Attachment i to NO 92-0114 I

UNIT SHUIDOWN AND POWER REDUCTIONS DOCKET NO.

50-4a2 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 04-07-92 COMPLETSD BY S. Wideman TELEPHONE 316-364-8831 REPORT MONTH March. 1991 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /C0fMENTS No Date Sr SCHEDULED (HOURS)

(1)

OR REDUCING POWER (2) 2 920219 F

634.6 A

4 Continued outage from reactor trip at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br /> February 19, 1992. While the unit was shutdown repair of reactor vessel canopy seal welds and the reactor cavity seal ring was performed. Also, adjustments to the Loop A and C vertical drop restraints and the thrust block shims were performed.

i l

SUMMARY

The unit was shut down from March 1, 1992 until returning to power on March 27, 1992 I

l

! 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL l

2.

MANUAL SCRAM l

B: MAINTENANCE OR TEST F: ADMINISTRATIVE 3.

AUTOMATIC SCRAM l

C: REFUELING G: OFERATIONAL ERROR (EXPLAIN) 4.

CONTINUED D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 5.

REDUCED LOAD 9.

OTHER Wolf Creek Generating Station Monthly Operating Report Parch 1992 Page 4 of 5 I

4 e

' Attachment-1 to NO 92-0114-

)

i WOLF CREEK NUCLEAR OPERATING CORPORATION VOLF CREEK GENERATING STATION UNIT NO. 1 MONTH March. 1992 i

I

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month-which required load reduction or resulted in significant non-load related incidents.

DATE

' TIME EVENT' l-March 1, 1992 OCO3 hours-Unit in Mode 5, cold shutdown.

March 10, 1992 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br /> Entered Mode 4, hot shutdown.

March 11, 1992 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> _

Entered Mode 3, hot standby.

March 26, 1992 2254 hours0.0261 days <br />0.626 hours <br />0.00373 weeks <br />8.57647e-4 months <br /> Entered Mode 2, startup.

2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> Reactor critical.

March 27, 1992 0636 hours0.00736 days <br />0.177 hours <br />0.00105 weeks <br />2.41998e-4 months <br /> Entered Mode 1, power operation.

1034 hours0.012 days <br />0.287 hours <br />0.00171 weeks <br />3.93437e-4 months <br /> Unit synchronized to grid.

1607 hours0.0186 days <br />0.446 hours <br />0.00266 weeks <br />6.114635e-4 months <br /> Unit at 30% power.

2308 hour0.0267 days <br />0.641 hours <br />0.00382 weeks <br />8.78194e-4 months <br />s--

Unit at 502 power.

March 28, 1992-1715 hours.

Unit at 98% power.

2234 hours0.0259 days <br />0.621 hours <br />0.00369 weeks <br />8.50037e-4 months <br /> Unit at 100I power.

March 31, 1992 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 1002 power.

l l

l' l

i-Wolf Creek Generating Station Monthly operating Report March 1992 Page 5 of 5

_