ML20100R655

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Mar 1992 for Wolf Creek Generating Station & Revised Monthly Operating Rept for Dec 1991
ML20100R655
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/13/1992
From: Bailey J
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20100R656 List:
References
NO-92-0114, NO-92-114, NUDOCS 9204170012
Download: ML20100R655 (1)


Text

..

f I

W$LF CREEK NUCLEAR OPERATING CORPORATION John A. Badey V6co Prudent Operanons April-13, 1992 NO 92-0114 U. S. Nuclear Regulatory Commission ATTH: Document Control Desk Mail Station P1-137 Washington, D. C.

20555

Subject:

Docket No. 50 482: March 1992, Monthly Operating Report Gentlemen to this letter is the March 1992 Monthly Operating Report for Wolf Creek Generating Station.

This submittal is being made in accordance with the requirements of Technical Specification 6.9.-l.8. provides corrected page 4 for December, 1991, Monthly Operating Report #82.

This revised page reflects the forced outage hours that accrued in December, 1991, as a result of a.n extended refueling outage.

Very truly yours,

/

John A. Bailey j

Vice President operations JAB /jra Attachment cci A. T. Howell (NRC), w/a R.

D. Martin (NRC), w/a G. A. Pick (NRC), w/a W. D. Reckley (NRC), w/a

[h' 0

/

9204170012 920413

,/g PDR ADOCK 0500048.2 i

/

\\\\

R PDR PO Box 411 ' Burbngton, KS 60839 i Phone (316) 364-8L31 An Equa! Orgertunity Empiover M F HC VET