ML20100P054

From kanterella
Jump to navigation Jump to search
Seventh Interim Deficiency Rept Re Omissions to Auxiliary Feedwater Pump Drawings.Initially Reported on 830225. Analysis for Vent,Drains & Cooling Water Interconnecting Piping Completed.Next Rept Will Be Submitted by 850515
ML20100P054
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 11/28/1984
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8412130609
Download: ML20100P054 (1)


Text

m

.o 5

- iTENN gpEE VALLEY AUTHORITY

- A i Lnli.

. CHMMNSOGA. TENNESSEE s74ot 400 Chestnut Street Tcwer II

' '.4 3 Pl: 22 November 28,~1984 e-

_BLRD-50-438/82-20 BLRD-50-439/82-18 U.S. Nuclear Regulatory Commission Region II=

-Attn: Mr. James P. O'Reilly,. Regional Administrator.

101 Mariette Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS.1 AND 2 - OMISSIONS TO AUXILIARY PEEDWATER PUMP DRAWINGS - BLRD-50-438/82-20, ELRD-50-439/82 SEVENTH INTERIM REPORT

'The subject deficiency was initially reported to NRC-0IE Inspector R. ' V.

Crlenjak on February 25, 1983 in accordance with 10 CFR 50.55(e) as

NRC BLN BLP 8207. This_ was.followed by our interim reports. dated March 25,

~

July 20,. September 7, and December:14, 1982, and April 6 and December 5, 1983 Below is our seventh interim report. We expect to submit our next report by May-15, 19.85.

The auxiliary feedwater pump vent, drains, and turbine cooling water-

. interconnecting piping analysis referenced in our sixth report has been completed for unit 1.

The unit 2 analysis is: currently being reviewed.

Further information will be provided in our next report.

h If you have' any questions, please get in touch with R. H. Shell at FTS

'858-2688.

j Very truly yours, TENNESSEE VALLEY AUTHORITY

.m J.

. Hu ger

[

Li nsing and legulations

}

cc:

Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington,'D.C. 20555 Records Center i

Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8412130609 841128

)

PDR ADOCK 05000 S

ge27,/o;

. eoc., o,,o,..

i, e,,.v.,

.