ML20100P054
| ML20100P054 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 11/28/1984 |
| From: | Hufham J TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8412130609 | |
| Download: ML20100P054 (1) | |
Text
m
.o 5
- iTENN gpEE VALLEY AUTHORITY
- A i Lnli.
. CHMMNSOGA. TENNESSEE s74ot 400 Chestnut Street Tcwer II
' '.4 3 Pl: 22 November 28,~1984 e-
_BLRD-50-438/82-20 BLRD-50-439/82-18 U.S. Nuclear Regulatory Commission Region II=
-Attn: Mr. James P. O'Reilly,. Regional Administrator.
101 Mariette Street, NW, Suite 2900 Atlanta, Georgia 30323
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS.1 AND 2 - OMISSIONS TO AUXILIARY PEEDWATER PUMP DRAWINGS - BLRD-50-438/82-20, ELRD-50-439/82 SEVENTH INTERIM REPORT
'The subject deficiency was initially reported to NRC-0IE Inspector R. ' V.
Crlenjak on February 25, 1983 in accordance with 10 CFR 50.55(e) as
- NRC BLN BLP 8207. This_ was.followed by our interim reports. dated March 25,
~
July 20,. September 7, and December:14, 1982, and April 6 and December 5, 1983 Below is our seventh interim report. We expect to submit our next report by May-15, 19.85.
The auxiliary feedwater pump vent, drains, and turbine cooling water-
. interconnecting piping analysis referenced in our sixth report has been completed for unit 1.
The unit 2 analysis is: currently being reviewed.
Further information will be provided in our next report.
h If you have' any questions, please get in touch with R. H. Shell at FTS
'858-2688.
j Very truly yours, TENNESSEE VALLEY AUTHORITY
.m J.
. Hu ger
[
Li nsing and legulations
}
cc:
Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington,'D.C. 20555 Records Center i
Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8412130609 841128
)
PDR ADOCK 05000 S
ge27,/o;
. eoc., o,,o,..
i, e,,.v.,
.