ML20100M642
| ML20100M642 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/21/1984 |
| From: | Nix H GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 50-366-1984-001, 50-366-1984-1, GM-84-1068, NUDOCS 8412120394 | |
| Download: ML20100M642 (2) | |
Text
Georgia Power Company Post Office Box 439 a
Baxley, ieorgi) 31513 Telephone 912 367-7781 912 537-9444 NOV to p j ' 03 GeorgiaPower Edwin 1. Hatch Nuclear Plant November 21, 1984 GM-84-1068 PLANT E.
I.
HATCH Special Report Docket No.
50-366 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 ATTENTION:
Mr. James P. O'Reilly Attached is Special Report No.
50-366/1934-01.
This report is required by Hatch Unit 2 Technical Specifications Section 3.3.6.2, ACTION a.
H.C.
Nix
/
General Manager HCN/TLE/djs xc:
R. J.
Kelly G.
F.
Head J.T.
Beckham, Jr.
P.
D.
Rice K. M. Gillespie S.
B.
Tipps R.
D.
Baker Control Room Document Control g 2(($f 0
0
'U '
s
-}C)
I
e
.y 1
.,j-
^ -:: s '
i jL
).
Lv r
3, s
,i GPECIAL-REPORT-. 50-366/1984-001 1' G 3
n
! 1:,
LICENSEE GEORGIA POWER' COMPANY "Y
I' I FACILITY-NAME EDWIN Is HATCH DOCKET NUMBER
- 53-366-1
.('.
DESCRIPTION OF EVENT:
I On Oc tober.18,-
- 1964, at apFroximately 1700 CDT, during-performance ofi
'" SEISMIC INSTRUMENTATION FT&C" procedure (HNP-1-3980), personnel found blown
' power supply circuit fuses for Triaxial Time-History,
LAccelerographs for the Diesel Generator building-130' elevation'
-( 2 L 51-N021 ),
Reactor Building.87' elevation
~on drywell-pedestal (2L51-NO20), and drywell feedwater inlet to Reactor Pressure' Vessel-(2L51-N004).
Further investigation revealed that the power. supply circuit to 2L51-N004 instrument loop was short circuited which,-in turn, ; blew the common circuit power supply fuse for all of'the above listed - accelerographs.
The shorted power circuit cable to-the 2L51-N004 instrumentation loop was lifted, and the blown fuse was replaced.
2L51-N020 and 2L51-NO21 were returned to operable status.
During the. next extended drywell entry on. Unit 2, the short circuited power supply cable to the 2L51-N004 instrumentation loop will be investigated to.
determine what-repair is necessary.
restore to
- 2L51-N004 to ooerable status.
The 2L51-N004 instrumentation loop will be repaired and returned to operable status.