Special Rept 50-366/1984-001:on 841018,personnel Found Blown Power Supply Circuit Fuses for Triaxial Time History Accelerographs.Caused by Short Circuited & Blown Fuse. Blown Fuse Replaced & Instrumentation Loop Repaired
ML20100M642
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/21/1984
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
50-366-1984-001, 50-366-1984-1, GM-84-1068, NUDOCS 8412120394
Download: ML20100M642 (2)


Text

Georgia Power Company Post Office Box 439 a

Baxley, ieorgi) 31513 Telephone 912 367-7781 912 537-9444 NOV to p j ' 03 GeorgiaPower Edwin 1. Hatch Nuclear Plant November 21, 1984 GM-84-1068 PLANT E.

I.

HATCH Special Report Docket No.

50-366 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 ATTENTION:

Mr. James P. O'Reilly Attached is Special Report No.

50-366/1934-01.

This report is required by Hatch Unit 2 Technical Specifications Section 3.3.6.2, ACTION a.

H.C.

Nix

/

General Manager HCN/TLE/djs xc:

R. J.

Kelly G.

F.

Head J.T.

Beckham, Jr.

P.

D.

Rice K. M. Gillespie S.

B.

Tipps R.

D.

Baker Control Room Document Control g 2(($f 0

0

'U '

s

-}C)

I

e

.y 1

.,j-

^ -:: s '

i jL

).

Lv r

3, s

,i GPECIAL-REPORT-. 50-366/1984-001 1' G 3

n

! 1:,

LICENSEE GEORGIA POWER' COMPANY "Y

I' I FACILITY-NAME EDWIN Is HATCH DOCKET NUMBER

53-366-1

.('.

DESCRIPTION OF EVENT:

I On Oc tober.18,-

1964, at apFroximately 1700 CDT, during-performance ofi

'" SEISMIC INSTRUMENTATION FT&C" procedure (HNP-1-3980), personnel found blown

' power supply circuit fuses for Triaxial Time-History,

LAccelerographs for the Diesel Generator building-130' elevation'

-( 2 L 51-N021 ),

Reactor Building.87' elevation

~on drywell-pedestal (2L51-NO20), and drywell feedwater inlet to Reactor Pressure' Vessel-(2L51-N004).

Further investigation revealed that the power. supply circuit to 2L51-N004 instrument loop was short circuited which,-in turn, ; blew the common circuit power supply fuse for all of'the above listed - accelerographs.

The shorted power circuit cable to-the 2L51-N004 instrumentation loop was lifted, and the blown fuse was replaced.

2L51-N020 and 2L51-NO21 were returned to operable status.

During the. next extended drywell entry on. Unit 2, the short circuited power supply cable to the 2L51-N004 instrumentation loop will be investigated to.

determine what-repair is necessary.

restore to

- 2L51-N004 to ooerable status.

The 2L51-N004 instrumentation loop will be repaired and returned to operable status.