Interim Deficiency Rept 84-16 Re Adequacy of ASME Matl Procurement Documentation.Initially Reported on 841002. Investigation Continuing.Next Rept Will Be Submitted by 850201
ML20100J822
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/28/1984
From: Danni Smith
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
84-16, 9478N, NUDOCS 8412100464
Download: ML20100J822 (2)


Text

pnaA

/ ( Commonwealth Edison

/ L ) one First Nationil Plaza. Chic 1go. Ilknois 7- C 7 Addrtss R: ply to: Post Office Box 767 (j Chicago, Illinois 60690 November 28, 1984 Mr. James G. Keppler Regional Administrator U. S. Nuclear Regulatory Commission Region-III 799 Roosevelt Road

. Glen Ellyn, IL 60137

Subject:

Braidwood Station Units 1 and 2 10 CFR 50.55(e) 84-16 Interim Report ASME Material Procurement Documentation NRC-Docket-Nos.- 50-456/457 References (a): D. H. Smith letter to J. G.-Keppler dated October 2, 1984.

Dear Mr. Keppler:

Reference (a) provided information concerning a potential deficiency reportable pursuant to 10 CFR 50.55(e) regarding the adequacy of ASME Material Procurement Documentation at our Braidwood Station. This letter is provided to update the deficiency description and the status of corrective actions being taken to resolve this issue and is considered an Interim Report.

Description of-Deficiency A sample review of records of past site procured ASME material has indicated that the records do not always indicate that the material was supplied in accordance with the ASME Material Manufacturers and Material Suppliers Quality System Program requirements. Program statements or ASME Quality System Certificates are not always referenced on the documents received

with the material.

The problem with the records was partially identified in 1981 but adequate measures were not established to control the materials and provide complete corrective action to the identified records. An initial review has indicated the following inadequacies which have contributed to the problem:

1. Quality requirements not included on site procurement records.
2. Inadequate documentation reviews during receipt inspections.
3. Inadequate corrective action for ASME material suppliers removed from CECO Approved Bidder List. gg4 8412100464 841128 801 PDR ADOCK 05000456 D t - Z@7

. a w 4.- Procurement of ASME material from vendors with only Safety-Related Approved Programs.

Corrective Action-Taken Based on initial reviews of .the records, on-site procured ASME-materials received prior to October 27, 1981 which were still in stock were put on hold. Project Procedure PFE-100-1 has been approved for the review of the on-site procurred ASME material documentation.

To date essentially all documentation for the materials received before October 27, 1981 has been reviewed. For the subject records, approximately 30% of the certifications require revised or additional

-documentation from the vendors. Additional corrective actions are required to bring approximately 5% of the certifications in compliance with the requirements of ASME Section III. The remaining certifications have been accepted or are awaiting minor corrective actions and/or clarifications to associated records. As the certifications are determined to be acceptable, the materials are released from hold. It is expected that the review of all records will be completed by January 15, 1985.

The reviews to date have indicated that a small percentage of the certifications do not support all the technical requirements of the material specifications. The extent and significance of this issue is being investigated.

An interim report will be submitted by February 1, 1985 following completion of the document reviews. Please address any questions that you or your staff may have concerning this matter to this office.

Verftrulyyprs,

~

kJL David H. Smith Nuclear Licensing Administrator cc: NRC Resident Inspector - Braidwood Director of. Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 9478N i