ML20100E518

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept (55(e)-84-45) Re Cable Terminations Involving Heat Shrinks or Tape Completed W/O QC Witnessing. Initially Reported on 841017.Final Rept Will Be Submitted by 841221
ML20100E518
Person / Time
Site: Nine Mile Point 
Issue date: 11/16/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)-84-45), (NMP2L-0243), (NMP2L-243), NUDOCS 8412060270
Download: ML20100E518 (2)


Text

.-

N3Mi'Je NIAGARA MOHAWK FOWER CORPORATION /300 ERIE BOULEVARD WEST SYRACUSE. N Y 13202/ TELEPHONE (315) 4741511 November 16, 1984 (NMP2L 0243)

Mr. R, W. Starostecki, Director U. S. Nuclear Regulatory Comission Region I Division of Project and Resident Progroiins 631 Park Avenue King of Prussia, PA 19406 I

Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an interim report, in accordance with 10CFR50.55(e), for the problem concerning the Category I cable terminations, involving heat shrinks or tapes, that were not witnessed by Field Quality Control.

This problem was reported via tel-con to W. Lazarus of your staff on October 17, 1984.

Very truly yours, C. V. Mangan Vice President Nuclear Engineering and Licensing CVM/GG/dd Enclosure xc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gramm, NRC Resident Inspector Project File (2) 8412060270 841116 PDR ADOCK 05000410 g

PDR I

I i

il.3L

-a- '...

NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Cable Terminations Involving Heat Shrinks or Tape (55(e)-84-45)

Description of the Problem The problem concerns the Category I cable terminations, involving heat shrinks or tapes, that were completed without witnessing by Field Quality Control.

Specification No.

NMP2-E061 A specifies all Quality Assurance Category I terminations and splices involving heat shrinks or tapes, prior to the application of heat shrinks or tapes, to be mandatory hold points requiring witnessing by Field Quality Control.

The matter is still under-investigation and a final report will be submitted by December 21, 1984.

4