Deficiency Rept Re Magnetrol Level Switches.Final Rept Will Be Submitted 850520,per 850130 Telcon.Extension Needed for GE to Complete Analysis
ML20100D365
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/05/1985
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(NMP2L-0359), (NMP2L-359), NUDOCS 8504020421
Download: ML20100D365 (1)


Text

,

N3LT4A NIAGARA MOHAWK POWER b..PORAT10N/300 ERIE BOULEVARD WEST. SYRACUSE. N Y.13202/ TELEPH March 5, 1985 (NMP2L 0359)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

The final report in accordance with 10CFR50.55(e) concerning the Magnetrol level switches will be submitted to the Nuclear Regulatory Commission by May 20, 1985, instead of February 4,1985. This extension was confirmed in a telecon between Mr. Gary Griffith (Nine Mile Point Unit #2 Nuclear Licensing) and Mr. W. Lazarus of your staff on January 30, 1985. The extension is needed for General Electric to complete their analysis.

Very truly yours, C. V. Ma an Vice President Nuclear Engineering & Licensing AFZ:Ja xc : Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gram, NRC Resident Inspector Project File (2) 8504020421 850305 PDR ADOCK 05000410 1