Georgia Power Company 40 jnvernens, Center Parkway Post Omce Bos 1295 B:rmingham. Atabama 35201 Telephone 205 877-7122 L
Georgia Power
- c. x. uccoy Vce Presdent. Nuclear Vogtle Propct the southten electrc system January 26, 1996 LCV-0474-B Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT PRESSURE AND TEMPERATURE LIMITS REPORTS By letter dated August 3,1995, Georgia Power Company (GPC) submitted draft Pressure and Temperature Limits Reports (PTLRs) for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. The draft PTLRs were submitted in support of our proposed conversion of the existing VEGP Units 1 and 2 Technical Specifications (TS) to the improved TS based on NUREG-1431. In response to our August 3,1995, submittal, the NRC staff requested additional information which has necessitated a revision to our August 3,1995, submittal. is a revised PTLR for Unit 1, and Enclosure 2 is a revised PTLR for Unit 2 in response to NRC staff concerns. In addition to the revised PTLRs, a revised markup of section 5.6.6 (page 5.0-21) of the proposed VEGP improved TS is included as Enclosure 3.
The revised markup of page 5.0-21 ensures that the first revision of the heatup and cooldown limits and/or power operated relief valve (PORV) setpoints after initial implementation of the PTLRs will be subject to prior NRC review and approval. Subsequent revisions will be made in accordance with NRC-approved methodology without prior NRC approval.
The enclosed proposed change modifying page 5.0-21 of our proposed conversion to the improved TS is consistent with thejustifications and significant hazards evaluations already provided by our letters dated May 1,1995,(LCV-0603) and December 21,1995 (LCV-0603-D).
l Sincerely, 290010 C. K. McCoy CKM/NJS 9601290223 960126 h
PDR ADOCK 05000424 i
P PDR i
l
\\
U. S. Nuclear Regulatory Commission LCV-0474-B Page 2 Enclosures 1,2, and 3 xc:
Georgia Power Comnany l
Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS-U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR i
Mr. C. R. Ogle, Senior Resident Inspector, Vogtle j
i i
f j
i i
. e - % w i,y 5 a w.eeud,4a-Mm____mem - 4a64.e. W L ear, 4*amA+4.a4.u e A.-anam,.J 4
-34 A4meJe.m&.4e,4-g, eh.& aw.e=
n.-m.h4.edM4.N2Sa a. 645. N 6AL2JM.*damW h daeAwm.Mo4.ha 4 _se