AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-293 UNIT Pilarim 1 DATE March 14.1985 COMPLETED 8Y P. Hamilton TELEPHONE (617)746-7900 MONTH February 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 599.
17 0.
2 508.
18
- 237, 3
519.
19 575.
4 518.
20 651.
5 517.
21 643.
6 518.
22 661.
7 517.
23 662.
8 506.
24 667.
9 89.
25 668.
10 0.
26 667.
11 0.
27 606.
12 0.
28 668.
13 0.
29 N/A 14 0.
30 N/A 15 0.
31 N/A 16 0.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
4
, tL 1Y t\\.l R
j
n OPERATING DATA REPORT
. DOCKET NO.
50-293 DATE March 14.19R5 COMPLETED BY P. Hamilton TELEPHONE (617)746-7900
-OPERATINA STATUS i
1.
Unit Name Pilarim 1 Notes 2.
Reporting Period February 1985
- 3. ' Licensed Thermal Power (MWt) 1998 4.
Nameplate Rating (Gross MWe) 678 5.
Design Electrical. Rating (Net MWe) 655 6.- Maximum Dependable Capacity (Gross MWe) 683 7.
Maximum Dependable Capacity (Net MWe) 663 8.
.If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
- 9.. Power Level To Which Restricted, If Any (Net MWe)
None
- 10. Reasons For Restrictions, If Any N/A This Month Yr-to-Date Cumulative
-11. Hours In Reporting Period 672.0 1416.0 107160.0
.12. Number Of Hours Reactor Was Critical 496.0 1096.0 71012.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 469.3 1026.3 68594.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 800232.0 1622736.0 118574544.0
- 17. Gross Electrical Energy Generated (MWH) 274820.0 552880.0 39785094.0
- 18. Net Electrical Energy Generated (MWH) 264132.0 530629.0 38227556.0
- 19. Unit Service Factor 69.8 72.5 64.0
- 20. Unit Availability Factor 69.8 72.5 64.0
- 21. Unit Capacity Factor (Using MDC Net) 59.3 56.5 53.8
- 22. Unit Capacity Factor (Using DER Net) 60.0 57.2 54.5 3
- 23. Unit Forced Outage Rate 27.3 26.1 9.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
_ _.. - -. -. _ _, _. ~.. _..., _ _ _, _ _ _ _ _ _, _ _... _ _. _.,,
_, _ _. _. - _ _ _ _ _ _ _,. _.. ~ _. ~
-BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Doerational Summary for February 1985 The unit was operating at 100% on the first of the month when it became necessary to isolate the "B" steam line due to a timing problem with the inboard MSIV. This'resulted in a power reduction to 75% which continued through the eighth.
l Problems with the "A" recirculation pump motor resulted in a manual shutdown of the reactor on'the tenth. The reactor remained shut down until the fifteenth during which time the recirculation pump motor thrust bearing was replaced and the "B" inboard MSIV was repaired.
The reactor was made critical on.the fifteenth at which time the vessel drain line was found to be leaking.. The: reactor was placed in cold shutdown. The leak was repaired and, on the eighteenth, the generator was synchronized to the grid.
Power was increased to 100% on the twentieth and was maintained until the twenty-sixth at which time power was reduced to approximately 75% due to erratic operation of the "A" feedwater control valve proportional amplifier.
Upon replacement of the amplifier on the twenty-seventh, power was increased L
to 100% and was amintained through the end of the month.
Safety Relief Valve Challenges Month of February 1985 ~
Requirement: NUREG-0737 T.A.P.
II.K.3.3 Date:
February 15, 1985 Valve #: SRV-203-3A Reason:
Test after replacement of Top Works I
t-
]
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-293 UNIT NAME Pilgrim 1 DATE March 14.1985 COMPLETED BY P. Hamilton TELEPHONE (617) 746-7900 REPORT MONTH February 1985 METHOD OF LICENSE CAUSE & CORRECTIVE DURATION SHUTTING EVENT SYSTEM COMPONENT ~
ACTION TO NO.
DATE TYPEI (HOURS) REASON 2 DOWN REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE 4
2/1/85 5
0.0 8
N/A N/A JM ISV Power reduced for maintenance.
5 2/10/85 F
138.0 A
1 85-003 AD M0 Cause attributed to insufficient lubrication resulting from an oil leak.
Corrective action was i
to replace damaged components in recirc.
pump motor.
6 2/15/85 F
64.7 A
1 85-004 CE PSP Cause attributed to porous socket weld between valve and pipe i
spool piece. Corrective 1
action was to replace j
the spool piece and provide a new socket I
weld.
1 7
2/26/85 F
0.0 A
N/A N/A SJ AMP Power reduced for maintenance.
1 2
2 3
4&5 i
F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H l
S-Sched 8-Maint or Test G-Oper Error 2-Manual Scram Instructions for j
C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report I
& License Examination 9-Other (LER) File (NUREG-1022) 1 l
A REFUELING INFORMATION The following refueling information is included in the Monthly Report as
. requested in an NRC letter to BECo, dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
1.
The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
2.
Scheduled date for next Refueling Shutdown: August 1986 3.
Scheduled date for restart following refueling: November 1986 4.
5.
Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6..'The new fuel, which was loaded during the 1983-84 refueling outage, is of the same P8x8R design, as loaded the previous outage and consists of 160 P80RB282 assemblies.
In addition, 32 GE68-P80RB282 assemblies were also loaded.
7.
.(a) There are 580 fuel assemblies in the core.
(b) There are 1,128 fuel assemblies in the spent fuel pool.
8.
(a) The station is presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel assemblies at present.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
9.
With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 642 fuel assemblies.
nth February 1985 PILGRIM NUCLEAR POWER STATION MAJOR SAFETY RELATED MAINTENANCE CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT ASSOCIATED RECURRENCE LER Main A0-203-2D Closing Time Component Replace 4-Way Valve None: Rcutine N/A Steam (MSIV)
Adjustment Wear and 2-Way Solenoid.
Maintenance Retimed Valve Main A0-203-1B Closing Time Component Replace 4-Way Valve. None: Routine N/A Steam (MSIV)
Adjustment Wear Retimed Valve Maintenance Main M0-220-1 Would not open.
Motor Replaced motor.
None: Routine N/A Steam Main Steam Malfunction Maintenance Line Drain Main Channel A Alarm came in Unknown Performed None N/A Steam Half Scram for no apparent surveillances reason.
to verify alarm circuit.
M=in SV-203-3A Top Works Seat Unknown Replaced top works.
To be determined.
N/A Steam Leakage Feed-
"A" Feed-Loss of Signal Prop. Amp.
Replaced Prop.
None water water Control Malfunction Amp.
Valve Reactor Vessel Drain Leaking at Probable Replaced section To be determined 85-004 to Water Line Weld Porous Weld of pipe, and pending be issued.
Cleanup re-welded.
investigation results.
Recirc.
"A" Recirc.
Would not Lack of Replaced damaged None 85-003 Pump Motor operate.
lubrication components, due to oil leak.
BOSTON EDISON COMPANY B00 EDYLSTON STREET BOSTON MASSACHUSETTS 02199 WILLIAM O. HARRINGTO N coween wies passimenet ro om.
March 14,1985 BEco Ltr._#85-055 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn: Document Control Desk License No. DPR-35 Docket No. 50-293
Subject:
February 1985 Monthly Report
Dear Sir:
In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.
Respectfully submitted, W. D. Harrington
- caw Attachment cc: Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406