ML20099K784

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1985
ML20099K784
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/1985
From: Alden W, Logue R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8503200370
Download: ML20099K784 (10)


Text

.-,-

UPtMA11Nb UAIA ktPUMB 1

DOCKET NO. 50 - 277 DATE MLRCH 15.1985 CCMPLETED BY PHILADELPHIA ELECTRIC COMPANY i-W.H.ALDEN ENGINEER-IN-CHARGE

- i LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS m

b;

7. UNIT NAME PEACH BOTTOM UNIT 2 1 NOTES: UNIT 2 CCNTINUED ITS l

l l

2. REPCRTING PERIOD FEBRUARY. 1985 l

SCHEDULED SHUTDOWN FOR l

l l

3. LICENSED THERMAL P0hER(HWT):

3293 I

ITS SIXTH REFUELING AND l

~

l l

4. NAMEPLATE R ATING -(GROSS MWEl s 1152 l

HAINTENANCE OUTAGE.

l 4

l 3

S. DESIGN ELECTRICAL RATING (NET MWE)*

1065 I

i 1 -i g

g

.s

6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWEl s 1098 l

l J

l 3

- ;);

7. HAXIMUM DEPENDABLE CAPACITY (NET HWEls 1051 l

l 4

8.

IF CHANGES DCCUR IN C APACITY PATINGS (ITEMS NUMEEP 3 THROUGH 7) SINCE LAST REPORT. GIVE REA50r

]

4

9. POWER LEVEL TO HHICH RESTRICTED, IF ANY (NET MWElt
10. RE ASONS FCP RESTRICTICNS. IF ANY:

3 9

THIS HONTH YR-10-DATE CUMULATIVE m w m

11. HOURS IN REPCRTING PERIOD 672 1.416 93.408 d;

l

12. NUMBER OF HOURS REACTOR WAS CRITICAL 0

0 62.283.6 m

~

3

13. REACTOR RESERVE SHUTODWN HOURS 0.0 0.0 0.0 7
14. HOURS GENERATOR ON-LINE 0.0 0.0 60,556.6

. 3

_n

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i

n

16. GROSS THERMAL ENERGY GENERATED (HWH) 0 0

178.420.001 p

17. GROSS ELECTRICAL ENERGY GENER ATED (MWH) 0 0

58.718.660

- a

18. NET ELECTRICAL ENERGY GENERATED (MWH)

-4.836

-8.640 56.253.698 l

4

19. UNIT SERVICE FACTOR 0.0 0.0 64.8

- 9 3

20. UNIT AVAILABILITY FACTOR 0.0 0.0 64.8 t

T

((m 21. UNIT CAPACITY FACTOR (USING HDC NET) 0.0 0.0 57.3

[

. auxa J N CCL 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.5 NO

~~~~~~~~~~~~

~~~~~~~~~~~~

    • ~~~~~~~~~~

O ulv)

23. UNIT FORCED CUTAGE RATE 0.0 0.0 12.5 3'

gp3

24. SHUIDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH)*

C33C ht SCHEDULEC SHUTDOWN FOR REFUELING AND MAINTENANCE.

.. ?

09 0 STARTED 4/27/84

- j OQ h$#

25. IF SHUTD0hh AT END OF REPORT PERIOD. ESTIMATE 0 CATF OF ST ARTUFt 05/08/85 y

nOE

26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATIDN):

FORECAST ACHIEVED U3Q CD o.2 INITIAL CRITICALITY INITIAL ELECTRICITY 4

COMMERCIAL OPERATION y J}{ /'

_. 2

^

,.,,....,,,_.,~,m......,,.,

OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE M ARCH 15,1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 l NOTES UNIT 3 INCURRED ONE SCHEDULED l l

g

2. REPCRTING PERIODI FEBRUARY, 1925 l

OUTAGE.TO ACCOMODATE l

i

3. LICENSED THERMAL POWER (MWT):

3293 l

$URVEILLANCE TESTING.

l l

l

4. NAMEPLATE RATING (GROSS MWElf 1152 l

I g

g

5. DESIGN ELECTRICAL RATING (NET MhE):

1065 l

l g

6. MAXIMUM DEPEkDABLE CAPACITY (CROSS MWEl f 1098 l

l l

l

7. MAXIMUM DEPENDABLE LAPACITY (NET MWEl t 1035 l

l

8. IF CHANGES CCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REAS@
9. POWER LEVEL TO WHICH RESTRICTED, IF AhY (NET MWE)*
10. REASONS FCR RESTRICTIONS. IF ANY*

THIS HONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPCRTING PERIOD 672 1.416 89,304
12. NUMBER OF HOURS REACTOR WAS CRITICAL 56.2 800.2 65.357.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 1
14. HOURS GENERATOR ON-LINE 18.4 753.0 63,618.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERM AL ENERGY GENER ATED (MWH) 51.048 2.103,768 186.303.576
17. GROSS ELECTRICAL ENERGY GENER ATED (MWH) 13.350 696.220 61.203.760
18. NET ELECTRICAL ENERGY GENERATED (MWH) 8,187 669,571 58.778,873
19. UNIT SERVICE FACTOR 2.7 53.2 71.2
20. UNIT AVAILABILITY FACTOR 2.7 53.2 71.2 f
21. UNIT CAPACITY FACTOR (USING MCC NET) 1.2 45.7 63.6
22. UNIT CAPACITY FACTOR (USING DER NFT) 1.1 44.4 61.8
23. UNIT FORCED OUTAGE RATE 0.0 1.2 7.4
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND OURATION OF EACH)*

REFUELING ANC MAINTENANCE DUT AGES FROM 5/11/85 F0F 8 WEEKS LNTIL 7/05/85.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt 03/01/85
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATICN):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE MARCH 15,1985 COMPANY PHILACELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH FEBRUARY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWE-NET)

(MWE-NET) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

1 7

0 23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

14 0

15 0

16 0

AVERAGE DAILY UNIT. POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE MARCH 15,1985 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN l

ENGINEER-IN-CHARGE l

LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH FEBRUARY 1985 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

'(MWE-NET)

(MWE-NET) 1 536 17 0

2 0

18 0

3

.0 19 0

[

r 4

0 20 0

5 0

21 0

6 0

22 0

)

7 0

23 0

8 0

24 0

l 9

0 25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

14 0

15 0

16 0

i

u q

.~.

UNIT SNUTDCWNS AND POWER REDUCTIONS DCCKET NO. 50 - 277 LNIT NAME PEACH BOTTDM UNIT 2 DATE MARCH 15,1985 REPORT MCNTH FEBRUARY. 1985' C0stPLETED BY PHILADELPHI A ELECTRIC CDNPANY W.M.ALDEN ENGINEER-IN-CHARGE LICEN!!EG SECTION GENERATIDN DIVISION-NUCLEAR TELEPHONE (215) 841-5022 I

I I

l l METHOD OF l LICENSFE ISYSTEMICOMPONENTI CAUSE ANr CORRECTIVE I

ITYPEIDLRATIONIREASONISHUTTING DOWNI EVFNT l CODE I CODE l ACTIPN TO ND.I DATE I (131 (HCUR$11 (2) I REACTOR (3) l REPORT C 1 (4) 1 (5) l PREVENT RECURRENCE I

I I

I I

I I

I I

1 1 850201 1 5l 672.0 1 C l I

l NA l RC I FUELXX l StdTDOWN FOR ITS SIXTH REFUELING. MAINTENANCE, l

l l

l l

l 1

-l l AND MAJOR MODIFIC AT ION OUTAGE.

I I

I ----- 1 I

I I

I I

l l

l 672 0 l l

l l

l l

(1)

(2)

(3)

(4)

F - FO CED EEASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (E XPL AIN) 1 - MANUAL FOR PREPARATION OF DATA B - PAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - KEFUCLING 3 - AUTOMATIC SCRAM.

EVENT REPDRT (LER)

D - REGUL ATORY RE STRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - CPERATOR TRAINING + LICENSE EXAMINATION F - ACHINISTeaTIVE (5)

G - CPERATICNAL ERROR (EXPLAIN)

H - DTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE O

.a.

. 4.

=

UNIT SHUTDCWNS AhD POWER REDUCTIDMS DCCKET NO. 50 - 2T8 UNIT NAME PEACH BOTTOM UNIT 3 DATE MARCH 15,1985 REPORT MCNTH FEERUARY, 1965 CCMPLETED BY PHILADELPHIA ELECTRIC COMPAhY W.M.ALDEN E NG INEE R-IN-CH AR GE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 l

l l

l l METHOD CF l LICENSEE lSYSTEMICOMPONENTI CAUSE AND CORRECTIVE I

lTYPElDLRATIDNIREASCNISHUTTING DOWN!

EVENT l CODE I CCDE I ACTION TO NO.I DATE I (Ili (HOURS)I (2) i REACTOR (3) l REPORT C l (4) l (5) l PREVENT RECURRENCE I

I I

I I

l i

I i

4 I E50201 1 5 i e53.6 i B l 1

I N/A I CD l VALVEX l MINI-0UTAGE FOR SURVEILLANCE TESTING AND I

I l

l 1

l l

l l MAINTENANCE (MAIN STEAM ISDLATION VALVES 1

l l

l l

1 l

1 l AND LEAK TESTING).

I I

I ----- 1 I

I I

1 l

l l

1 653.6 1 1

1 l

l I

(1)

(2)

(3)

(4)

F - FORCED REASCN METHOD EXHIBIT G - INSTR UCT IONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPL AIh) 1 - MANU AL FOR PREPARATION OF D ATA B - PAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - CPERATOR TRAINING + LICENSE EXAMINATION F - ACHINISTRATIVE (5)

G - CPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE l

}

Docket No. 50-277 Attachment to Monthly Operating Report for February, 1985 REFUELING INFORMATION 1.

Name of. facility:

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

April 27, 1984 - In progress

-3.

Scheduled date for restart following refueling:

May 8, 1985 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel.

Modifications to reactor core operating limits.

5.

Scheduled date (s) for submitting proposed licensing action and supporting information:

Reload 6 license amendment application submitted September 7, 1984.

6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedurcs:

None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a)

Core - 764 Fuel Assemblies to be returned from fuel pool (b)

Fuel Pool - 1170 Fuel Assemblies, 58 Fuel nods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested'or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the. spent fuel pool assuming the present licensed capacity.

September, 1990 (March, 1986, with reserve full core discharge)

pr

-e L>.

Do:het No. 50-273 Attachment to Monthly Operating Report for February, 1985 REFUELING INFORMt. TION

1.. Name of facility:

Peach Bottom Unit 3 2

Scheduled'date for next refueling shutdown:

May 11, 1985 3.

Scheduled date for restart following refueling:

July 5, 1985 4.

tiill refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel.

Modifications to reactor core operating limits.

5.

Scheduled date (s) for submitting proposed licensing action and supporting information:

MAPLUGR Limits Submitted January 7, 1905 Additional Core Limit Information - April 12, 1985 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a)

Core - 764 Fuel Accomblics (b)

Fuel Pool - 1212 Fuel Assemblies, 6 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to r

the spent fuel pool assuming the prorent licensed capacity.

September, 1991 (March,1987, with reserve for full core discharge) e

e

4.

v' Docket nos. 50-277/50-278 s

Attachment to !!onthly Operating Report for Feburary, 1985 Peach Bottom Atomic Power Station Narrative Summary of Operating Experiences February, 1985

' UNIT 2 The Refueling / Pipe Replacement outage continued throughout the month of February.

Unit 2 is c: pected to return to service in early May.

4-Pipe replacement status of.2/28/85 is as follows:

All 10

. recirculation riser safe-ends are installed.

Major piping work is expected to be completed by March 8, 1985.

UNIT 3 On February 1, the unit was taken out-of-service to perform required surveillance tests.

Three of the eight Main Steam Isolation Valves (MSIV's) tested failed local leak rate testing and required repair prior to restart.

Startup was begun on February 25, 1985.

However, delays in

. returning the unit to service were experienced due to the need to repair 71L relief valve bellows and replacement of a solenoid valve which prevented closure of a reactor head vent valve (AO-17).- Following repair of a drywell airlock dcor seal, the unit was returned to service on March 1, 1985.

-/SLZ l

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 1215)841 4000 March 15, 1985 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention Document Control Desk

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlement Attached are twelve copics of the monthly operating report for Peach Dottom Units 2 and 3 for the month of February, 1905 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.

Very truly yours, 7

R. II. Logue Superintendent Nuclear Services Attachment cca Dr. T.

E. Murley, NRC Mr. T.

P. Thompson, Resident Inspector Mr. Stan P. Mangi, Dept. of Envir. Resourcos Mr.

P. A. Rosc, NRC (e copics)

INPO Records Conter

.[.