Public Service Electr6c and Gas Company

[-

Thomas J. Martin 80 Park Plaza, Newark, NJ 07101 201-430L8316 Mailing Address: P.O. Box 570, Newark, NJ 07101 Vico PrnMet Engineering and Constructicn November 2, 1984 t

L l

Dr. Thomas E. Murley, Administrator l

U. S. Nuclear Regulatory Commission l

Office of Inspection and Enforcement i

Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Dr. Murley:

SIGNIFICANT CONSTRUCTION DEFICIENCY BIF BUTTERFLY VALVES HOPE CREEK GENERATING STATION On August 31, 1984, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr. E.

Kelly, advising of a potentially significant construction deficiency concerning butterfly valves supplied by BIF Industries.

On September 28, 1984, an interim report was sent to your office.

The following interim report is provided in accordance with 10CFR50.55 (e).

Our Architect Engineer and Constructor, Bechtel, has reviewed Purchase Order P-305 (0) and identified a total of sixty-nine (69) valves having aluminum bronze discs.

Bechtel is uti-lizing a simple nitric acid test to verify disc pin material.

To date, twenty-two (22) valves have been checkel.

Four (4) thirty-six inch valves have been identified as having disc pins made of incorrect material and eighteen (18) valves of various sizes have pins of the proper composition.

Bechtel has replaced the disc pins on the two (2) thirty-six inch valves installed in Unit No. 1 and anticipates completing

[

all such testing by February 15, 1985.

l I

l t

I I

4

/ G. A 7

Dr. T. E. Murley 2

11/2/84 We anticipate providing you with our final report by March 1, 1985, to include our safety analysis and detailc concerning our corrective action.

Very truly yours, C Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.