ML20099H729
Letter Sequence Other | |
---|---|
TAC:M83989, (Open) | |
Initiation
Administration Questions
| |
MONTHYEARML20099H7291992-08-14014 August 1992
[Table View]Forwards Addl Documentation to Facilitate Review of FCS DG Ambient Air Temp Operating Limits,Including Engineering Calculation Fc 05916 & 10CFR50.59 Rept Project stage: Other ML20127F2701992-09-28028 September 1992 Technical Evaluation Rept Fort Calhoun Station Emergency Diesel Generating Max Temp Operating Limits, Interim Rept Project stage: Other ML20128C3061992-11-24024 November 1992 Forwards SAIC-92/6903, TER Fort Calhoun Station Emergency DG Maximum Temp Operating Limits, Project stage: Other 1992-08-14 |
ML20099H729 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 08/14/1992 |
From: | Gates W OMAHA PUBLIC POWER DISTRICT |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML20099H730 | List: |
References | |
LIC-92-289R, TAC-M83989, NUDOCS 9208190169 | |
Download: ML20099H729 (1) | |
Similar Documents at Fort Calhoun | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999
[Table view]Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999
[Table view]Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 LIC-99-0061, Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl1999-06-30030 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl LIC-99-0056, Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-061999-06-22022 June 1999 Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-06 LIC-99-0059, Provides Formal Notification to NRC of Plans Re Renewal of Operating License DPR-40 for Unit 1.Util Will Continue to Inform NRC of Decisions Relative to License Renewal in Order to Facilitate NRC Resource Planning1999-06-22022 June 1999 Provides Formal Notification to NRC of Plans Re Renewal of Operating License DPR-40 for Unit 1.Util Will Continue to Inform NRC of Decisions Relative to License Renewal in Order to Facilitate NRC Resource Planning LIC-99-0054, Forwards Manual Containing Description of Fort Calhoun Station 1999 Emergency Preparedness Exercise, to Be Conducted on 9908101999-06-0808 June 1999 Forwards Manual Containing Description of Fort Calhoun Station 1999 Emergency Preparedness Exercise, to Be Conducted on 990810 LIC-99-0052, Forwards Fort Calhoun Station Performance Indicators, for Apr 19991999-06-0202 June 1999 Forwards Fort Calhoun Station Performance Indicators, for Apr 1999 LIC-99-0045, Forwards Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated NDTT Shift Curve & LTOP Limits & Values from FCS TS to OPPD Controlled Document.Rev 3 to TR CE NPSD-683 & Supporting TSs Encl1999-05-26026 May 1999 Forwards Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated NDTT Shift Curve & LTOP Limits & Values from FCS TS to OPPD Controlled Document.Rev 3 to TR CE NPSD-683 & Supporting TSs Encl LIC-99-0046, Forwards Scope & Objectives for Plant 1999 EP Exercise to Be Conducted 990810.Info Provided Ninety Days Prior to Exercise IAW Established Stds.Complete Scenario Package Will Be Submitted to NRC & FEMA Sixty Days Prior to Exercise1999-05-12012 May 1999 Forwards Scope & Objectives for Plant 1999 EP Exercise to Be Conducted 990810.Info Provided Ninety Days Prior to Exercise IAW Established Stds.Complete Scenario Package Will Be Submitted to NRC & FEMA Sixty Days Prior to Exercise LIC-99-0028, Provides NRC with Status of Corrective Actions Re Plant Fire Protection Program,As Result of NRC Insp Rept 50-285/97-06. Mod to MOV Is in Design Phase & Currently Scheduled for Installation During 1999 Refueling Outage1999-04-30030 April 1999 Provides NRC with Status of Corrective Actions Re Plant Fire Protection Program,As Result of NRC Insp Rept 50-285/97-06. Mod to MOV Is in Design Phase & Currently Scheduled for Installation During 1999 Refueling Outage LIC-99-0036, Submits Annual Rept of 1998 Loca/Eccs Models Per 10CFR50.46. Small & Large Break LOCA PCT Values Continue to Remain Less than 10CFR50.46(b)(1) Acceptance Criterion of 2200 F1999-04-28028 April 1999 Submits Annual Rept of 1998 Loca/Eccs Models Per 10CFR50.46. Small & Large Break LOCA PCT Values Continue to Remain Less than 10CFR50.46(b)(1) Acceptance Criterion of 2200 F LIC-99-0043, Forwards Fort Calhoun Performance Indicators Rept for Mar 19991999-04-28028 April 1999 Forwards Fort Calhoun Performance Indicators Rept for Mar 1999 LIC-99-0041, Informs That Util Has Implemented Necessary Actions Associated with Open TACs M92926,M99885,M98619 & M98933 Issues.Items Considered Ready to Close,Subject to Agreement by Nrc/Nrr Project Manager1999-04-27027 April 1999 Informs That Util Has Implemented Necessary Actions Associated with Open TACs M92926,M99885,M98619 & M98933 Issues.Items Considered Ready to Close,Subject to Agreement by Nrc/Nrr Project Manager LIC-99-0037, Responds to NRC 990126 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Response Confirms with NRC & NEI Recommendations to Utilize Generic Industry Response to Issue1999-04-26026 April 1999 Responds to NRC 990126 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Response Confirms with NRC & NEI Recommendations to Utilize Generic Industry Response to Issue LIC-99-0039, Forwards Diskette Containing 1998 Annual Rept of Individual Monitoring for Fcs,Per 10CFR20.2206.Diskette Follows File Structure of Reg Guide 8.7,App a1999-04-20020 April 1999 Forwards Diskette Containing 1998 Annual Rept of Individual Monitoring for Fcs,Per 10CFR20.2206.Diskette Follows File Structure of Reg Guide 8.7,App a LIC-99-0038, Forwards 1998 Radiological Environ Operating Rept & Annual Rept for TS Section 5.9.4.A for 980101-981231, for Fcs,Unit 1.Rept Is Presented in Format Outlined in Reg Guide 1.21,rev 1.Results of Quarterly Dose Calculations,Encl1999-04-20020 April 1999 Forwards 1998 Radiological Environ Operating Rept & Annual Rept for TS Section 5.9.4.A for 980101-981231, for Fcs,Unit 1.Rept Is Presented in Format Outlined in Reg Guide 1.21,rev 1.Results of Quarterly Dose Calculations,Encl LIC-99-0033, Forwards Addl Info to Support NRC Review of Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps1999-04-15015 April 1999 Forwards Addl Info to Support NRC Review of Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps LIC-99-0035, Forwards Proprietary Rev 2b to FCS Emergency Plan Form FC-EPF-17 & non-proprietary Revised FC-EPF Forms Index,Rev 5a to FC-EPF-1 & Rev 4 to FC-EPF-15.Proprietary Info Withheld from Public Disclosure1999-04-0808 April 1999 Forwards Proprietary Rev 2b to FCS Emergency Plan Form FC-EPF-17 & non-proprietary Revised FC-EPF Forms Index,Rev 5a to FC-EPF-1 & Rev 4 to FC-EPF-15.Proprietary Info Withheld from Public Disclosure LIC-99-0031, Forwards Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate1999-03-31031 March 1999 Forwards Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0032, Forwards Fort Calhoun Station Performance Indicators, for Feb 19991999-03-31031 March 1999 Forwards Fort Calhoun Station Performance Indicators, for Feb 1999 LIC-99-0029, Forwards Response to 990226 RAI for GL 97-05, SG Tube Insp Techniques1999-03-30030 March 1999 Forwards Response to 990226 RAI for GL 97-05, SG Tube Insp Techniques LIC-99-0027, Forwards Rev 16B to FCS Site Security Plan,Rev 2 to FCS Safeguards Contingency Plan & Rev 6 to FCS Training & Qualification Plan.Encls Withheld1999-03-16016 March 1999 Forwards Rev 16B to FCS Site Security Plan,Rev 2 to FCS Safeguards Contingency Plan & Rev 6 to FCS Training & Qualification Plan.Encls Withheld LIC-99-0022, Agrees with NRC Request That Proposed Wording of USAR Section 9.2.5 Included in Be Revised to Indicate That Use of Letdown Sys Following Transient.Revs of Appropriate Pages to ,Encl1999-03-12012 March 1999 Agrees with NRC Request That Proposed Wording of USAR Section 9.2.5 Included in Be Revised to Indicate That Use of Letdown Sys Following Transient.Revs of Appropriate Pages to ,Encl LIC-99-0024, Informs That OPPD Withdraws Applications Submitted by 950626 &1999-03-12012 March 1999 Informs That OPPD Withdraws Applications Submitted by 950626 & LIC-99-0016, Requests Relief from Certain Requirements of Paragraphs IWA- 5242(a) & IWA-5250(a)(2) of ASME Section Xi,For Remainder of Third 10-year Insp Interval on Basis of Attached Proposed Alternatives1999-03-0101 March 1999 Requests Relief from Certain Requirements of Paragraphs IWA- 5242(a) & IWA-5250(a)(2) of ASME Section Xi,For Remainder of Third 10-year Insp Interval on Basis of Attached Proposed Alternatives LIC-99-0023, Forwards FCS Performance Indicators for Jan 19991999-03-0101 March 1999 Forwards FCS Performance Indicators for Jan 1999 LIC-99-0020, Forwards non-proprietary EPIP Index,Page 1 of 2,rev 31 to EPIP-OSC-1, Emergency Classification, FC-EPF Forms Index, Page 1 of 2, Rev 8 to FC-EPF-14 & Rev 15 to RERP-Appendix a, Rerp. Proprietary Version of Rev 15 to RERP, Included1999-02-24024 February 1999 Forwards non-proprietary EPIP Index,Page 1 of 2,rev 31 to EPIP-OSC-1, Emergency Classification, FC-EPF Forms Index, Page 1 of 2, Rev 8 to FC-EPF-14 & Rev 15 to RERP-Appendix a, Rerp. Proprietary Version of Rev 15 to RERP, Included LIC-99-0011, Forwards 1999 Biennial Decommissioning Funding Status Rept for Fort Calhoun Station,Unit 11999-02-0505 February 1999 Forwards 1999 Biennial Decommissioning Funding Status Rept for Fort Calhoun Station,Unit 1 1999-09-08 |
Text
.
C Omaha Public Power utstrict 444 South 16th Street Mall Omaha, Nebraska 68102-2247 August, 14, 1992 402/636-2000 LIC-92-289R U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, DC 20555
Reference:
- 1. Docket No. 50-285
- 2. Letter from OPPD (W. G. Gates) to NRC (Document Control Desk) dated June 30, 1992 (LIC-92-207R)
Gentlemen:
SUBJECT:
Review of Fort Calhoun Station Diesel Gtnerator Ambient Air Temperature Operating Limits (TAC No. 83989)
Duri g discussions of Reference 2, Omaha Public Power District was requested by the NRC to submit additional documentation to facilitate the subject review.
Enclosed are the following documents:
Engineering Calculation FC 05916 - Operating Temperature Limits for DG-1 and DG-2 10 CFR 50.59 Report - Safety Evaluation for Change in DG Coolant Philosophy These documents were previously supplied informally to the NRC Acting Project Manager. Please note that the enclosed Engineerir:g Calculation is a later revision than that previously supplied. Detailed explanations of the revision are contained in the calculation.
If you should have any questions, please contact me.
Sincerely,
/N5 h W. G. Gates Division Manager Nuclear Operations WGG/sel Enclosures (2) c: LeBoeuf, Lamb, Leiby & MacRae (w/o attachments)
J. L. Milhoan, NRC Regional Administrator, Region IV (w/o attachments)
R. P. Mullikin, NRC Senior Resident Inspector (w/o attachments)
S. D. Bloom, NRC Acting Project Manager (with attachments) 00 17012g 9 9208190169 920814 Y$hF e PDR ADOCK 05000285 P PDR