ML20099D051

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Seismic Analysis of Auxiliary Control Bldg.Initially Reported on 820226.Rev to Original Seismic Analysis Completed,Design Meetings Held to Discuss New Analysis & Const Mods Completed
ML20099D051
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 10/24/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8411200168
Download: ML20099D051 (2)


Text

'

'l

~

4

.4 4-L* /

7 TENNESSEE VALLEY AUTHORITY

= CHATTANOOGA. TENNESSEC 374ol.

400 Chestnut Street Tower II 8(DCT 29 P.l l t g Octo>er 24, 1984 BLRD-50-438/82-21 BLRD-50-439/82-19 U.S. Nuclear Regulatory Commission Region II Attn: - Mr. James P. O'Reilly,' Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Gergia 30323

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SEISMIC ANALYSIS OF THE AUXILIARY-CONTROL BUILDING - BLRD-50-438/82-21, BLRD-50-439/82 FINAL' REPORT The subject deficiency was initially repeted -to NRC-0IE Inspector Ross Butcher on February 26, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN CEB 8201. This was followed by. our interim reports dated March 26, July 22, September 20, and December '22,1982 and June 15, 1983 and June '14,.1984. Enclosed is our final report. Please note that a several day delay of this submittal was discussed with Inspector S. Weise on October 19, 1984.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY T) S

~

lps.L.M. Mills, Manager i

i Nuclear Licensing

}

Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 MICIAL COPY r

~

f"411200168 841024 f"

i

{DRADOCK05000 An Equal Opportunity Employer j

o-Y

\\. ;

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2

' SEISMIC ANALYSIS OF THE AUXILIARY-CONTROL BUILDING

-NCR BLN.CEB 8201-BLRD-50-438/82-21, BLRD-50-439/82-19 10 CFR 50.55(e)

FINAL REPORT Description of Deficiency The original seismic analysis of the Bellefonte Nuclear Plant.(BLN)

Auxiliary-Control Building was performed.in 1973 and was based on issued concrete general' outline feature drawings that were not intended for use by' the Division of Construction (CONST). Subsequently, outline drawings for use by CONST were issued and, in portions of the building, significant changes in the structural configuration were made. However, the seismic

-analysis personnel were unaware of the changes made by the later drawings.

While assessing the potential changes in the original seismic analysis, that the location of. the postaccident sampling facility in this structure would mrAs, the discrepancy' between the original and later outline drawings was notui. Preliminary investigations indicate potential significant changes in the structural responses.- Consequently,. the results of the present seismic analysis do not adequately reflect those of the current geometry. A revised seismic analysis is mquired.

The cause of the deficiency was a failure to coordinate design changes with appropriate organizations in accordance with the Office of Engineering (OE) j Engineering Procedure EP 4.01.

e

]

Safety Implications Because the dianges to the structural configuration of the Auxiliary Control Building increased torsional loading and significantly changed the response spectra, this situation if left uncorrected could have subjected safety-related piping and equipment located above elevation 686 feet to seismically induced loads which could have exceeded design considerations. These

{

unexpected loads could then have damaged the piping and/or equipment and could have adversely affected safe plant operation.

i Corrective Action A revision to the original seismic analysis has been completed. Design review meetings with all affected organizations have been held to formally l

discuss this new analysis and required design. Construction modifications

(

have been completed, as has an evaluation of all other BLN category I struc tures. The modifications mquired by this analysis were the addition of two walls from elevation 686 feet to elevation 704.5 feet, and these l

modifications were performed through engineering change notice (ECN) 1561.

l The evaluation of the other category I st;

ures indicates that the as-built configuration of these structures is consistent with the configuration used in the seismic analysis.

To prevent a recurrence of this problem, OE-EP 3.02 has been revised to supplement EP 4.01 and to assure that all drawings affecting the seismic analysis of category I structures are coordinated with seismic analysis personnel when changes are made to the drawings.