Interim Deficiency Rept 84-13 Re Electrical Butt Splices Not Installed in Accordance W/Manufacturer Recommendations. Initially Reported on 840905.Program Developed to Ensure Splices Inspected.Next Rept Will Be Submitted by 850215
ML20099D028
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/01/1984
From: Danni Smith
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
84-13, 9407N, NUDOCS 8411200158
Download: ML20099D028 (2)


Text

,_.

'birld

/

"N Commonwealth Edison s,

/

/ One First Nationti Plari, Chic go, llhnois i

7

] Addr:ss R; ply to: Post Offica Box 767

(

/ Chicago, Illinois 60690 November 1, 1984 Mr. James G. Keppler Regional Administrator U. 5. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

SUBJECT:

Braidwood Station Units 1 and 2 10 CFR 50.55(e) No. 84-13 Interim Report Electrical Butt Splices NRC Docket Nos. 50-456/457 References (a):

E. D.

Swartz letter to J.

G. Xeppler dated September 5, 1984.

Dear Mr. Keppler:

Reference (a) provided the initial written report of a potential deficiency reportable pursuant to 10 CFR 50.55(e) regarding electrical butt splices not installe' in accordance with the manufacturer's recommendations at our Braidwood Station.

The purpose of this letter is to provide an updated status of the corrective actions taken to resolve this issue.

STATUS OF RESOLUTION Commonwealth Edison Company NCR-598 has been issued to track issue resolution.

L. K. Comstock procedures have been revised and approved to ensure that future work is correctly installed and adequately checked.

Specifically, Procedure 4.3.9 (Rev. D), Cable Termination Installation, was approved by Sargent and Lundy on July 16, 1984.

Procedure 4.8.9 (Rev. E), Electrical Termination Inspection, was approved by Sargent and Lundy on September 6, 1984.

A program has been developed as' a supplement to the disposition of NCR-598 to ensure that all potentially deficient safety related butt splices are identified and inspected.

Deficient splices will be repaired and reinspected in accordance with the revised installation and Inspection procedures.

This program also provides for adequate documentatici of corrective action activities Training sessions will be conducted for personnel involved in the implementation of the NCR disposition supplement.

It is currently anticipated that training will be completed by November 20, 1984, at which time reinspections will be initiated.

A corrective action completion date of January 31, 1985, is still pro jected.

A supplemental or final: report will be submitted by February 15, 1985.

'8M 1200158 841101 5'

~

N5 M3 PDR ADOCK 05000456?

f 5 -

PDR L 3GJ7

~

,.. Please address any questions that you or your _ staff: may have concerning this matter to this office.

.truly you s,

i 1

g

, (ith VALs David H.

Sm Nuclear Licensing. Administrator cc:

NRC Resident Inspector - Braidwood Director of Inspection and Enforcement -

U.S. Nuclear Regulatory Commission Washington, D.C. 20555-t'a 9407N i