Forwards Rev 2 to Vols 1-19 of Updated FSAR for Limerick Generating Station Units 1 & 2,reflecting Changes Made Up to at Least 920101,including Changes to QA Program Description
ML20099C103
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/30/1992
From: Helwig D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20099C105 List:
References
NUDOCS 9208030309
Download: ML20099C103 (12)


Text

_ _ -

10CFR50. 71(c) (4 )

W 10CFR50. 54 (a) (3 )

h A

1 l'

PIIILADELPIIIA ELECTRIC COMPANY V

NUCLEAR GROUP HEAPQUARTERS 955 65 CHESTERBROOK BIND.

WAYNE, PA 19087-5691 (215) 640-6650 June 30, 1992 DAVID R. HELW10

- VICE IMESIDEh7 Docket Nas. 50-352 50-353 License Nos NPF-39 NPF-85

-U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555 e

SUBJECT:

Limerick-Generating Station, Units 1 and 2 Submittal.of Revision-2 of the Updated Final Safety Analysis Report

Dear Sirs:

In accordance with 10CFR50.71(e) '4) and 10CFR50.4 (b) (60), this y

letter 7 submits one - original and ten (10) copies of Revision 2 of the Updated - _ Final Safety Analysis Report. (UFSAR) for Limerick Generating Station (LGS), Units.1 and.2..'The enclosed copies of l Revision 2 are-being : provided-to-the NRC on a replacement page

- basis with : a. list. : of effective pages identifying the latest revision-.date

-of all current-pages in accordance-with p q~ q

'10CFR50.71(e) (1)...In each revision package, we.have also provided n

page replacement instructions _ for incorporating-Revision 2 into the

NRC copies' of the LGS.UFSAR.

As required by 10CFR50.71(e) (5), each

' replacement - 7page - includes

'a bold vertical line in the margin ladjacent to o ich area changed und the r'. ate of chal.ge is included on each page.

iiavision-2 reflects chang _ a made up.to a maximum of six months lpri::e.to this submittal.in accordance with the requirements

of 10CFRGO.71(e) (4).

'As'a result, the-UPSAR Revision 2, has been

.made to reflect changes ' made to - LGS, ' Units 1 and 2,

under the

. provision of-10CFR50'.59,.at-least up to January 1, 1992.

.The enclosed UFSAR Revision 2 also contains the annual revision of the Quality Assurance (QA)' Program Description-which is being submitted in accordance.with 10CFR50.54 (a) (3).

The revised QA Program Description (i.e., Section 17.2 of the UFSAR Revision 2) reflects editorial and organizational changes and those changes

~ described in - Attachment - 1 as required by 10CFR50.54 (a) (3) (ii).

92000gj $ h h 52 9

h pR.

PDR w

a

~

h U.S. Nuclear-Regulatory Commission

' June 30,'1992

' Document Tontrol Desk Page 2 Based - on the informat. ion provided in Attachment 1,

we-have concluded that the QA~ Program Description changes included in Revision 2 of-. the UFSAR do not reduce the commitments in the QA.

2 Program Description previously accepted by-the NRC.

As required by 10CFR50.71(e) (2) (1), I certify that to the best of my knowledge,- Revision 2 of the UFSAR accurately reflects information and analyses submitted to.the NRC, or prepared pursuant

to NRC requirements as-described above.

In addition, as required by 10CFR50.71(c) (2) (ii), Attach 1ent 2 to this letter identifies

.cnnges made under the provision of 10CFR50.59 and included in the enclosed-Revision 2, but not previously submitted to the NRC.

If you have any questions or require further information, please_ contact us.

Very truly yours, q

s

(.-~

Attachments Enclosures

-cc:

T. T. Martin,_ Administrator, Region I, USNRC w/atts/2 copies of enclosures T.

J.

Keltny, USNRC_ Senior Resident Inspector, LGS w/atts/1 copy of encl p

t-t I:

)

PHILADELPHIA ELECTRIC COMPANY LGS QUALITY ASSURANCE (QA) PROGRAM DESCRIPTION' CHANGES LGS UFSAR REVISION 2 (Program Description Revision 10)

Page 1 of 8 PARAGRAPH CLASSIFICATION NUMBER DESCRIPTION OF CHANGES OF CHANGES 17.2.1 Changed "five" Senior Vice Organizational Presidents to "six."

17.2.1.1 Changed " Engineering and Organizational Production" to " Production."

17.2.1.2 Added " Nuclear" to " Quality Commonality

  • Assurance Program."

17.2.1.2.3 Changed Performance Assess-Organizational ment " Division" to "Section."

17.2.1.2.3 e Deleted " deficiencies" Clarification Added MCARS.

Added " Require that deviations be tracked in accordance with Administrative Procedures."

.17.2.1.2.3 Changei "QA/QC" to "QA/QV."

Clarification

- g,- k, 1 17.2.1.2.3 p Deleted " Administration of Organizational internal audits and sur-veillances." Added " Assess through NQA atlits, surveil-lances,... covered by the NQA Program."

17.2.1.2.3 q Deleted.

-Organizational 17.2.1.2.3.1

' Changed format of paragraph.

Commonality *.

Changed'" Quality control" Organizational to " Quality Verification."

'17'2.1.2.3.1=d Added " site" before " Audit Clarification Program."

17.2.1.2.3.1 h

.'Added " Facility" before Clarification

" Quality Assurance Program."

(M r

' PHILADELPHIA ELECTRIC COMPANY

-LGS QUALITY! ASSURANCE. (QA) PROGRAM DESCRIPTION CHANGES LGS UFSAR REVISION 2 (Program Description Revision 10)

Page 2 of 8 PARAGRAPH CLASSIFICATION-

-NUMBER QESCRIPTION OF CHANGES OF CHANGEE 17.2.1.2.3.1'i Changed " requests" to Editorial

" directives."

17.2.1.2.3.1.1 Added " site Quality Clarification Division" before " Manager."

17.2.1.2.3.1.1 b Former Item h was added to b; added " scheduling and Editorial planning,"

added "and Technical Commonality

  • Specifications."

17.2.1.2.3.1.1 d Added " site Quality Commonality

  • Division."

Deleted " Limerick Quality."

17.2.1.2.3.1.1 f Rearranged sentences Editorial (formerly.itemJl)~

(former Items f and g were deleted); the meaning was not clear.

17.2.1.2.3.1.1 g Added "and certified."

Clarification (formerly Item:j) 17.2.1.2.3.1.1 i Deleted "Through future Editorial /

i (formerly~ Item 1) audits and surveillances."

Commonality

  • 17.3.1.2.3.1.2 Changed " Quality Control" Organizational to " Quality Verification" l

and "QC" to "QV" throughout L

the section.-

L Added " site Quality Editorial /

. Division," and deleted Commonality *

" Limerick Quality."

l 17.2.1.2.3.1.2 b

Deleted "etc.,

as Editorial appropriate."

.17.2.1.2.3.1.2 c Added " site Quality Editorial /

Division," deleted Commonality *

" Limerick Quality."

p l=

7 PHILADELPHIA ELECTRIC COMPANY LGS QUALITY ASSURANCE (QA) PROGRAM DESCRIPTION CHANGES LGS UFSAR REVISION 2 (Program Description Revision 10)

Page 3 of 8 PARAGRAPH.

CLASSIFICATION NUMBER DESCRIPTION OF CHANGES OF CHANGES 17.2.1.2.3.1.2 e Added " procedure" before Clarification

" supplements."

17.2.1.2.3.1.2 f Added "and certified to Commonality

  • perform assigned activities."

17.2.1.2.3.1.2 g Replaced with new Item g.

Clarification 17.2.1.2.'3.1.2 h Deleted " perform," added Clarification

" requirements and QV."

17.2.1.2.3.1.2 j, Added new items.

Organizational k, 1 17.2.1.2.3.1.3 Deleted "directly" Editorial /

added " site Quality Commonality

  • Division," deleted

" Limerick Quality."

17.2.1.2.3.1.3 b Added " site Quality Commonality

  • Division," deleted Limerick Quality."

l -

17.2.1.2.3.1.3 d Deleted-item, renumbered Administrative i

succeeding items.

- 17.2.1.2.3.1.3 e Deleted'" site," added Commonality *

(formerly Item f)

" station Administrative Procedures and."

17.2.1.2.3.1.3 f Changed " purchase orders" Commonality

  • L

- (formerly Item g).

to " procurement documents."

p 17.2.1.2.3.1.3 g Deleted " dispositions,"

Commonality /*

(formerly Item h) added "for conditions' Clarification o

b adverse-to quality."

17.2.1.2.3.1.3 h Added " tracking...and Clarification (formerly Item i)

CARS."

l V

PHILADELPHIA ELECTRIC COMPANY LGS QUALITV ASSURANCE (QA) PROGRAM DESCRIPTION CHANGES LGS UFSAR REVISION 2 (Program Description Revision 10)

Page 4 of 8 PARAGRAPH CLASSIFICATION NUMBER DESCRIPTION OF CHANGES OF CHANGES

(

17.2.1.2.3.1.3 i Deleted " Issue CARS and Clarification 3

(formerly Item j) verify corrective action for."

Added " Document."

z 17.2.1.2.3.1.3 j, Deleted previous Item k.

Administrative and k (formerly Deleted previous Item 1 Administrative n ant o)

(added to g and h).

Clarification Deleted previous Iter m.

Organizational /

k Administrative 17.2.1.2.3.1.4 Added " site Quality Commonality

  • Division," deleted

" Limerick Quality."

17.2.1.2.3.1.4 a Deleted " activities of Editorial the."

t 17.2.1.2.3.1.4 b Changed "such" to "the."

Commonali'y*/

Clarification 17.2.1.2.3.1.4 c Added new item.

Commonality

  • 17.2.1.2.3.1.4 d Deleted " issue," added Clarification

" development, approval, and issuance of."

17.2.1.2.3.1.4 e Deleted "overall planning,"

Clarification added "and approval."

17.2.1.2.3.1.4 h No change to text.

Editorial (formerly Item c) 17.2.1.2.3.3 Changed " division" to Organizational "Section" and " Manager" to " Superintendent" several places.

17.2.1.2.3.4 Changed format.

Commonality

  • Changed " Audit (section)"

Organizational to " Vendor Evaluation."

Changed "NDE Services" to Organizational "NDE Support."

l

_A

r~

q PHILADELPHIA' ELECTRIC COMPANY LGS QUALITY ASSURANCE (QA) PROGRAM DESCRIPTION CHANGES LGS UFSAR REVISION 2 (Program Description Revision 10)

Page 5 of 8 PARAGRAPH-CLASSIFICATION NUMBER 0ESCRIPTION OF CHANGES OF CHbMGES 17.2.1.2.3.4.1 Changed format.

Commonality

  • Deleted " Technical Organizational direction for the Nuclear Fuel QA Program" (added to 17.2.1.2.3.4.2).

117.2.1.2.3.4.2 Changed " Audit" to " Vendor Jt.tanizational Evaluation" (two places).

Changed format.

Commonality

  • Deleted " supervision for selected services audits, security screening audit <s, vendor audits and survella lances."

Added "a.

.Providing admini-Organit:1tional/

strative direction for the Clarification performance of vendor eval-uation activities including audits,_ surveillance, and commercial grade surveys."

Added "b.

Directing the per-Organizational /

formance of contractor se-Clarification curity screening audits and special services audits."

Added "d. _ Technical direc-Organizational tion for the Nuclear Fuel QA Program."

17.2.1.2.3.4.3 Changed " services" to Organizational

" support"-_(two places).

Changed format.

Commonality

  • Deleted responsibility for Organizational the performance of NDE (See 17.2.1.2.3.1.2).

Added Items a through h.

(

l l

7.

' PHILADELPHIA ELECTRIC COMPANY LGS QUALITY ASSURANCE (QA) PROGRAM DESCRIPTION. CHANGES LGS UFSAR REVISION 2 i

(Program Description Revision 10)

Page 6 of 8 PARAGRAPH CLASSIFICATION NUMBER DESCRIPTION OF CHANGES OF CHANGES 17.2.1.2.3.4.4 Changed format.

Commonality

  • Deleted " Administrative Administrative

-supervision and technical direction to the QA assistants and clerical staff."

Added "and-analysis of trend information "(Item b).

Added "QA Program Description" (Item n).

Clarification 17.2.1.3 Changed " Engineering and Organizational Production" to " Production" (four places).

Deleted " Production Organizational Department."

Deleted " Services Division."

Organizational Deleted " Training Section."

Organizational changed-." Methods Section."

Organizational to " Methods and Training Division."

Changed " Manager Services.

Organizational Division" to "Vice President, rroduction."

Changed " Maintenance Central Organiational Shops" to " Oregon Shop."

17.2.1.4 Changed " General Manager" to Organizational

" Senior Vice President."

17'2.1.4.1 Changed "Vice President" Organizational to " Senior Vice President."

Deleted "The Department is-Clarification; composed of four divisions."

Added "The_only department Clarification organization."

w PHILADELPHIA ELECTRIC COMPANY LGS QUALITY ASSURANCE.(QA) PROGRAM DESCRIPTION CHANGES LGS UFSAR REVISION 2 (Program Description Revision 10)

Page 7 of-8 PARAGRAPH CLASSIFICATION NUMBER.

DESCRIPTION OF CHANGES QF CHANGEE 17.2.2.2 (Third paragraph) Changed Editorial-

" Stores and Purchasing" to " Purchasing."

(Fourth paragraph) Changed Editorial

" construction" to

" modification."

17.2.2.6 (First paragraph) Changed Editorial

"(I & C)" to "(M/I & C)."

'17. 2. 2. 8 -

Deleted "Startup."

Editorial 17.2.2.16

-Changed " Manager" to Organizational.

" Superintendent."

Changed " Division "(PAD)"

to "Section (PAS)."

Organizational 17.2.3.3.1 Changed "are" to "as."

Editorial 17.2.5.10

_(Formerly second paragraph Clarification of 17.2.5.9)

Changed " Manager Limerick Editorial Quality Division" to

" Corporate Nuclear Quality

-Manager."

17.2.9.3 Deleted-"and Engineering Organizational and Production."

- 17. 2. 9. 7-L'anged NDE " Services" to

_ Organizational "5 :pport. "

17.2.12.4 Changed " Testing and Organizational Laboratories" to " Corporate Laboratories."

'17'.2.14.8

-Changed " handbook for Organizational permits and blocking" to " Administrative

~

Procedures."

i

l i: _

PHILADELPHIA ELECTRIC COMPANY-LGS QUALITY ASSURANCE (QA) PROGRAM DESCRIPTION CHANGES LGS UFSAR REVISION 2 (Program Description R3 vision 10)

Page 8 of 8 g

PARAGRAPH CLASSIFICATION NUMBER DESCRIPTION OF CHANGF4 OF CHANGES 17.2.18,6 Added "except as otherwise t'lar".fication indicated."

17.2.6 a Addea " Unit staff is Clarification audited armually."

17.2.18.6 i Changed " Electrical and Organizational Mechanical" to "I & C."

17.~.18.6-I Changed " Stores and Clarification Purchasing" to " Procure-ment."-

17.2.18.6-m Changed format.

Commonal.4ty*

Added "(audited annually)"

Clarification (three places).

App 17.2 I

-Added "N= Nuclear Group" Administrative to the notes.

Changed " Testing and Organizational Laboratories" to " Corporate Laboratories."

. App 17.2 II (Second paragraph) Changed organizational

" Executive" Vice President to " Senior" Vice President.

17.2 II a

-Changed to reference-Clarification Reg Guide 1.33.-

Sections 17. 2.1 through 17.2.1.6.1 have been made identical

.to-the corresponding sections of the Peach Bottom Atomic Power Station UFSAR, Rev 10, dated July,.1992.

Format and content changes for the purpose of commonality are so indicated.

~

Page 1 of 2 Changes made under 10CFR50.59 included in Revision 2 of the Limerick. Generating Station,. Units 1 and'2 Updated Final-Safety.

Analysis ' Peport, but not previously submitted to the NRC, are

. identified below.

Modification-homber Description 0949 Unit 1 and Common - Upgrade of power supplies to the plant telephone and radio systems.

5914 Unit 1 - Addition of a locked open ball valve in the diesel generator starting air line between the air start manifold and the pressure regulator for the lower main bearing lube oil booster.

5993 Unit 1 and Common - Upgrade of radio and communications between the Main Control Room, Remote Shutdown Panel, and Operations Support Center to facilitate communication in the event of a firo or loss of power.

6050 Unit 1 and Common - Relocation of snubber testing equipment, personnel '

anti-contamination clothing storage / issue, Unit 1-and 2

Condensate Ion Chromatography and hot tool storage / issue areas to the Turbine Building and Hot Maintenance Shop areas.

'6054 Unit 1 and Common - Installation of remote monitoring equipment and annunciation in the Main Control Room-for the

' Water

-Processing Facility.

6119 Unit-1 Addition of hydraulic accumulators to the Electro-Hydraulic -Control (EHC) system to increase system hydraulic damping and thereby minimize weld failures.

.6125 Unit'.1 and Common - Installation of

[

the lower.

parking lot for approximately 300 vehicles.

l b

)

Page 2 of 2 Modification Number Description

.6162 Unit 1 and Common - Replacement of air conditioning units in the Counting

Room, Conventional Chemistry Lab, and Warm / Radioactive Chemistry Lab.

9061 Unit 1 and Common Upgrade of Operations Support Center to become the Main Control Room Annex in order to reduce traffic. in the Main Control Room.

9079 Unit 1 and Common - Removal of split plant physical security barriers which are no longer necessary with

.the establishment of full plant physical security.