l CENTERIOR CNERGY DoneM C. SheMon 300 Madison Avenue Vce President Nuclear Toledo, OH 43652K01 Davis Besse (419)249 2300 Docket Number 50-346 License Number NPF-3 Serial Number 2069 July 2C., 1992 United States Nuclear Regulatory Commission Document Control Desk Vashington, DC 20555 Subj ec t : Revision 16 to the Davis-Besse Unit 1 Updated Safety Analysis Report (USAR)
Gentlemen:
The Toledo Edison Company is submitting, pursuant to 10 CFR 50.71, one (1) original plus ten (10) copies of Revision 16 to the USAR for the Davis-Besse Nuclear Power Statien, Unit 1.
Updated Safety Analysis Report Revision 16 reflects facility changes implemented between January 23, 1991 and January 22, 1992, with the exception of USAR Section 9.5.1, Fire Protection Systems.
Updated Safety Analysis keport Revision 15 { Serial 1973), incorporation of the Fire Hazard Analysis Report (FHAR) into USAR Section 9.5.1, was submitted to the NRC on November 1, 1991.
As Section 9.5.1 was updated on November 1, 1991, a separate update of USAR Sec' ion 9.5.1 vill be submi d by November 1, 1992. A sur nary of the major changes made in Revit m 16 can be found in Attachmu.it 1.
This submittal also reports changes to the Davis-Besse Quality Assurance Program in accordance with 10 CFR 50.54(a).
provides a brief summary of the changes made in this revision.
Information contained in Revision 16 te the USAR is accurate to January 22, 1992.
Please insert the Revision material, dated July 1992, into the USAR per the attached Revision 16 Listing of Effective Pages.
9208030295 920720 PER ADOCK 05000346 O<'
K PDR l
l{
Operotng Compames Clewiano Electnc murranoung I0itdo Ed: son
-Docket Number'50-346 License Number-NPF-3 Serial Number 2069-Page-2
-If you have'any_ questions regarding this matter, please contact Mr. Robert V. Schrauder, Manager - Nuclear Licensing, at
_(419) 249-2366.
Very tr
- yours, I
cf
[l ~Q=m
'l JHH/dle cc A. B. Davis, Regional Administrator, NRC. Region III J. B. Hopkins, NRC Senior Project Manager V. Levis, DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board I
r e
e f
r.
_....... ~. - - - -. -. - -... -
l Docket Number 50-346 License Number NPF-3 Serial Number-2069 Enclosure Page 1.
SUBMITTAL OF REVISION 16 TO THE DAVIS-BESSE UPDATED SAFETY ANALYSIS REPORT (USAR)
FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are the-original and 10 copies of Revision 16 to the Davis-Desse Nuclear Power Station, Unit No. 1, Updated Safety Analysis Report.
l'.
n By:
.A/ --
D. C. Shelton, Vice President - Nuclear
~
Svorn and subscribed before me this 20th day of July, 1992.
bObh}
Af Notary Puplic, State of Ohio WELYNL DRESS WWPUSUC. STATE OF OH)O
% hee m423,1994 V
I, l-
Docket Number 30-346.
~
License = Number NPP Serial-Number 2069 Attachment Page~1
SUMMARY
OF USAR REVISION 16 MAJOR CHANGES.
l Section 1-No major changes i
Section 2 Revised the description of the fuel oil storage tanks in Section 2.2.3.6.2, Onsite Facilities, to accurately reflect the configuration of the systems.
i Revised ~the Onsite Meteorological Measurement Program deceription to. reflect the modificatioa which added a i
backup system and upgraded the existing system.
Section 3 Revised several sections to reflect the exclusion of dynamic effects.of a postulated pipe rupture of the Reactor Coolant System and the removal of certain Pressurizer restraints.
Revised Section 3.8.2.1.12, Containment Vessel Relief Valves to reflect the replacement of several obsolete butterfly valves.
Revised several sections to include a discussion of the justification of continued operation for NRC Bulletin 88-11, Pressurizer Surge Line Thermal Stratification.
Revised Section 3.9.2.9.8 and Table 3.9-3 regarding air operated valves to add the Service Water valves that were replaced using.the criteria in Generic Letter 89-09, ASME Section III Component Replacements.
Revised section 3.9.3 to include a description of the
-Gray Axial Power Shaping Rods _that are installed in the Core.
I; Added a paragraph to Section 3.10.2.4, Motor Control Centers, to describe the Vestinghouse Five Star Motor Control Centers.
Clarified Section 3D.3.1 concerning the annulus heating.
Section 4 ~
Revised Section 4.2.1.3 and Table 4.2-1 on Fuel Rods, to include a description of the Dummy Fuel Rods that were installed in Cycle 8.
L Corrected statement in Section 4.3.4.3, Power Haldistributions, concerning ICS asymmetric rod runback.
Corrected value of NI calibration range.
Updated Appendix 4B, Reload Report to reflect Cycle 8.
i i-u
.2m
Docket Number 50-346 License Number NPF-3 Serial Number 206)
Attachment Page 2 Section 5 Revised several sections to include a discussion of the justification of continued operation for NRC Bulletin 88-11, Pressurizer Surge Line Thermal Stratification.
Revised several sections to reflect the exclusion of dynamic effects of a postulated pipe rupture of the Reactor Coolant System and the removal of certain Pressurizer restraints.
Section 6 In Section 6.2.1.3.2, Long-term Containment Analysis, added a discussion of the analysis that was performed regarding the acceptability of the Containment Air Coolers with reduced Service Vater flov.
Clarified Section 6.2.3, Containment Vessel Air Purification and Cleanup Systems, regarding the operation of the Containment Purge fans.
Revised various sections to reflect License Amendment 155, which clarified the testing requirements and updated the regulatory and industry guidance for High Efficiency Particulate Air filters and charcoal adsorber units in Engineered Safety Feature cleanup systems.
Corrected an error in Section 6.2.3, regarding the Containment Vessel pressure under LOCA conditions.
Revised various subsections in Section 6.2 and 6.3 to reflect re-analysis of LOCA maximum linear heat rates for Cycle 7, the addition of zircaloy spacer grids, the re-analysis of long term boron dilution following large LOCA accidents, ar.d License Amendment 149 vhich revised the RCS low pressure trip setpoint.
Added reference in Table 6.2-21, Single Failure Analysis-Containment Vessel Heat Removal Systems, to Service Water valve SV82, to note that it is consistent with licensing basis and that passive failure is not considered credible.
Removed the Makeup Pumps and LPI Crossover piping and valves from Section 6.3.2.11, ECCS Equipment Reliability Considerations, as they were incorrectly listed ac ESF equipment.
Revised Table 6.3-2, ECCS Component Design Conditions, to re-rate the HPI discharge line where it is pressurized due to leakage of Makeup System injection.
Section 7 Deleted Figure 7.2-2, Pressure Temperature Boundaries, and referenced Technical Specifications.
..~. -...-.-.-.
. - _ ~ --
Docket Number 50-346 License Number NPF-3 Serial Number 2069
. Attachment-Page 3 Revised Section 7.3.1.1.3, SFAS Bypasses, to include the-SFAS-Shutdown Bypass that was installed in the Seventh Refueling Outage.
~
Revised section 7.7.1.1, Non-Nuclear Instrumentation Station control Systems, to reflect the= modification which removed the asymmetric rod runback feature from-ICS.
Removed the Automatic Dispatch System and the Load Frequency Control from ICS since these features are not utilized and the cdreuitry is removed.
Revised Section 7.8.1.1, Neutron Detectors, to reflect the calibration of the power range NI channels.
Corrected calibration value of the Ex-Core Neutron Flux detectors.
Added a section to 7.13 Post Accident Mon'toring System, to reflect the Steam Generator Start-up Le'el Indicators
.which vere installed in the Seventh Refueling Outage, Section 8
' Revised Section 8.1.2.1, Main Generator System, to reflect the modification which improved tha Main
. Generator sequential-tripping-circuit baseu on a General
_ Electric: Company Technical-Information Letter.
Revised Section 8.3.1.1.4,LEmergency Diesel Generators, to reflect the modification whi-S installed synchronism check relays to prevent. manual closing of the emergency
_ diesel generator output breakers.
Corrected.Section~ 8.3.1.1.5, 480V AC Auxiliary System,'to reflect'the elimination of one of two outdoor distribution centers.
the modification Revised Section 8.3.1.1.6, to reflect that_ replaced _two of the-four'cyberex inverters in the 120V-AC system.
Revised various subsections _.in.Section 8.3.1.2 to reflect i
the modification which added backup fault protection-to 21 power circuits which pass through an Electrical:
Penetration Assembly.
-Section 9_
In Section 9.0,- Auxiliary Systems, under the codes.and g
standards used, added reference to_the Service Water valves that vere replaced using_the criteria in Genetic-Letter 89-09, ASME Section III Component Replacements,
.a.
Docket Number 50-346-LLicense Number NPF-3 Serial Number 2069 Attachment Page-4'
.In Section 9.1.3.11, Loss.of Vater from the Fuel Pool, added the evaluation of the capabilities of the siphon
)
breaker to prevent vater lass from the Spent Fuel Pool (SFP) in the event of a postulated pipe break in the-I seismic class 11 portion of the SFP cooling and cleanup
.l system piping.
1 In Section 9.2.1, Service Vater, added reference to the modification which installed flow clements in the Service Water. System to enhance system balancing and pump testing.
Corrected SFAS level at which Component Cooling Vater-valves vill be isolated.
Added note to Table 9.2-1, Service V-e System Design Parameters for. Major Equipment, to re;. 2nce the analysis that was performed regarding the acceptability of the Containment Air Coolers with reduced Service Water flov.
Added reference in Table 9.2-3, Single Failure Analysis Service Vater Systems, and Table 9.4-6, Single Failure Analysis - ECCS Room Cooling Units, to Service Vater valve SVS2, to note that it is consistent with licensing
-basis and that passive failure is not considered credible.
.In Section 9.3.3.1, Station Drainage and Discharge System, added a discussion of the Vet Vash Facility which was installed during the Seventh Refueling Outage.
Revised Section 9.3.4, Makeup and Purification System, to reflect change that allowed Purification Demineralizer 1-3 to function as either a cation or mixed-bed demineralizer.
Revised Section 9.3.5, Decay Heat Removal System, to address alarm setpoints during shutdown, lov RCS level conditions.
Revised Table 9.3-8, Makeup and Purification System Component Data to reflect new filter tatings for the Source Term Reduction Program.
In Section 9.4, Air Conditioning, Heating, Cooling and Ventilation Systems, deleted reference to Control Room Chlorine Detectors which were abandoned in-place.
-Revised Section 9.4 to reflect License Amendment 155, which clarified the testing requirements and updated the regulatory and industry guidance for High Efficiency Particulate Air fil*.ers and charcoal adsorber units in Engineered' Safety Feature cleanup systems.
___.,_m
- Docket Number 50-346-License Number NPF-3
- Serial Number 2069-
Attachment:
Page-5 Revised Section 9.4.2.1.2.2, Lov Voltage Svitchgear Rooms, to reflect means by-which vinter heating is -
-accomplished in the room.
Deleted Section 9.5.2.2.4, Control Room Intercom,-as_lt-is no longer-installed.
P b
-Section 10 No major changes.
Section 11
-Added. reference to the Vet Vash Facility throughout Section 11.
Revised Section 11.2.2.3.2, Demineralizers, to reflect the change in Purification Demineralizer 1-3 vhich allowed'it to be either a cation or mixed-bed demineralizer.
Revised Table 11.2-1, clean Liquid Radioactive Water System Equipment List, to reflect new filter ratings for.
the Source _ Term Red ion Prograno Revised Table 11.4-1, Liquid, Gas'and Airborne Radiation Monitors, to-reflect the new values reported.in the revised Victoreen calibration repoct.
Section 12 Throughout Section 12, the title of Radiological Control
.vas_ changed to Radiation Protection. This_ change was made to be consistent!vith the terminology used in the draft standard of ANSI /ANS-3.1, January 1991.
Revised Section 12.2,_ Ventilation, to reflect License Amendment 155, which clarified the testing requirements and_ updated the regulatory and; industry guidance for High Efficiency Particulate: Air filters and charce.1 adsorber units in Engineered Safety Feature cleanup systems.
Revised Section 12.3.2.2.2, Counting Equipment for Radioactivity Heasurements,'to reflect the new gamma spectroscopy system.
(l; Clarified Section 12.3.3, Personnel Dosimetry, regarding l
the methods used to administratively contrtl dose levels.
Section 13-Revised Section 13.1, Organizational Structure, to L
reflect Centerior Management reorganization.
11n Section. 13.1.2.6.3, Radiological Controls Section, the title of Radiological Control was changed to Radiation Protection.
This change was made to be' consistent with the terminology used in the draft standard of ANSI /ANS l-3.1, January 1991. There were also changes in reporting assignments.
L i
t.
,., _ --- ~
.,....-c.,,.,._-,--,-,,4r..
,m,,
,.------.--m---
Docket Number 50-346 License Number NPF-3 Serial Number 2069 Attachment Page 6 Revised Section 13.2, Training Program, to reflect procedure title changes.
Revised the Subsections under Section 13.6.1.1, Daily Logs, to reflect the change that eliminated the Reactor Operator Log and moved the logging requirements into the Unit Log.
The STA Log was also eliminated as Operation's personnel no longer perform the activities involving transient assessment and industry event reviev.
Revised Section 13.7, Industrial Security, to eliminate visitor and vehicle control on the owner Controlled Area.
Federal requirements for visitors and vehicles are
~
limited to the Protected Area.
Section 15 Throughout Section 15 accident analysis, notes vere added noting that additional analysis were performed with a moderator temperature coefficient more negative than the previous limit.
Section 15.4.4, Steam Line Break, was re-written to include information from the FSAR Questions and Ansvers not previously incorporated, to restructure the subsections to make the section flow better and to incorporate License Amendment 149 vhich lowered the RPS RCS low pressure trip setpoint.
A subsection was added to Section 15.4.5, Break in Instrument Lines or Lines from Primary System that Penetrate Containment, to include License Amendment 149 vhich lovered the RPS RCS low pressure trip setpoint, r*
Added a subsection to Section 15.4.6, Major Rupture of Pipes Containing Reactor Coolant Up To and Including Dot ble-Ended Rupture of the Largest Pipe in the Reactor Coolant System, to include License Amendment 160 which increased the allowed secondary containment bypass leakage rate.
-. _ _. _ ~ _ _ _. _. -__ _ __
i
. Docket Number: 50-346 -
License Number NPF-3
- Serial Number 2069-
- Page 1-CHANGES TO QUALITY ASSURANCS PROGRAM
?
Section-17 Section 17.2.1.3 was revised to reflect _a reorganization of corporate management.
Centerior-Energy's Chairman and Chief Executive Officer, R. A. Miller retired and was repleced by R. J. Parling, formerly President and Chief Operating Officer-The position of President und Chief Operating Officer as comb!ned with Mr. Hiller's position of Chairman rnd Chief Executive Officer.
Mr. Farling's new position title is Chairman, President and Chief Executive Officer.
Along with tnis change, the Centerior Energy Board of. Directors also created a tr; position of Senior Vice President - Legal. Huaan and Corporate Affair'. This new position vill have the Vice President _- Legal and General Counsel, Vice President - Luman Resources and Strategic Planning, Director-- Governmental Affairs and the Director - Public Affairs reporting to it.
These organizational changes do not alter or negate Tsledo Edison's commitment to-provide and describe the organizations responsible for establishment and' implementation of the Nuclear Quality.
Assurance Program.
In Section 17.2.1.4, Toledo Edison Nuclear Group, the title of Hanager - Radiological Control was chr'ged to Manager ~- Radiation Protection.
This change was made to be consistent vith the terminology used in the draft standard of ANSI /ANS 3.1 January 1991. The functional 3
- responsibilities still remain such'that the necessary level of quality objectives continue to be attained and to assure satisf actinr. of Toleds Edison's commitments.
Section 17.2.1.4 vas changed to clarify the
, responsibilities of Performance Engineering. -The examples of document types reviewed by Performance
- Engineering in support of improved performance and reliability and special engineering-projects _ vere -
. deleted.
A clarification was also made to. state that Performance Engineering reviews all external information thatLis received. The responsibility for the Hanager. Performance Engineering to review all external information in support of the improved performance and reliabilityLand special engineering projects was established as a result of a related docketed commitment.
The commitment was to provide measures for the tracking; of' transient assessments'and transient assessment' program reports received for review and evaluation.
Since the
- USAR update did not specifically identify the " review of information received",
additional clarification is being
-added to the OA Program description to be consistent with QA commitments existing in docketed correspondence.
. Deletion of the examples of-document types reviewed is needed to avoid further USAR updates when specific document types become obsolete or nonexistent.
F y
y
-a-
.-.-,w eg..
a...
u
<-n a
-~
. Docket Number!501 46-3 License Number NPF-3 Seria Number 2069-
~
- Page 2 Section 17.2.4.3, Procurement Document Revieu vas revised to: replace the Engineering Assurance in-line quality review of-procurement do'cuments with an additional and separate procurement engineering technical and quality review.
This change was submitted to the NRC in Serial 1604, dated October 21,- 1988 and approved by the NRC on June 18, 1991.
In Section 17-.2.5.2, Review and Approval, replaces the biennial review of plant procedures with programmatic c,ntrols and yearly surveillanne. This change'vas submitted.to the NRC in Serial letters 1-957 and 1-962, dated July 31, 1991 and September 9, 1991 respectively, and approved by-the-NRC_on September 18, 1991.
Section 17.2.7.3 was revised to clarify the requirements for acceptance and unconditional release of items for use in quality related applications. The previous wording in this section stated that an item is considered.as non-acceptable until. sufficient quality _ documentation has been provided and that unacceptable materials or items discovered during the receipt-inspection process are documented and processed as non-conforming material.
It was never the intent to document material as non-conforming for documentation that is forthcoming or in the process of being evaluated. 'The current receipt
-inspection process specifies that material cannot be unconditionally released for use unti all aspects of the inspection have been satisfactorily. completed, including review of= documentation' The procedure is to identify any non-conformances at ~ the completion of the receipt
_ inspection process. While the specified combination of required inspections are proceeding, material is maintained in a hold status. The USAR has been revised to more clearly reflect the' existing intent'for the conduct of receipt inspection _ including documentation and processing'of non-conforming items.
Table 17.2-1, Item 2.C was revised to delete the use of the General Material Inspection Checklist (GHIC) as the document _that specified special storage or handling requirements for equipment. The Data Assignment Sheet (DAS) vill be used in_ place of the GMIC.
Reference to-
-the GUIC vas deleted in the USAR and the phrase "in procurement documents" vas substituted. This. change is consistent with the requirements of 10 CFR 50 Appendix B
'to establish measures to assure that applicable regulatory requirements, design bases and other requirements which are necessary to assure adequate quality are suitably included or referenced in the documents for procurement of material, and equipment, and to establish measures to assure that purchased material and equipment conform to procurement requiremt,ts.
m.
n---
,.,,,m e
.r~
e
,-,e,,,v
--,v-,-m n----
e
Docket Number 50-346 License' Number NFF-3 Serial Number 2069 Page 3 Table 17.2-1, Item 4 vas revised to include an exception to ANSI /ANS 3.2-1982, Section 5.2.1.6, regarding facility staff overtime.
In previous revisions to this Table, Davis-Besse committed to the proposed Revision 3 of Fegulatcry Guide 1.33-July 1981.
The propostd Reg Guide did not endorse the vork time limitations provided in ANSI /ANS 3.2-1982, but the NRC endorsed Davis-Besse Technical Specifications which provide requirements for facility staff overtime limitations.
In a subsequent revision to the USAR the commitment to the proposed Revision 3 to Reg Guide 1.33-7/81 vas deleted becav;e of non-endorsement of the proposed Reg Guide by the EdC.
At that time USAR Table 17.2-1, Item 4 should have been clarified to reflect exception to ANSI /ANS 3.2-1982 as accepted in the Davis-Besse Technical Specifications.
In Table 17.2-1, Item 16, corrected date of Regulatory Guide 1.123 Revision 1.
Table 17.2-1, Item 16.2.A was revised to delete the "0" in the phrase " commercial grade" "0".
This action was committed to in Serial 1986 (October 7, 1991) as a response to NRC's request to clarify the phrase
" Commercial Grade""Q", (Log 1-2537).
Commercial grade items are not "0",
but are rather dedicated for use in "0" applications in accordance with the established requirements of USAR 17.2.4.1.