Forwards Application for Amend to License DPR-59,changing Tech Specs to Allow Main Steam Line High Radiation Monitor Trip Level Setpoint to Be Raised During Proposed Hydrogen Addition Test.Fee Paid
ML20098G714
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/02/1984
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20098G715 List:
References
JPN-84-62, NUDOCS 8410050380
Download: ML20098G714 (2)


Text

e 123 Main street.

White Plains, New York 10 rat 914 681.6203

  1. > NewWrkPower 4# Authority October 2, 1984 JPN-84-62 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Domenic B. Vassallo, Chief Operating.eactors Branch No. 2 Division of Licensing

SUBJECT:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specifications Pacarding Main Steam Line High Radiation Monitor Trip Levc3 Cetpoint

Dear Sir:

Enclosed for filing are three (3) signed originals and nineteen (19) copies of a document titled, " Application for Amendment to Operating License", together with forty (40) copies of Attachment I and II thereto, comprising a statement of the proposed change to the Technical specifications and the associated Safety Evaluation.

The change proposed in the attached application would allow the main steam.line high radiation monitor trip level setpoint to be raised during a proposed hydrogen addition test.

The purpose of this test is to study the feasibility of hydrogen addition to the coolant water to inhibit intergranular stress corrosion cracking (IGSCC) at the James A. FitzPatrick Plant.

The addition of hydrogen reduces the concentration of oxygen in the coolant water and increases the N-16 carryover in the steam.

This would result in a higher background radiation level seen by the main steam line radiation monitor.

The Authority notes that a similar test was conducted at the Dresden 2 nuclear power plant in May 1982 and the main steam line radiation monitor trip setpoint was changed for the test.

That change was raviewed and approved by the NRC.

f1dO 8410050300 841002

\\

i PDR ADOCK 0D000333

\\ \\

P PDR I\\

~

uWNINsci Y

f@

s.

The-proposed change to the Technical Specifications needed to support this test are contained in Attachment I to this letter.

The Authority plans to run this test starting

-December 1, 1984 and would like to request an expeditious review of this application.

In accordance with 10 CFR 50.91, a copy of this application,

-with attachments, is being provided to the designated New fork State official.

L n accordance with 10~CFR 170.12, a check in the amount of I

$150.00 is enclosed as the application fee.

The Authority pays this_ fee under-protest pending a final determination of the legality of the fee schedule, i

Very truly yours,.

J. P._Bayne First Executive Vice President Chief Operations Officer ENCS.

cc: Office of the Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 136 Lycoming, New York-13093 Mr. J.D..Dunkleberger Division of Policy Analysis and Planning LNew York State Energy Office Agency Building 2, Empire State Plaza Albany, New York 12223 1

m