w.
O N
4
- s..
l'l KANSAS GAS AND ELECTRIC COMPANY s
THE ELECTnC COMPANY s.-
CLENN L MOESTER VIC E PRE SsOENT - NUCLEAR '
s s
September 28, 1984
-4 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation
.U.S. Nuclear Regulatory Comission Washington, D.C.
20555 KMLNRC 84-173 Re:
Docket No. STN 50-482 Subj: SNUPPS Licensing Submittals
Dear Mr. Denton:
Enclosed is a list of documents that have been submitted to your office by the SNUPPS Staff that are pertinent to the Wolf Creek Generating Station.
These submittals are hereby 3.2co. porated into the Wolf Creek Generating Station.. Unit No,1, Operating License Application.
Your,s!very truly, Y
' j$fb
/
i GLX:bb Attach g
xc: PO'Connor, w/a (2)
HBundy, w/a
[0 8410020204 840928 s\\g'
~PDR ADOCK 05000482 g
A PDR 1-201 N. Market -Yhchita, Karnat - Mail Address: PO. Box 208 I Wichita, Kansas 67201 - Telephone: Area Code (316) 2616451
.. ~
OATH OF AFFIRMATION STATE OF KANSAS
)
) SS:
COUNTY OF SEDGWICK )
I, Glenn L. Koester, of lawful age, being duly sworn upon oath, do depose, state and affirm that I am Vice President - Nuclear of Kansas Gas and Electric Company, Wichita, Kansas, that I have signed the foregoing letter of transmittal, know the contents thereof, and that all statements contained therein are true.
KANSAS GAS AND ELECTRIC COMPANY f
By
,.,ss, Gle'n'n L. Koester Vice President - Nuclear E.D. Prothro, Assistant Secretary
' STATE OF KANSAS
)
) SS:
COUNTY OF SEDGWICK )
BE IT REMEMBERED that on this 28th day of September, 1984
, before me, Evelyn L. Fry, a Notary, personally appeared Glenn L. Koest e, Vice President - Nuclear of Kansas Gas and Electric Company, Wichita, Kansas, who is personally known to me and who executed the foregoing instrument, and he duly acknowledged tia execution of the same for and on behalf of and as the act an3 deed of said corporation.
~ IN WITNESS WHEREOF, I have hereunto set my hand and affixed my seal the date and year above written.
Ih g
f N
L 6
elynj. Fry, Nota
~
_-- y ;-/S ~.,. w.g.
3u fy '*.,3 GgpA ssion expires on August 15, 1985.
k,h..I
l Ji "
c N
Attachment to KMLNRC 84-173
~
- f.
Ll
.~The followlng lists all transmittals from SNUPPS to Mr. Harold R.
Denton which are.to be incorporated in the Wolf Creek Generating Station, Unit No. 1 Operating License Application:
SNUPPS NUMBER: LETTER "SLNRC DATE SUBJECT 79-14 10/02/79 SNUPPS FSAR J
80-34 07/29/80 Masonry Walls
'81-02 01/20/81 Transcript of FSAR Review
,i Meeting 1
81-13 02/27/81 Review of FSAR Chapter 8 81-16 03/20/81 Electrical Instrumentation and Control Drawings 1
81-34 05/26/81 NRC Request for Additional u-Information - Preservice Inspection Program Plan 81-35 05/27/81 Emergency Procedures and
-/
?
Training for Station Blackout Events 81-38 3
06/01/81 Emergency Response t'-
Facilities
- ('
B 81-39 06/03/81 _
^
Auxiliary Feedwater System 81-41 06/04/81 Electrical, Instrumenta-tion and Control Drawings 81-42 06/04/81 Letter Retransmittal
'(SLNRC 81-38)
.u' y
c,,81-44 06/08/81.
Reliability Analysis of the SNUPPS Auxiliary
. j,,.
f Feedwater System a ".,.
e s
9.
81-47 06/19/81 Emergency Response d-Facilities 81-48 06/22/81 Control of Heavy Loads i
81-49 06/22/81 Description of ESP Status Panel l
L L
I i
e e tt
- +
w-r-?
-9 3-ee=
4w,e ev y +
r-g wr er saw e-t.rv.,e,
.,-ye,w y%-e e w -- e mw----o---we, mmv.
r+w we e v e---e e,
ex-w-w,,-e-
---wwce---e.,,wer go v-r<ce,-s-
- w~v-
Pago 2 of 12 SNUPPS NUMBER LETTER BLNRC DATE SUBJECT 81-51 06/26/81 Human Factor Evaluation L
of the SNUPPS Control l
Room 81-54 07/01/81 ICSB Meeting 81-62 08/10/81 Seismic Analysis 81-63 08/10/81 Description of ESP Status Panel 81-65 08/12/81 Human Factor Evaluation of the SNUPPS Control Room 81-66 08/31/81 Improved Load Following Package 81-67 08/14/81 ICSB Positions 61-68 08/14/81 ICSB Review 81-69 08/14/81 NRC Request for Additional Information -
Materials Engineering 81-70 08/20/81 NSSS Setpoint Methodology 81 08/17/81 NRC Request for Additional Information -
Materials Engineering 81-73 08/20/81 Meeting with Power Systems Branch 81-75 08/27/81 Seismic Analysis 81-76 08/31/81 CPB (Reactor Fuel)
Review 81-82 09/01/81 ICSB Review 81-83 09/01/81 RSB Review 81-90 09/05/81 MEB Review 81-92 09/09/81 CPB Review
Page 3 of 12 SNUPPS NUMBER LETTER SLNRC DATE SUBJECT 81-96 09/09/81 RSB Review 81-97 09/11/81 Event V Program 81-98 09/11/81 Turbine Missile Analysis
. 100 09/11/81 PSB Review 81-101 09/14/81 RSB Review 81-103 09/16/81 NRC Request for Infor-mation - Materiala Engineering 81-105 09/17/81 RSB Review 81-108' 09/18/81 SER Open Issues81-109 09/22/81 PSB Review 81-111 09/22/81 ICSB Review 81-113 09/24/81 Revision 7 to SNUPPS FSAR 81-115
- 10/02/81 ICSB Review 81-117 10/02/81 PSB Review 81-120 10/30/81 CPB Review 81-123
.11/16/81 ICSB Review 124 11/17/81 SER Outstanding Issue -
Cable Tray Seismic Analysis81-126
- 11/17/81 Natural Circulation Cooldown 81-127 12/11/81 Pump and Valve Test Program 82-01 01/07/82 SNUPPS ECCS Analysis 82-04 01/19/82 NUREG-0737, Item I.D.1 82-05 01/19/82 Shunt Coils for Reactor Trip Breakers
=
e-y w-+
---,v---e v+-
e--g-ygg-e c
--we,%s+-
e, p
7
,pmy,
- - -e-+--e---,y-
-ye-m---e
-*-%-g
l:.
Page 4.of 12
'SNUPPS NUMBER LETTER SLNRC DATE SUBJECT 82-06.
02/04/82 NRC Request for Infor-
.mation - Seismic Qualification of Equipment
'82-08 02/09/82 Seismic Qualification of Equipment.
82 02/12/82 Safe Shutdown with a Postulated Fire in the Control Room
.82-10 02/23/82 Revision 8 to'SNUPPS FSAR 82-16.
03/16/82 NUREG-0737, Item I.D.1 82-19 04/02/82 Long Term Operability of Deep Draft Pumps 82-20 04/12/82 NUREG-0737, Item I.D.1 82-23 04/29/82 NUREG-0737, Item II.D.1 82-25 05/14/82 Long Term Operability of Deep Draft Pumps
~82-28 05/25/82 Fillet Weld Fequirements 82-30 07/01/82 NUREG-0737, Item Il.D.1 82-33 08/04/82 Control of Heavy Loado 82-40 10/20/82 NUREG-0737, Item II.D.1 82-41 10/18/82 Seismic Analysis 82-46 11/03/82 Fire Protection Review 82-47 12/03/82 Regulatory Guide 1.121, Application for with-holding Proprietary' Information from Public Disclosure 82-49 12/15/82 Revised Submittal of Snubber Technical Specification v..-
Page 5 of 12
~
'SNUPPS NUMBER LETTER SLNRC DATE SUBJECT 82-50 12/22/82 SNUPPS QA Program for Design and Construction f
82-59 12/22/82 Request for Information -
(,
re: SRP Section 7.4, Remote Shutdown Capability 83-02 01/07/83 NUREG-0737, Item II.D.1 83-07 02/04/83 NUREG-0737, Item II.B.3 10 02/23/83 Response to IE Bulletin 82-04 83-15 03/10/83 Environmental Qualifica-tion of Safety Related Equipment 83-22 04/26/83 Containment Recirculation Sump. Testing 83-24 05/09/83 Power System Branch Review 83-25 05/09/83 Fillet Weld Requirements:
83-27 05/13/83 Power System Branch =
Review 83-30 05/27/83 Environmental Qualifica-tion of Safety-Related Equipment 83-35 06/30/S3 SNUPPS Program Plan for the DCRDR 83-36 07/08/83 SNUPPS Technical Specifications 83-42 07/28/83 Environmental Qualifica-tion of Safaty-Related Electrical Equipment 83-45 08/30/83 Alternate Pipe Break Criteria
=
i ~
Page 6 of-12
- c. t SNUPPS NUMBER LETTER
'SLNRC DATE SUBJECT 83-47 08/31/83
'ICSB Review:
Proposed Technical Specification 83-50 09/07/83 SNUPPS Technical Specifications 83-54 10/27/83 Instrumentation and Control Systems Branch Review 83-55 10/27/83 Instrumentation and Control Systems Branch Review
'83-59' 11/17/83 Response to IE Bulletin 83-06 83-61 11/23/83 Environmental Qualifica-tion of Equipment.
83-62 11/28/83 SNUPPS Program Plan for the DCRDR 83-63 11/30/83 NUREG-0737, Item I.D.1 84-03 01/13/84 SPDS Safety. Analysis84-04S 01/16/84 Containment Purge Valve Operability 84-05 01/18/84 NRC' Request for-Infor-mation - re: Preservice Inspection (PSI) Relief Request 84-08 01/27/84 Control of Heavy Loads 84-09 01/27/84 Environmental Qualifica-tion Justification for Ir.terim Operations 84-10 01/31/84 Power System Branch Review p
84-11 01/31/84 Power System Branch Review i
Page 7 of 12 SNUPPS NUMBER LETTER SLNRC DATE SUBJECT 84-13 02/01/84 Environmental Qualifica-tion of Safety-Related Electrical Equipment 84-14 02/01/84 Fire Protection Review
'84-15 02/01/84 SNUPPS License Conditions 84-16 02/02/84 Safe Shutdown Following Loss of Instrument Bus 84-17 02/02/84 Steam Generator Tube Plugging Requirements 84-18 02/02/84 Revision 13 to SNUPPS FSAR 84-19 02/02/84 DCRDR Summary Report 84-21 02/02/84 Environmental Qualifica-tion of Equipment 84-22 02/02/84 Diesel Generator Rocker Arm Lube Oil Temperature 84-23 02/02/84 Seismic Qualification of Equipment 84-24 02/02/84 Power System Branch Review 84-25 02/07/84 Environmental Qualifica-tion of Safety-Related Elcctrical Equipment 84-26 02/07/84 NRC Request for Informa-tion - re; Preservice Inspection (PSI) Relief Request 4
84-27 02/08/84 NRC Request for Informa-tion - re: Preservice Inspection Programs 84-29 02/09/84 SNUPPS Technical Specifications 84-30 02/13/84 NRC Request for Informa-tion - re: PSI l
f
- ~. --..-.. -
~.
Pr;go 8 of 12 SNUPPS NUMBER LETTER SLNRC QATE SUBJECT 84-32 02/14/84 Preservice Inspection Program for RCS Piping Welds 84-54 02/17/84 Reactor Cavity Shielding 84-34 02/23/84 E.Q. Justifications for Interim Operation 84-35 02/23/84 ICSB Branch Review 84-36 02/24/84 Preservice/ Inspection Relief Request - Callaway Plant 84-37 02/24/84 Fire Protection Review 84-38 02/27/84 Slave Relay Testing Technical Specification Requirements 84-39 03/05/84 E.Q. Justifications for Interim Operation 84-40 03/06/84 Justifications for Interim Operation -
Seismic Qualification 84-41 03/14/84 Fire Protection Review 84-42 03/14/84 Revision 14 to SNUPPS FSAR 84-43 03/15/84 Containment Isolation Dependability 84-44 03/16/84 S/G Tube Rupture Event 84-45 03/16/84 Equipment Qualification 84-46 03/20/84 SNUPPS Technical Specifications 84-47 03/21/84 E.Q. of Mechanical Equipment 84-48 03/21/84 NRC Audit of SNUPPS Control Room Design Reviews, Week of 2/27/84
. +...
..m_
Paga 9 of 12 SNUPPS-NUMBER LETTER SLNRC DATE SUBJECT 84-49 03/23/84 Response to IE Bulletin 83-07 84-50 03/23/84 Response to tHIC Questions on Setpoint Methodology for SNUPPS 84-51 03/26/84 PSI Relief Request -
Callaway Plant 84-52 03/27/84 Justification for Interim Operation - Seismic Qualification 84-55 03/28/84 Response to IE Bulletin 83-08 84-56 03/28/84 Control of Heavy Loads 84-58 04/03/84 Justification for Interim Opertaion - Seismic Qualification 84-59 04/06/84 SNUPPS Technical Specifications 84-61 04/09/84 PSI Relief Request -
Callaway 84 04/09/84 Instrument Error for Containment Pressure Setpoints 24-63 04/11/84 E.Q. of Solenoid Valves 84-66 04/13/84 Final Response to NRC Generic Letter No.83-10c 84-68 04/16/84 ICSB Review 84-69 04/17/84 Revision in D/G Start Time 84-70 04/17/84 Boron Precipitation in the BIT and Associated Piping
Page 10 of 12 l
i SNUPPS NUMBER LETTER SLNRC-DATE SUBJECT 84-71 04/23/84 Revision in D/G Start Time 84-72 04/23/84 SNUPPS Tech Spec Use of RHR Suction Relief Valves for Cold Over-pressurization Protection 84-73 04/23/84 ICSB Questions on the SNUPPS Tech Specs 84-74 04/24/84 NUREG-0737, II.B.3 Post-Accident Sampling Capability 84-76 04/26/84 SNUPPS Tech Spec Use of RHR Suction Relief Valves for Cold Over-pressurization Protection 84-77 05/02/84 Revision in Diesel Generator Start Time 84-80 05/14/84 SNUPPS Tech Spec Reactor Systems Branch Issues 84-81 05/15/84 SNUPPS FSAR Chapter 14 Changes Applicable for Callaway 84-82 05/16/84 SNUPPS Tech Specs Reactor Systems Branch Issueu 84-83 05/16/84 Response to NRC Review of SNUPPS FSAR Chapter 14 for Callaway License 84-84 05/18/84 ICSB Tech Spec Questions 84-86 05/24/84 Pump & Valve Operability FSAR Revision 84-87 05/25/84 SNUPES Tech Spec RSB Issues
Pago 11 of 12 SNUPPS NUMBER LETTER SLNRC DATE SUBJECT 64-88 05/31/84 Request for Partial Exemption from Provisions of GDC-4 84-89 05/31/84 SNUPPS Tech Spec Reactor System Branch Issue 84-92 06/13/84 Callaway Preservice Inspection Program Plan 84-93 06/13/84 Callaway PSI Program:
Supplemental Data 84-94 06/21/84 NUREG-0737, II.B.3 Post-Accident Sampling Capability 84-95 06/26/84 Revision 15 to SNUPPS FSAR 84-96 06/26/84 ICSB Tech Spec Questions 84 06/27/84 Callaway Preservice Inspection Program Supplemental Data 84-98 06/28/84 IE Bulletin 84-02:
Failures of GE HPA Relays 84-99 06/29/84 Revision 1 to DCRDR Summary Report for SNUPPS'84-100 06/29/84 Inadequate Core Cooling Instrumentation Testing 84-101' 06/29/84 Equipment -Qualification Justification for Interim Operation (JIO)84-102 07/16/84 Justification for Interim Operation - Seismic Qualification 84-104 7/26/84 Inadequate Core Cooling Instrumentation Testing 84-105 07/27/84 Seismic and Dynamic Qualification l
Pags 12 of 12 SNUPPS.
NUMBER LETTER SLNRC DATE SUBJECT 84-107 08/16/84 Conformance to Reg.
Guide 1.97 84-108 08/10/84 Fire Protection Review 84-109 08/23/84 Fire Protection Review 84-110 08/28/84 Wolf Creek Preservice Inservice Program Plan 84-111-09/06/84 Human Factors Involvement in SNUPPS SPDS Design 84-112 09/06/84 Preservice Inspection Relief Request - Wolf Creek Plant 84-115 09/19/84 Preservice Inspection Relief - Wolf Creek Plant 84-116 09/20/84 IE Bulletin 83-06, Tube Line Corp. and 83-07, Ray Miller, Inc. -
Supplemental Report
.