Interim Deficiency Rept (55(e)-84-29) Re Weld in CRD Support Sys Furnished by Reactor Controls,Inc.Initially Reported on 840726.Investigation Underway.Final Rept Will Be Submitted by 841112
ML20098E861
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/27/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)-84-29), (NMP2L-0144), (NMP2L-144), NUDOCS 8410020039
Download: ML20098E861 (2)


Text

.

v-g

...J e. ;

3' NUMOHAWK Y NIAGARA NIAG ARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 I

l i

August 27, 1984 (NMP2L 0144) l i

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an interim report in accordance with ICCFR50.55(e) for the problem concerning welds in the control rod drive support system. inis problem was reported via telecon to S. Collins of your staff on July 26, 1984 Very truly yours, C. V. Mangan O Vice President Nuclear Engineering & Licensing TL:Ja Enclosure xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 ProjectFile(2)

Ngoggy[oM S

sG-M _

- 6 4 ' -e -

'e

'l l

NIAGARA M0 HAWK' POWER CORPORATION NINE MILE POINT - UNIT 2' DOCKET,NO. 50-410

~

Interim Report for;a Problem Concerning Welds in' CRD Support System (55(e)-84-29)

Description of the Problem The problem concerns welds in the control rod drive support system furnished ~

by Reactor Controls, Incorporated.(RCI). An inspection of 12 randomly

' selected welds indicated that four welds were 7/16 inch.instead of the 1/2 -

inch shown on RCI drawings. The matter is'still under investigation and a final report will be submitted by November 12,.1984.