Clarifies 810105 Response to IE Bulletin 80-21 Re Use of Valve Parts Cast by Malcolm Foundry Co,Inc,Per Insp Rept 50-400/84-19.Handwheels Did Not Require Replacement Since Wheels Mfg by Anchor Darling Valve Co
ML20098E644
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/29/1984
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-21, NLS-84-377, NUDOCS 8410010222
Download: ML20098E644 (1)


Text

--

, j %*,

CD&L h.

Carolina Power & Light Company SERIAL: NLS-84-377 84 Auffl YT 8

g Mr. James P. O'Reilly, Regional Administrato United States Nuclear Regulatory Commission Suite 2900 101 Marietta Street, hV Atlanta, GA 30303 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 UNIT NO. 1 IE BULLETIN 80-21

Dear Mr. O'Reilly:

As = required by Inspection Report No. 50-400/84-19, Carolina Power & Light Company (CP&L) hereby clarifies our January 5,1981 response to IE Bulletin 80-21 for the Shearon Harris Nuclear Power Plant (SHNPP). This response is inc1.uded as Enclosure 1.

The subject of this bulletin is the use of valve parts cast by Malcolm Foundary Company, Incorporated (MFC). The Anchor Darling Valve Company (ADV) is the only affected valve manufacturer for SHNPP. of he January 5,1981 response listed MFC manuf actured valve parts and associated valve tag numbers to be used in safety-related systems at SHNPP.

In compliance with the requirements of IE Bulletin 80-21, the valve yokes associated with Value Numbers 2MS-V8SB-1, 2 and 2MS-V9SA-1, 2 were replaced by the ADV in November 1981. However, thr. handwheels did not require replacement because upon subsequent review, CP&L determined that the handwheels associated with Valve Numbers 2CT-V21SA-1, 2 and 2CT-V43SB-1, 2 were not manuf actured by MFC. Therefore, these handwheels were arroneously included in our previous The balance of the haidw'neels listed in our previous response are response.

associated with passive, safety-related valves. Therefore, since IE Bulletin 80-21~is only concerned with safety-related active valves, replacemeat of these handwheels is not required.

This correspondence serves to complete resolution of the subject item.

If you have any questions please contact Mr. Sherwood Zimmerman at (919) 836-6242.

Yours very truly, 8410010222 840829 gg 05000 0 gDRADOCK A. B. Cutter - Vice President Nuclear Engineering & Licensing GAS /ccc (497 GAS)

Enclosure cc:

Mr. B. C. Buckley (NRC)

Mr. W. P. Kleinsorge (NRC-RII)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. John D. Runkle Mr. Travis Payne (KUDZU)

Dr. Richard D. Wilson Mr. Daniel F. Road (CHANGE /ELP)

Mr. G. O. Bright (ASLB)

Mr. Wells Eddle1:an Dr. J. H. Carpenter (ASLB)

Chapel Hill Public Library Mr. J. L. Kelley (ASLB)

Wake County Public Library 411 Fayettevillo Street

  • P. O. Box 1551
  • Raimgh. N C 27602

Enetsura i

~

w,,. -.

plm' gQQ Carolina Power & Light Company January 5, 1981 Mr. J. P. O'Reilly Region II' U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Ceorgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 IE BULLETIN 80-21

Dear Mr. O'Reilly:

As requested by IE Bulletin 80-21, Carolina Power & Light Company (CP&L) has reviewed the design of the Shearon Harris Nuclear Power Plant (SHNPP) with regard to the use of valve parts cast by Malcolm Foundry Company, Inc. CP&L has determined that active anfety related valves which have parts supplied by Malcolm Foundry are used on SHNPP Units 1 and 2.

Anchor Darling

. Valve Company is the only affected valve manufacturer. Attachment 1 is a compilation of valve parts as well as the valve tag numbers which are used in safety related systems on SUNPP.

Anchor Darling is arranging tests to determine that the material in the affected valves is acceptable.

At.y valve parts having properties not in accordance with ASIt material specification will be replaced by Anchor Darling. Resolution of this item will be complete before receipt of the facility operating license.

If you have any questions on this subject, please contact our staff.

CP&L plans no further response to this bulletin.

Yours very truly, g3 k M. A. McDuffie /

Senior Vice President Engineering & Construction ONH/dk (NI/18)

Attachment cc: Director, Division of Reactor Construction Inspection Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 c'

~

....,.o

.....,.a~

p., o,, &,....,, _,,,,,

._I m, g^ 411 Fayettevdfe Street

  • P. O. Dos 1551
  • Rafeign. N C. 27602

}[{

Qf

~~*r*MTQ*~'t'Tirer* ~~mt *menwr ~~ r-= t 3

... - ),g

,l' se r

c c.

3

~

ATTACHMENT 1 VALVES WITH MALCOLM FOUNDRY CO MANUFACTURED PARTS

'A/DV Valve

.S.O./ Item Qty Part Description /Dwg. No.

Description Valve No.

~

E5796-2 6-Handwheel D8271 4"900 GTMAN 3AF-V5SA-1.

6 Handwheel Insert B50508 3AF-V6SA-1 3AF-V7SA-1 3AF-V14SA-1 3AF-VISSA-1 3AF-V16SA E5796-12 8

Handwheel D8268 3"150 GTMAN 3PM-V4SN-1, 2 8

Handwheel Insert B50504 3PM-V5SN-1, 2 1

3PM-V26SN-1, 2 3PM-V47SN-1, 2 E5796-14 2

Handwheel D8269 4"150 GTMAN 2CT-V59SAB-1,2 2

Handwheel In' sert B50506

~

.E5796-15 6

Handwheel D8269 4"105 GTMAN 3PM-VISN-1 6

Handwheel Insert B50506 3PM-V109SN-1+2 3PM-V2SN-1, 2

~

3PM-V3SN-1, 2 E5796-19 4

Handwheel D8220 8"300 GTM0 2CT-V21SA-1, 2 2CT-V43SB-1, 2 E5796-3 4

Valve Yoke 6"900 GTM0 2MS-V8SB-1, 2 2MS-V9SA-1, 2 O