Rev 1 to Monthly Operating Rept for Jul 1984
ML20098D718
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/31/1984
From: Putnam K
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20098D619 List:
References
NUDOCS 8409270711
Download: ML20098D718 (1)


Text

-.

t OPERATING DATA REPORT REVISION I DOCKET NO. 050-0331 DATE 9-15-64 4

COMPLETrD BY Ken S.Putnam TELEPHONE 319-851-7456 OPERATING STATUS I

Notes

1. Unit Name Duane Arnold Energy Center J
2. Reporting Period July, 1984
3. Licensed Thermal Power (MWt):

1658

4. Nameplate Rating (Gross MWe):

565

5. Design Electrical Rating (Not MWe):

538

6. Maximum Dependable Capacity (Gross MWe): _ 54 5
7. Maximum Dependable Capacity (Net MWe):

55 8 If Changes occur in Capacity Ratings (ltems Number 3 Through 7) Since the Last Report, Give Reasons

9. Power Level to which Restricted, if Any (Not MWe):
10. Reasons For RestrIctlons, If Any:

i This Month Yr-to-Date Cumulative II. Hours in Reporting Period 744.0 5111.0 83255.0

12. Number of Hours Reactor Was Critical 705.0 3733.5 5 % 85.0
13. Reactor Reserve Shutdown Hours 0.0 150.3 150.3
14. Hours Generator On-Line 691.1 3621.6 58064.3 f
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 1031560 5300217 73048779 l
17. Gross Electrical Energy Generated (MWH) 340073 1785265 24479322
18. Not ElectrIcel Energy Generated (MWH) 319515 1681406 229199 %
19. Unit Service Factor 92, 9 _

70.9 69.7 l

l

20. Unit Availability Factn, 92.9" 70.9 69.7 l
21. Unit Capacity factor (Usine, MJC Net) 83.4 63.9 53.5
22. Unit Capacity Factor (Using DER Net) 79.8 61.2 51.2

~

23. Unit Forced Outage Rate 7.1 17.9 17.3
24. Shutdowns Schertuled Over Next 6 Nonths (Type, Date, and Duration of Each):

r 1

mintenance Outaae September 28 to October 21, 1984 s

25. If Shut Down At End Of Report Perfod, Estimated Date of Startup:

B409270711 040915 ggf773 PDR ADOCK 05000331 R