ML20098D643

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for May 1984
ML20098D643
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/31/1984
From: Putnam K
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20098D619 List:
References
NUDOCS 8409270682
Download: ML20098D643 (1)


Text

. _

61,

?

s OPERATING DATA REFORT REVISION 1 DOCKET NO. 050-0331 DATE 9-15-84 COMPLETED BY Ken S.Putnam TELEPHONE 319-851-7456 OPERATING STATUS Notes r

1. Unit Name Duane Arnold Enoray Center
2. Reporting Period by, 1984
3. Licensed Thermal Power (MWt):

1658

4. Nameplate Rating (Gross MWe):

565

5. Design Electrical Rating (Not MWe):

538

6. Maximum Dependable Capacity (Gross MWe):

54 5

7. Maximum Dependable Capacity (Net MWe):

515

8. If Changes Occur in Capscity Ratings (Items Number 3 Through 7) Sinew the Last Report, Give Reasons:

d

9. Power Level to Which Restricted, if Any (Not MWe):
10. Reasons for Restrictions, it Any:

1 i

This Month Yr-to-Date Cumu lat ive

11. Hours in Reporting Period 744.0 3647.0 81791.0 I
12. Number of Hours Reactor Was Critical 390.2 2732.6 58667.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 388.8 2689.0 57131.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 451809 3975369 71723931
17. Gross Electrical Energy Generated (MWH) 153533 1352158 24046215
18. Net Electrical Energy Generated (MWH) 143678 1275141 22513731 i
19. Unit Service Factor 52.3 73.7 69.9 l
20. Unit Availability Factor 52.3 73.7 69.9 l
21. Unit Capacity Factor (Using MDC Net) 37.5 67.9 53.4 4
22. Unit Capacity Factor (Using DER Not) 35.9 65.0 51.2 i

j

23. Unit Forced Outage Rate 0.0 18.3 17.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Maintenance outaae bealnnino May 16, 1984 lastina 2 to 4 weeks.

i l

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

June 15, 1984

  • Turbine Rating: 565.7 MWe Generator Rating: 663.5 (MV4 i x.90 (Power Factor) = 597 MWe 8409270682 840915 ggj773 I

PDR ADOCK 05000331 R

PDR

.-- _