gi TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ot
_400 Chestnut Street Tower II yg uptl29, 1 84 BLRD-50-438/83-35 BLRD-50-439/83-31
- U.S.' Nuclear. Regulatory Commission
~ Region II- ~
Attn:
Mr. James P. O'Reilly, Regional Administrator-101 Marietta Street,- NW, Suite 2900
. Atlanta, Georgia 30323 I
Dear Mr. O'Reillyt
- BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - B&W PLANT INTERNAL BOLT FAILURES
- BLRD-50-438/83-35, BLRD-50-439/83 THIRD INTERIM REPORT 4
I The subject deficiency was initially reported to NRC-0IE Inspector Linda -Watson on May 13,1983 in accordance with,10 CFR 50.55(e) as NCR R-30.
This was 4
followed by our interim reports dated June 13 and December 5,.1983 NCR BLN NEB 8413 has also been generated to document this concern. TVA intends.to report on both NCRs simultaneously. Enclosed is our third interim report.. We expect to submit our next report by May 8,1985. A'several, week delay of this submittal j
was discussed with Inspector P. E. Fredrickson on July 23, 1984.-
If you have any questions, please get in touch with' R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY-
[
L. M. Mills, Manager Nuclear Licensing Enclosure j-cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555-Records Center (Enclosure) i Institute of Nuclear Power Operations i
1100 Circle 75 Parkway, Suite 1500.
Atlanta, Georgia 30339 l
8409240145 840829 i
PDR ADOCK 05000438 r#FFICIAL COPY S
pyg g21 q,1
- E*b ge ENCLOSURE BELLEFONTE NUCLEAR PLANT ~ UNITS 1 AND 2 B&W PLANT INTERNAL BOLT FAILURES BLRD-50-438/83-3F, BLRD-50-439/83-31 10 CFR 50.55(e)
NCRs -R-30 AND BLN NEB 8413 THIRD INTERIM REPORT
'Descriotion of Deficiency The Babcock and Wilcox (B&W) Owners Group has opened issue R-30 " Internals Bolting Failures" documenting a potential safety concern with B&W plants.
Specifically, there have been failures of A-286 bolts used in various reactor internals applications at Oconee-1, Rancho Seco and Crystal River-3 Although B&W contends that the problem is not applicable to Bellefonte, TVA has questioned B&W's determination and is awaiting a reply from B&W. Until such time that R-30 is determined to not be a concern at Bellefonte, TVA considers the condition to be a potentially reportable nonconformance. Consequently, this NCR is intended to track the potential concern for Bellefonte.
Interim Progress As indicated in the second interim report on this deficiency, TVA is proceeding with the replacement of all A-286 bolts in reactor internals applications. B&W has submitted portions of the field' d1ange package (FCP) required for the replacement of the unit 1 A-286 material. TVA will submit a final report upon receipt, review, and approval of the entire units 1 and 2 FCPs.