ML20097J698
| ML20097J698 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/23/1984 |
| From: | Mangan C NIAGARA MOHAWK POWER CORP. |
| To: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| (NMP2L-0137), (NMP2L-137), NUDOCS 8409210350 | |
| Download: ML20097J698 (1) | |
Text
,
4 NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 August 23, 1984 (NMP2L 0137)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
The final report in accordance with 10CFR50.55(e) concerning items supplied by Tube-Line Corporation will be submitted to the Nuclear Regulatory Comission by October 1,1984, rather than August 15, 1984. During the
.verif4 cation process, it was determined that the results of the initial investigation of Category I installations were inconclusive; therefore, additional investigations were initiated. This information was communicated to your staff end the extension granted, via a telephone conversation between Mr. G. Griffith (Nine Mile Point Unit #2, Licensing) and Mr. P. Russ of your staff on August 8,1984.
Very truly yours, C
Vice President Nuclear Engineering & Licensing 3~
GG:ja xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington,DC20j55 R. A. Gram, Reside.nt Inspector ? -
Project File (2) 8409210350 840823 PDR ADOCK 05000410 g
S PDR y\\y k
16 31