ML20097J664
| ML20097J664 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/20/1995 |
| From: | Chandu Patel NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20097J668 | List: |
| References | |
| NUDOCS 9504280264 | |
| Download: ML20097J664 (7) | |
Text
.
@ ctcue 25, UNITED STATES
!g*)
E NUCLEAR REGULATORY COMMISSION
'I wAswiwovow, o.c. aosas.ooot
.s...../
ENTERGY OPERATIONS. INC.
DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION. UNIT 3 AMENDHENT TO FACILITY OPERATING LICENSE Amendment No. 104 License No. NPF-38 1.
The Nuclear Regulatory 'Comission (the Comission) has found that:
A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated August 5, 1993, complies with the standards and l
requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance witn 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
9504280264 950420 PDR ADOCK 05000382 P
a L
. = -
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-38 is hereby amended to read as follows:
1 (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.104, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Clas e P.h>
Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 20, 1995
t ATTACHMENT TO LICENSE AMENDMENT NO. 104 L
TO FACIllTY OPERATING LICENSE NO. NPF !
DOCKET NO. 50-382 Replace the following pages of the Appendix A Technical Specifications with the attached pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf page is also provided to maintain document completeness.
REMOVE PAGES INSERT PAGES V
V i
3/4 3-49 3/4 3-49 3/4 3-54 3/4 3-55 l
B 3/4 3-3a B 3/4 3-3a 4
1 i
1
\\
INDEX LIMITING CONDITION FOR OPERATION AND SURVEILLANCE RE0VIREMENTS SECTION PAGE 3/4.2 POWER DISTRIBUTION LIMITS 3/4.2.1 LINEAR HEAT RATE........................................
3/4 2-1 3/4.2.2 PLANAR RADIAL PEAKING FACT 0RS...........................
3/4 2-3 3/4.2.3 AZIMUTHAL POWER TILT....................................
3/4 2-4 3/4.2.4 DNBR MARGIN.............................................
3/4 2-6 3/4.2.5 RCS FLOW RATE...........................................
3/4 2-10 3/4.2.6 REACTOR COOLANT COLD LEG TEMPERATURE....................
3/4 2-11 3/4.2.7 AXIAL SHAPE INDEX.......................................
3/4 2-12 3/4.2.8 PRESSURIZER PRESSURE....................................
3/4 2-13 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION......................
3/4 3-1 3/4.3.2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION......................................
3/4 3-13 3/4.3.3 MONITORING INSTRUMENTATION l
RADIATION MONITORING INSTRUMENTATION.................
3/4 3-28 SEISMIC INSTRUMENTATION..............................
3/4 3-35 METEOR 0LCi' CAL INSTRUMENTATION.......................
3/4 3-38 REMOTE Sb)10f+4N INSTRUMENTATION......................
3/4 3-41
)
i ACCIDENT MONITORING INSTRUMENTATION..................
3/4 3-44 1
CHEMICAL DETECTION SYSTEMS...........................
3/4 3-47 EXPLOSIVE GAS MONITORING INSTRUMENTATION.............
3/4 3-60 i
3/4.3.4 DELETED.................................................
3/4 3-68 l
WATERFORD - UNIT 3 V
Amendment No. 50,58,103,104
]
INDEX LIMITING CONDITION FOR OPERATION AND SURVEILLANCE BEQUIREMENTS SECTION GAG {
3/4.4 REACTOR COOLANT SYSTEM 3/4,4.1 REACTOR COOLANT LOOPS AND COOLANT CIRCULATION STARTUP AND POWER 0PERATION.............................
3/4 4-1 HOT STANDBY.............................................
3/44-2 HOT SHUTD0WN............................................
3/4 4-3 COLD SHUTDOWN - LOOPS FILLED............................
3/4 4-5 COLD SNUTDOWN - LOOPS NOT FILLED........................
3/4 4-6 3/4.4.2 SAFETY VALVES SHUTD0WN.............................................
3/4 4-7 0PERATING............................................
3/4 4-8 3/4.4.3 PRESSURIZER PRESSURIIER..........................................
3/4 4-9 AUXILIARY............................................
3/4 4-9a 3/4.4.4 STEAM GENERATORS.................'.......................
3/4 4-10 3/4.4.5 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS............................
3/4 4-17 OPERATIONAL LEAKAGE..................................
3/4 4-18 3/4.4.5 CHEMISTRY...............................................
3/4 4-21 3/4.4.7 SPECIFIC ACTIVITY.......................................
3/4 4-24 3/4.4.8 PRESSURE / TEMPERATURE LIMITS REACTOR COOLANT SYSTEM...............................
3/4 4-28 PRESSURIZER HEATUP/C00LDOWN..........................
3/4 4 33 OVERPRESSURE PROTECTION SYSTEMS......................
3/4 4-34 3/4.4.9 STRUCTURAL INTEGRITY....................................
3/4 4-36 3/4.4.10 REACTOR COOLANT SYSTEM VENTS............................
3/4 4-37 3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3/4.5.1 SAFETY INJECTION TANKS..................................
3/4 5-1 3/4.5.2 ECCS SUBSYSTEMS - Modes 1, 2. and 3.................... 3/4 5-3 1
3/4.5.3 ECCS SUBSYSTEMS - Modes 3 and 4........................
3/4 5-8 3/4.5.4 REFUELING WATER STORAGE P00L...................,........
3/4 5-9 WATERFORD - UNIT 3 VI Amendment No. 22.34 1
1 i
)
t 0
Pages 3/4 3-49 through 3/4 3-59 have been deleted.
i t
t I
L l
i
[
I
)
WATERFORD - UNIT 3 3/4 3-49 AMENDMENT NO. 50 104 7
Next page is 3/4 3-60 l
r e
INSTRUMENTATION BASES l
for the system is thus based on testing and operating experience, and the set-point is set at the lowest achievable IDLH gas concentration providing reliable l
operation and the optimum detection of toxic gases. The setpoint is therefore l
subject to change wherein necessitated by operating experience such as a result j
of changes in the Waterford 3 area chemical atmospheric profile. The setpoint is established and controlled by procedure.
3/4.3.3.8 This section deleted 3/4.3.3.9 This section deleted l
1 I
{
WATERFORD - UNIT 3 B 3/4 3-3a AMENDMENT NO. 14,20,50,104
_-