ML20097J167

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-57,changing Shutdown Requirements of Operability Definition from Previous Tech Spec Change Request & Replacing Incorrectly Identified Page 1-4 W/Page 1.0-3.Fee Paid
ML20097J167
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/12/1984
From: Beckham J
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20097J168 List:
References
NED-84-412, NUDOCS 8409210133
Download: ML20097J167 (3)


Text

I 1 l

l.* Georgea Pcwer Cerrpany -

333 Pearnont Avenue Atianta. Geoga 30308 Teicphone 404 526-7020 MaMg Address Post Omce Ucx 4545 Atlanta Georg2a 30302 Georgia Power J. T. Beckham, Jr.

V:ce President and Genera! Vana;er N p 84-412 fluc! ear Generat.on September 12, 1984 Director of N1 clear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. N1 clear Regulatory Commission Washirgton, D. C. 20555 NRC DOCKET 50-321 OPERATING LIGNSE DPR-57 EDlIN I. HA'ICH NUCLEAR PLANT UNIT 1 RTNISION OF PREVIOUS REQUEST 'IO CHAME TECHNICAL SPTIFICATIONS Gentlemen:

Our letter of May 4, 1984 recpested a Technical Specifications change for Hatch Unit 1_which would expand the definition of " Operability" (as recpested bf NRC) to include functionality of mpport eglipment. We now reglest that the shutdown reglirements of the previously reglested definition be amended. Additionally, the page albnitted was incorrectly identified as a Unit 2 Technical Specification page. We therefore wish to amend our albnittal of May 4, 1984 to replace the previously mbaitted Technical Specification page (incorrectly identified as page 1-4), with the enclosed page'l.0-3.

The shutdown recpirement contained in the May 4,1984 albnittal has been revised to call for entering the Hot Shutdown condition in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> instead of specifying Hot Standby in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Hot Shitdown in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

This allows consistency with other Limiting (brditions for Operation and provides more operational flexibility. No other changes have been made to the content of the previous albnittal.

The Plant Review Boar'd has determined that the proposed revisions to our previous albnittal do not constitute an unreviewed safety cuestion. The revised shutdown recpirement does not affect probabilities or consecpences of analyzed accidents. No new accident types are created. The margin of safety is not affected.

The -safety evaluation and determination of no significant hazards enclosed with our May 4,1984 mbnittal remain valid.

Enclosed is payment of filing fee.

o tal h0133840912OcKODOOOg g l

e

~

Georgia Power A Director of N.1 clear Reactor Regulation U. S. N1 clear Regulatory Comnicsion September 12, 1984 Page 2 j R1ralant to the reglirements of 10 TR 50.93, Mr. J. L. Iedbetter of the Envirortnental Protection Division of the Georgia Department of Natural l

Resources will be sent a copy of this letter and all applicable attachnents.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Conpany and is althorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEDRGIA IOWER CDMPANY By: [

J. T. Beckham, Jr' Sworn to nd albscri before me this 12th day of tUt gr,1984.

g

'~' '

g p$ i En p red sept.18,1987 Notary Riblic REB /

Encloatre xc: H. C. Nix, Jr.

Senior Resident Inspector J. P. O'Reilly, (NRC-Region II)

J. L. Iedbetter e

Y

, ATTACINENP 1 NRC DOGET 50-321 OPERATING LI NSE DPR-57 ENIN I. HA'ICH NUCLEAR PIANP UNIT 1 PRO 10 SED OIANGES 'IO TECHNICAL SPECIFICATIONS Thei proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be . incorporated as follows:

Remove Page insert Page 1.0-3 1.0-3 A

L r

_ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ . _ _ . _ . _ _ _ . _ _ _ - - _ _