NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE. N.Y.13202/TELLPHONE (315) 474-1511 August 23, 1984 (NMP2L 0141)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 63' Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning installation of Quality Assurance Category I bolted flanged piping joints without a documented procedure. This problem was reported via telecon to S. Collins of your staff on July 23, 1984.
Very truly yours, C. V. Manga Vice President Nuclear Engineering & Licensing NLR:Ja Enclosure xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 ProjectFile(2) 8409130463 840823 PDR ADOCM 05000410 a !
S pn j
e l
L M
c..-
s',
NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Bolted Flanged Piping Joints (55(e)-84-28)
Description of the Problem The _ problem concerns the installation of Quality Assurance Category I bolted flanged piping joints by ITT Grinnell without a documented procedure.
10CFR50, Appendix 8, Criterion V states, in part, that the activities affecting quality shall be prescribed by documented instructions and procedures. The matter is still under investigation, and a final report will be submitted by November 15, 1984.