Forwards Monthly Operating Rept for Jul 1984.June 1984 Operating Data Rept, Gross Thermal Energy Generated, Inadvertently Given in MW Days Rather than MW H
ML20097A404
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 08/03/1984
From: Thornberry R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20097A408 List:
References
NUDOCS 8409130263
Download: ML20097A404 (2)


Text

.

,7 a-PACIFIC OAS AND E LE C T RIC C O M.PANY pgg , DIABLO CANYON POWER PLANT i RO. Box 56 Avila Beach, Cahfornia 93424 - (805) 595-7351 R.C. THORNBERRY PLANT MANAGER August 3, 1984 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE: Docket No. 50-275 License No. DPR-76 Monthly Operating Report for July, 1984 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for July 1984. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications. Please note that in last month's Operating Data Report, the " Gross Thennal Energy Generated" was inadvertently given in megawatt days rather than megawatt hours.

Sincerely, SVf R. C. THORNBERRY

^

RCT:jhr Enclosures cc Mr. John B. Martin, Regional Administrator Region V - USNRC M

B409130263 840803 PDR ADOCM 05000275 h

R pop I t DC0044 1

' MONTHLY NARRATIVE REPORT

. OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance 2xperience for the month of July,1984. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the Plant Technical Specifications.

On July 24, 1984, a low power natural circulation test was performed for operator training qualification.

There is no significant major safety-related maintenance to report.

No challenges to the PORV's or safety valves have been made.

On May 25, 1984, minor changes were made to the Environmental Radiological Monitoring Procedure. The changes consist of the assignment of responsibilities for documentation and application of corrective actions and the addition of more sample points to Table 6 " Summary of Cross Checks Program with State of California". The addition of more sample points to the Cross Chrecks Program was in response to an agreement with the State of California.

No changes have been made in the Offsite Dose Calculation Procedure, or any radioactive waste trehtment systems.