ML20096G678
| ML20096G678 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/04/1984 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Harold Denton, John Miller Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20096G681 | List: |
| References | |
| RTR-NUREG-0737, TASK-2.B.3, TASK-TM TAC-57058, TAC-57059, NUDOCS 8409110094 | |
| Download: ML20096G678 (1) | |
Text
'
g,
,.~
MSCORSin Electnc me coune 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 September 4, 1984 De' ton, Director Mr.
H. R.
n Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr.
J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:
DOCKETS 50-266 AND 50-301 NUREG-0737, ITEM II.B.3 CORE DAMAGE ASSESSMENT METHODOLOGY POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 In Mr.
J.
R. Miller's letter of November 3, 1983, which transmitted the Safety Evaluation for the Post-Accident Sampling System at our Point Beach. Nuclear Plant, we were requested to
~
provide a plant-specific procedure which implements the Westinghouse Owners' Group (WOG) Post-Accident Core Damage Assessment Methodology.
Pleasel find-attached Emergency Plan Implementing Procedure (EPIP) 1.7, " Core Damage Estimation Procedure".
EPIP 1.7 will be used to implement the WOG methodology.
This fulfills the final require-ments for this item as. stated in the November 3 Safety Evaluation.
Should you have any questions concerning this matter, please do not hesitate to contact us.
Very truly yours, Vice-Presid nt-Nuclear Power C. -. W. Fay Attachment Copy to.NRC Resident Inspector 8409110094 840904 d(p PDR ADOCK 05000266 F
PDR E l
>