co Arizona Public Service Company August 23, 1984 ANPP-30309-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside oike Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resir' int Reactor Projects and Engineering Programs
Subject:
Interim Report - DER 84-51 A 50.55(e) Potentially Reportable Deficiency Relating To Failure Of The Turbine Driven Auxiliary Pump To Quick Start From Ambient Conditions.
File: 84-019-026; D.4.33.2
Reference:
Telephone Conversation between D. Hollenbach and T. Bradish on July 24, 1984
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by September 20, 1984, at which time a complete report will be submitted.
Very truly yours, g
W E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director
~ EEVB/IRB/nj At tachment g',~ U3c,,
cc: See Page Two
.' - llliV 12 m;; y 8409070364 840823 yp f ^# 0 hog 03hl3b3y Ir It -27
p
.!9 L
Mr.'T. W. Bishop DER 84-51 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Connaission Washington, D.-C. 20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide y
D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fovier T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr.
W. J. Stubblefield.-
W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom D. Canady Records Center Institute of Nuclear Power Oper4.tions 1100 circle 75 Parkway, Suite 1500 i
Atlanta, GA 30339 I
i l
1
t-
,o-s INTERIM-REPORT - DER 84-51
' POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 1 I.
~ Potential Problem The Turbine Driven Aux. Feedwater Pump (AFA-P01) must deliver.
Aux. Feedwater to the Steam Generator (s) within 20 seconds of
~
. receiving'AFAS signal (s) starting in a cold ambient condition.
The Terry Turbine trips on overspeed when starting from' cold
' ambient. condition.
II.
Approach To'and Status Of Proposed Resolution Bechtel' Engineering is currently studying this problem to
~ determine reportability and technical justification for corrective ~ action.
III.
. Projected CompleElon of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by September 20, 1984.
b a.
.