Monthly Operating Repts for Apr 1992 for Limerick Generating Station,Units 1 & 2
ML20096E007
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/30/1992
From: Meck K
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20096E005 List:
References
NUDOCS 9205190015
Download: ML20096E007 (11)


Text

p_

'. ;s 3923029410 e

Docket No. f50-352 Attachment to Monthlt

/ Operating Report foz April 1991 LIMERICK GENERATING STATION UNIT 1 APRIL 1-THROUGH APRIL 30, 1993 J.

I. NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES Limerick Unit 1 was in the fourth refuel entage throughout the

', month. On Friday, April 10, Unit 1 reactor core offload was completed to support shuffling of control rod blades, HCU and CRD maintenance,- replacement of all LPRM strings and maintenance and testing on Emergency Core Cooling Systems. On Tuesday, April 28, Unit l entered OPCON 5 and began reactor

~

core' reload. Unit i ended this reporting period on day 42 of the Refueling Outage with reactor core reload in progress.

Operational events that- occurred during the month of April

-included:

The 'B' ESW loop war.i%.clared Inoperable to support isolntion

  • - valve installation ca the 'B' loop ESW piping in the Unit 1 HPCI room. Unon completion of valve installation and testing on Monday,-April 27-(54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> and 55 minutes had elapsed) 'B'

'3W was declared operable.

II. CHALLENGES TO MAIN STEAM EAFET'LEEI,IEF VALVES There were no challenges to the Main Steem Safety Relief Valves during the month of April, oprtgext te s

1

- 920S190015 920512 PDR- ADOCK'OSOOC352 R. PDR 9  %

4 e

l :. _,

O wu' T.

-g-N' C =-

to N

0%-

to 3

J 4 4 - 1 O I- W 4 1 24 N i >

I 4 4 5 2 m- W l I 1 ai C 19 .J I 6 62 i  ;*

I I 4 OI b 2 i E 4 1 IUl 4 0t k2 8 4 4 i H M i J t n l

404 M in i on I 1 es 1 Zl &H I t E' - O ha l WJ O O O O O O OG O O O C O O l"1I eF i E Z F 4 >Z l F. IOl O M X 4 Aa 4M i' 4W M W ul a w 4sj 4 2 4 $J H 4- 1 ( ]iit i 3I I un f 'A E OW Q 7}

4- 4 5 k ui O t w L 14 h3 w Z - N4 uJ

.6-N 1 M CL 2 W e t 0 i i @ t T4 330 t i 4 1 4 m i sk I

  • in N i E 2

- N IM l e t J lU Mg NI' k1 J

. 40 $ U i

- C9 i ul I ke M M U ' 01 1 > ,

H s *1 O i M 'e- uJ w I 4 kJ E I CO 8 4 4 CI: ZE a t

.> 't si l 4 Jt .) O w w in g h4 4 kI > I ** 6 CE a M 2 e I

--4 OIM 4 4 6 Il 4 uJ 3 w Nt > b g) m o e- N M 4 in ID 6 CD G O 40 l J# 3 I A e E E ED J w 6 4 e - e- N N N N N N .g N N N gn

-E. Q W + .W kJ > ul

% O ~ > Z-  %

D Z Z 4 4 o 4 3 0 4  %

. F 3 c.

e-~ W O w M X U J J

2 U uJ ud 3 O H >

0 kt

> J >

.3

' at' uk

.O J Om us ab -

0 W O O O OO O O O O O O O O O O O 4' N t >Z M @6 J L kJ Gt m ha

>': c- t gr 3 4 1 0 3E Jl w

    • t U E I a1 O.:

4 1 E t us a >

4 4 l

1 F > e N (9 4 to O b G) @ O e N, t,o 4, i,n @

1 as e r ,

O Q R

A I

. OPERATING' DATA REPORT.

3923029410..s. J DOCKET NC. 50 - 352

.___.-- . w :_- =.. ->

DATE'MAY 8. 1992..

, c,_ - ...._-__.._.......

COMPLETED BY PHILADELPHIA ELECTRIC COMTANY' KARL MECK REPORTS SUPERVISOR 1 BUSINESS UNIT

- LIMF, RICK CENER ATING STATION TELEPHONE-(215) 327-1200 EXTENSION 3320

CPERATING STATUS
1. UNIT NAEnr LIMERICK UNIT 1
l. NOTES: THE UNIT WAS IN A REFUEL i
2. REPORTING PERIOD: APRIL. 1992. -). ' OUTAGE THE ENT?oE PERIOD.

~3. LICENSED THERMAL POWER (MWTis 3293"

4. HAMEDLATE RATING (GOOSS MwE}: 1138.

S DESIGN ELECTRICAL RATING (NET MWE): 1055

6. MAXIMcC DEPENDr.BLE CAPACITY -(GRDSS MwE): 1092' ----
i. .
7. MAXIMUM DEPENDABLE CAPPCITY .(NET.uwE): l-1055 .. l ' . . -
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TH3.OUGH 7) SINCE LAST REPORT. GIVE REASONSt

'9. POWER LEVEL TO WHICH RESTRIC'TED..IF ANY (N'T FWE):

10. PEASONS FOR RESTRICTIONS. IF ANY:

-THIS MONTH VR-TO-LATE CUMULAT7VE

11. POURS IN REPORTING PERIOD 719 2.903 54.743
12. NUMEER OF HOURS REACTOR WAS CRITICAL 0 1.910.2 43.219.0 .
13. REACTOR RESER~.iE SHUTDOWN HOURS 0.0 c.0 0.0 14, HOURS GENERATOR ON-LINE O.0 1.903.9 42.345.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 . 0.0 0.0
16. GROSS THERMAL ENERGY' GENERA'/ED (KwH) 0 6.163.245 128,152.161
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 2.033.300 41.534.240
18. NET ELECTRICAL ENERGV GENERATED (MwH) * -878 4.960.170 39.771.626 PAGE 1 OF 2

+

OPERATING'DP.TA REPORT (CONVINUED) DOCKEe NO.'50.-:333 39230294 W~.

DATE MAY 8,.1992 1 THIS MOtiTH VR-TO-DATE- ' CUMULA s'I'VE

19. UNIT SERVICE FACTOR 0.0 65.6 T7.4 ->

...... . .-..-- - s- ......--

20. UN1T AVAILABILITY FACTOR 00 65.6 T7.4
21. UNIT CAPACITV FACTOR (USING'.3C NET) C.0 64.0 68.9
22. UNIT CAPACITY FACTOR (USING sFR NET)' O.0 64.0' 68.9
23. UNIT FORCED'0UTAGE RATE 0.0 0,3 4.3 24 SHUTDOWNS SCHEDULED OVER.NEXT 6 MONTHS (TYPE, DATE. AND OUDATION OF EACH)t 4TH REF;: .iNG OUTAGE: 03/2'/92: TO DAYS
25. Ir SHUTDL,.' AT END OF REPORT PERIOD. ESTIMATED.DATE OF.5TARTUP:
26. UNITS IN TEST STATUS (CRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITJAL CRITICALITY 12/19/84 12/22/84

' INITIAL ELECTRICITY MIL APRIt.. 85 4/13/95 COMMERCIAL CPERATION 15T OTu 86  ?/01/86 PAGE 2 OF 2

  • - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAu ENCRG' REGUtATORY COMMISSION REPORTS.

~ 3923029410s UMIT SHhTDOWN3 AND POCER [EDUCIIONS ' DOCKET NO. 90 - 352' -

L

. UNIT MAME LICERICM -UNIT..?- ~,

  • DATE ~AY 8, 1 *L 2 - . , .

REPORT MONTt- l APRIL,L1992 COMPLETED BY.PHILADdLPHIA ELECTRIC COMPANY KARL MECM REPORTS SUPERVISOR

. BUSINESS UNIT LIMERICM GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 METHOD OF I LICEr$EE' SYSTEulCOMPONENT. CAUSE AND CORRECTIVE.

TYPE DURATION REA1.d SHUTTINGDOWNl EVENT CODE f 7 CODE' ACTION:TO NO. DATE (1)'-(HOURS). (2) REA CTOR (3) l REPORT.#: -. ( 4 ) l' (5) PREVENT RECURREdCE

'l l' .]

13 920401 S 719.0 C 2 i N/A ZZ ZZZZZZ THE UNIT REMAINED IN THE TOURTh REFUELING OUTAGE INE ENTIR2 P"RI}&.

719.0 i-

.(1) (2) (3) (4)

'F - FORCED REASON METHOD' EXHIBIT G - INSTRUCTIONS S - SCHEDULED A.- EQUI ^ TENT FAILURE (EXPLAIN) 1 . MANUAL FOR PR2PARATION OF DATA B - MAINTE*4ANCE C0 TFFT 2 - MANUAL SCRAM. ENTRV SNEETS FOR LICENSEE C - RE*UELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) 0 - REGULATORV RE5idIfP'ON 4 - OTHER (EXPLAIN) FILE (NUPEG-0161)

E - OPERATOR TRAINING + .ICENSE EXAM!i.ATION F - ADMINISTRATIVE (S)

G . OPERATIONAL ERROR (EkPLAIN)

H - OTHER(EXPLAIN)' EKMIeIT I - S*ME SOURCE

=

4

3923029410

(

Docket No.-#50-353 c Attachment to Monthly Operating Report for April 1992 LIMERICK GENERATING STATION UNIT 2 APRIL 1 THROUGH APRIL 30, 1992 s

I. ljARRATIyR

SUMMARY

OF OPERATING EXPERIENCES Limerick Unit 2 began the month of April at a nominal 100% of rated thermal power. On Wednesday, April 8, reactor power was briefly reduced to 90% to support a control rod pattern adjustment. and Main' Turbine cor. trol v?lve testing. On

Saturday April 25, reactor power was reduced to 95% to support isolation of a condenser waterbox because of a leaking condenser tube. On Sunday April 26, reactor power was returned to 100% of rated ther1 cal power - adequate condensor vacuum was able to be maintained with one waterbox isolated.

On Thursday April 30, reactor power was reduced to 98% of rated thermal power due_to increasing turbine-back pressure due to isolation of a mtin condenser waterbox. Unit 2 ended this operating period at 9G% of rated thermal power.

Operatfonal events that occurred during the month of April includad:

The 'B' ESW loop was declared Inoperable to support isolation valve-installation ot the 'B' loop _ESW piping in the Unit.1 HPCI room. A.one time revision'to the ESW system Technical Specifications ullowed a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> relief-frcm the ESW system Technical-Specification 3 0.3 required shutdown with the 'B' loop of ESW inoperable. Upon completion of valve installation and Lasting on Monday, April 27 (54 hwrs and 55 minutes had elapsed) 'B' ESW was declared operah e.

J II, fEALLENGES TO MAIN STJ2M SAFETY RELIEF VALVES _

There were no challenges to the' Mein Steam Sufety Relief

' Valves during the month.

oprtgex2

w- ' ' ' ' -

.:(

. : gn,

[ ,m'

~. ~ ~

t. =- -;; , , ! -

_ s.

AvEsoEom UNir w nc'M . 3923029410:.

~

O DOCKET NO. 50. .353

......s........_.........-

UNIT LIMERICK . UNIT 2 .c_.-

DATE'.MAY B . 199 2 ',

-COMPANY FHILADELCHIA ELECTRIC COMPkNV-

........ .. _... -....--_..__ cni MARL MECM ,

' REPORTS SUPEov!SOR BUSINE55' UNIT

. LIMERICK GENERATING STATION TELEPHONE (715) 327-1200 EXTEN' ION-3320-MCNT H A^Rll 1992 DAV' AVERAGE DAILY POWER LEVEL ' DAY AVEP'GEA DAILY' POWER' LEVEL (MwE+ NET)' (WWE-MET)

1 1052 17. 1058-

'2: 1052 18 1058

'3 1062 19 1059 4 1060 '2C 1064 5 1067 - 2* 1048 6 1059 22 1050

+

7 1056 23 1053 8 1051 '24 1049 9 '059 25 1v33 10 t053 20 .t043 1' 1056 27 1051 12 1059 28 ;051 13 1061 29 1U51 14 1964 30 1050-15 1G59 16 1063 l

, ,,,,.y - 5 H'

. OPERu!Ne ooA REPORT 139230.29,4:10; ,

DGCMET NO. 50 - 353-

'DATE MAY 8 1992

-COMPLETED BY PHILADELPHIA ELECTRIC COMPANY-

'KARL MECK REPORTS SUPERVISOR BUSINESS UNIT LIMERICK GENERATING' STATION TELEPHONE'(2:5) 327-1200 EXTENSION 3320 OPERATING ETATUS

1. UNIT NAME. LIMERICK UNIT 2 h0TES:.THERE wERE NO LOAD 2,' REPORTING PERIOD: APRIL. 1992 ' REDUCTIONS' GREATER THAN
3. LICENSED THERMAL POWER (MWT)r 3293 20% DURING THE MONTH.

4 NAMEPLATE RATING (GROSS MWE): 1138

5. DESIGN ELECTRICAL RATING (NET MwE): 1055
6. WAXIMUM DEPENPf3LE CAPACITV (GROSS MWE): 1092.

7 .. MAXIMUM DEPENOABLE CA'ACITY (NET FwE): 1055

~__.__ ___..... ___.... _......-_-__-.._ ...--__

8. IF CHANGES OCCUR IN CAPACli RATING 5 (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET M"!):
10. REASONS FOR PESTRICTIONS. IF ANY:

ThTS MONTH YR-TO-DATE CUMULATIVE 11 HOURS IN REoORTING PERIOD 719 2.903 20.255

12. NUMBER OF HOURS REACTO.! WAS CRI~.ICAL 719.0 2.903.0 17.491.*
13. REACTO4 RESERVE SHUTDJW HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 719.P 2.903.0 17.002.2
15. UNIT RESERVE SMUTDO"fN HOURS 0.0 0.0
16. GROSS THERMAL ENERGi  %* 'D (MWH) 2.365.718 9.531.396 54.772.792
17. GROSS ELECTRICAL ENERGY GcNERATED PbwH) 788.760 3.179.080 18.110.716 18.' NET ELECTRICAL ENERGY GENERATED (MwH) 758.412 3.065.276 17.439,141 PAGE 1 OF 2

n, _

.. m ,

3923029410,e

, OPERATING' DATA REPORT;iCONTINUED) DOCKET NO. 60 - 353' "

d . *

'M-3 DATE Mfy'8 1992 THIS MONTH VR-TO-DATE CUMULAliVE

-19.' UNIT SERVICE FACTOR. 100.0 100.0 83.9-

.... . ~.. . . _ - . . . . . . . . ...... ..-..

20. UNIT AVAILABILITY FACTOR- 100.0 100.0 83.9
21. UNIT CAPACITY FACTOR (USING.MDC NET) -100.0- 100.1 81.6.

......-.. ...-... ..-~ -- .....-- .

22. UNIT CAPACITY FACTOR (USING DEM NETi 100.0 100.1 .81.6
23. UNIT FORCED.. OUTAGE RATE U.0 0.0 4.9 24 SHUTDOWNS-SCHEDUf.ED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH1:
25. IF SHUTDOWN AT END OF REPUNT PERIOD. ESTIMATED DATE OF STARTUP
26. UNITS IN' TEST' STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECT 91 CITY C9/01/09 09/01/89 COMMERCIAL OPERATION 02/01/90 01/06/90 t

DAGE 2 OF 2

.. DOCKET NO. 50'- 353

. UNIT 5HUTDOWN.C AND POWER REDUCTIONS UNIT N?.:E LICERICK ' UNIT 2 .

, . - _ - - ~ . . - - - - -

DATE.MAY 8, 1992- ,

' REPORT MONTH' APRIL, 1992 LCGMPLETED SY PHILADELPHIA ELECTRIC COMPANY MARL MECK REPORTS SUPERVISOR BUSINESS UNIT LIMERICK GENERATING STATION TELEPHONE (215).327-1200 EXTENSION 3320

-- ----------------_---------------,-----.----_---s -

l METHOD OF l' LICENSEE

. ' SYSTEM' COMPONENT CAUSE AND CORRECTIVE-TYPE DURATION l REASON SHUTTING OOWN! .' EVENT. CODE CODE' ACTIOA'TO NO. DATE (1) (HOURS)! (2) l . REACTOR (3) ! . REPORT * (4) (5) i PREVENT RECURRENCE i ~l 1 9- 920408 S I 000.0 B 4 -l- N/A RB CONROD LCAD WAS REDUCED 10% FOR CONTROL ROD l '

. PATTERN ADJUTTMENT AND TURBINE CONTROL i ROD VALVE TESTING.

10 920425 F 000,0 A 4 N/A HC- PIPEXX . LOAD WAS REDUCED 5% TO SUPPORT l ISOLATION OF A CONDENSER WATERBOx

" BECAUSE OF A LEAKING MAIN CONDENSER TUSE.

1? 920430 F 000.0 H 4 N/A HC TURBIN LOAD WAS REDUCED 2% DUE TO INCREASING TURBINE BAC PRES $URE BECAUSE OF THE ISOLATION OF THE MAIN CONDENSER I WATERBOx.


l l 1 i (1) (2) (3) (4)

F - FORCED REASON METHOD EXHidIT G - INSTRUCTIONS S- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARAT7"% OF DATA B - MAINTENANCE OR TEST 2 - MAN'3ht SCRAM. ENTRY SHEET!

  • LICENSEE C - REFUELING 3 - AUTOMATIC SCPAM. EVENT REPORT .ER)

D - REGULATORY RESTRICTION . 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE n = -__

~ ~

p:

2

  • .. OPERATING D&Td.CEPORT;(CONT 2NUED)-
CDCKET NO. SO- . ?S3 - ' 92302941'0 ~

7 DATE APRIL 10.-193.1 A THIS MONTH' LYR-TO-DATE . CUMULATIVE

19. UNIT'$ERVICE FACTOR-a 63.2 87.2 73.4 20.. UNIT. AVAILABILITY FACTOR B3.2 87.2 78.4
21. UNIT: CAPACITY FACTOR (USING MDC NET) 62.0. 85.1 69.8.  !

22.fuhIT4 CAPACITY FACTOR,(USIkr. DER NET) 62.0 85.1 69.8 L23 ' UNIT FORCED OUTAGE RATE 0.0 0.3 4.3 g(

2'. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS,(TvPE. DATE. AND DURATION OF EACH):

'4TH REFUELING OUTAGE: 03/21/92: 70 DAYS

.- 2 5 . IF SHUTDOWN AT END OF-REPORT PERIOC. ESTIMATED DATE OF STARTUP:

26. UNITS IN TEST STATUS (PRIOp Tc COMMERCIAL OPERATION): FORECAST ACHIEVED' INITIAL CRITICALITY' 12/19/84 12/22/S4 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL'ODERATION IST QTR 86 2/01/86 PAGE 2 OF 2