ML20096E004
| ML20096E004 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/12/1992 |
| From: | Leitch G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20096E005 | List: |
| References | |
| NUDOCS 9205190014 | |
| Download: ML20096E004 (1) | |
Text
-
T.S.6.9.1.6
' +.
PHILADELPIIIA ELECTRIC COMPANY LIMERICK GENSRATING STATION P. G BOX 2300 POITSTO%VN, FA 19464-0920 (215) 327-1200, EYT. 3000 May 12, 1992 Docket Nos. 50-352 whAHAM M. LEITCH vce racsoeur 50-353 uMERcK GENEPMG sm License Hon.. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn:
- Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and - 2 for. the month of. April, 1992 forwarded pursuant to Technical Specification 6.9.1.6.
Also enclosed is Revisa.on 1 to the Match,1992 report for Limerick Unit 1.Which corrects the Unit Forced Outage Rate figures (lino 23).
This error occurred as a
. result of an; incorrect entry of Refueling Outage hours as forced outage hours.
- We regret any inconvenience this error may have caused.
Very t ul
- yours,
(
i
}'
,/
~GSF
' Enclosures.
'cc:.
T. T. Martin, Administrator, Region I, USNRC
- m. J. Kenny, USNRC Senior Resident Inspector
/ 9' l
i
..4annii Q
.9205190014 920512 1
PbR ADOCK 05000352 1
R-PDR
_