i OPERATIM DATA REPORT DOCKET NO 50-413 DATE Januarv 15. 1996 OPERATIM STATUS COMPLETED BY R.A. Willians
,TELEPHOE 704-382-5346
- 1. Unit Nase Catawba 1 i
- 2. Reporting Period: December 1, 1995-December 31,1995
- 3. Licensed Thernal Power (Mt):
3411 l
- 4. Nameplate Rating (Stoss Me):
1305*
Notes
- Nameplate Rating
)
- 5. Design Electrical Rating (Net We):
!!45 (Bross Me) calculated as
- 6. Maxinus Dependable Capacity (Gross Weh
!!92 1450.000 MVA x.90 power
- 7. Marious Dependable Capacity (Net Me):
!!29 factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last NURE6-0020.
Report. Bive Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
l This Month ' -Yr.-to-Date Cueulative
!!. Hours in Reporting Period 744.0 8760.0 92113.0
- 12. Nueber Of Hours Reactor Was Critical 744.0 7782.1 72293.7
- 13. Reactor Reserve Shutdown Hours
--0--
- - 14. Hours Generator On-Line 744.0 7713.2 71088.7 i
- 15. Unit Reserve Shutdown Hours
- --0--
--0--
- 16. Gross Thersal Energy Generated (M H) 2518601 25806828 231950259
- 17. Bross Electrical Energy Benerated (MH) 907150 9219061 81902811
- 18. Net Electrical Energy Benerated (MWH) 860607 8721627 77045089
- 19. Unit Service Factor 100.0 88.1 77.2
- 20. Unit Availability Factor 100.0 88.1 77.2
- 21. Unit Capacity Factor (Using MDC Ret) 102.5 88.2 73.8 j
- 22. Unit Capacity factor (Using DER Net) 101.0 87.0 73.1
- 23. Unit Forced Outage Rate 0.0 0.5 8.2
- 24. Shutdown Scheduled Oyer Next 6 Months (Type, Date, and Duration of Each):
Refueline - June 01. 1996 - 100 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 9601190175 960115
~
PDR ADOCK 0500 3
R
1 l
OPERATING BATA REPORT DOCKET NO 50-413 j
lfNIT Catauba 1
]
DATE January 15. 1995 COMPLETED BY R.A.ilillines TELEPHONE 704-382-5346 fl0 NTH Decembst. 1995 1
'io E
AVERAGE DAILY POWER LEVEL M
AVERAGE DAILY POWER LEVEL (MWe-NetI (Mile-Net 1 i
!162 17 1140 1
2 1162 18 1130 3
!!62 19 1131 I
4 1160 20 1122 5
!!62
'21 1154 6
!!61 22
!!66 7
1164 23
!!66 8
!!66 24
!!67 9
1165 25
!!66 10 1166 26 1166 11
!!64 27 1165 12
!!63 28
!!66 13 1162 29
!!66 14
!!60 30 1166 15
!!25 31 1164 16 1118
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CKrAwisa 1 DATE v1/id/se REPORT MONTH December 1995 COMPLETED BY
- x. A _. williams TELEPHONE t/usf-362-d346 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent n Sneets For Licensee <
Event Report ( N EG-0161))
(LEP.
C-Refueling 3-Automatic Scram D-Regulato g Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5) erator Error (Explain)
Exhibit I - Same Source G-@her (Explain)
H-Ot
.o
)
DOCKET: 50-413 UNIT: Catawba 1 Date: 01/15/96
. NARRATIVE
SUMMARY
MONTH: December 1995 Catawba Unit I began the month of December operating at 100% full power. The unit operated at or near
. 100% full power for the entire month.
I 1
j 9
Prepared by: R. A. Williams Telephone: (704)- 382-5346
m...
m
.m
- - ~.
MONTHLY REFUFI ING INFORMATION REOUEST i
1 1.
Facility name:
Catawba. Unit 1 i
2.
Scheduled next refueling shutdown: June 1996 f
i l
3.
Scheduled restart following refueling: Sentember 1996 l
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or i
other license amendment?
j If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
l 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
-)
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblics (a) in the core: 191 l-(b) in the spent fuel pool: 16.Q i
j 8.
Present licensed fuel pool capacity: 1111 Size of requested or planned increase: =
l
[
9.
Projected date oflast refueling which can be accommodated by present license capacity:
I Scatomber 2002 i
l l
DUKE POWER COMPANY DATE: January 15.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
i i
1
)
i i
OPERATING DATA REPORT DOCKET NJ 50-414 DATE Januarv 15. 1996 OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346
- 1. Unit Nase: Catawba 2
- 2. Reporting Period: December 1, 1995-December 31,1995
- 3. Licens6d Thereal Pouer (MWt):
3411
- 4. Naseplate Rating (Gross MWe):
1305e Notes eNaseplate Rating
- 5. Design Electrical Rating (Net MWe):
1145 (6 toss MWe) calculated as
- 6. Maxinus Dependable Capacity (Bross MWe b 1192 1450.000 MVA :.90 power
- 7. Mavisus Dependable Capacity (Net MWah
!!29 factor per Page lit, B. If Changes Occur in Capacity Ratings (!tess Nusber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Fower Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If any This Month Yr.-to-Date Cusulative
!!. Hours In Reporting Period 744.0 8760.0 82129.0
- 12. Number Of Hours Reacter Was Critical 744.0 7156.9 64166.2
- 13. Reactor Reserve Shutdown Hours
- - --0--
- 14. Hours Generator On-Line 744.0 7076.3 63137.7
- 13. Unit Resr ve Shutdown Hours -
--0--
--0--
- 16. Gross Thersal Energy Generated (MWH) 2385752 23717655 203416539
- 17. Gross Electrical Energy 6enerated (MWH) 856005 8404987 72104367
- 18. Het Electrical Energy Benerated (MWH1 812499 7946704 67912257
- 19. Unit Service Factor 100.0 80.8 76.9
- 20. Unit Availability Factor 100.0 80.9 76.9
- 21. Unit Capacity Factor (Using MDC Net) 96.7 80.3 73.1
- 22. Unit Capacity Factor (Using DER Net) 95.4 79.2 72.2
- 23. Unit Forced Outage Rate 0.0 9.1 8.9
- 24. Shutdown Scheduled Oyer Next 6 Months (Type, Date, and Duration of Each):
Nem o
- 25. If Shut Down At End Of Repcrt Period. Estinated Date of Startep:
- 26. Units In Test Status (Prior to Consercial Operation):
Forecast Achieved l
1 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
OPERATING DATA REPORT DOCKET N3 50-414 UNIT Catauba 2 DATE Januarv 15. 1995 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH December. 1995 QE AVERAGE DAILY POWER LE'4L RE AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 262 17 1168 2
638 18 1169 3
689 19
!!67 4
911 20 1169 5
1145 21
!!60 6
1147 22
!!69 7
1167 23
!!70 8
1170 24 1170 9
1166 25 1169 10
!!69 26
!!69
!!67 27
!!69 12 1168 2B
!!69 13 1112 29 1169 14
!!62 30 1169 15 1067 31
!!68 16 1160
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME Carantsa z DATE v1/15/36 REPORT MONTH December 1995 COMPLETED BY x.
A.
williams PAGE 1 OF 2 TELEPHONE
( ius ).sts2-d se d (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 6-P 95 1 F
A CG VALVEX VOLUME CONTROL VALVE REPAIRED 7-P 95 1 S
B IA INSTRU POWER ESCALATION TESTING 8-P 95 1 S
B HB VALVEX TURBINE CONTROL VALVE MOVEMENT TESTING 9-P 95 1 S
B IA INSTRU POWER-ESCALATION TESTING 10-P 95 1 F
A HJ PUMPXX
'C' HEATER DRAIN PUMP 11-P 95 2 F
A HH PUMPXX
' REPAIR
'2B' FEEDWATER. PUMP.
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee l C-Refueling 3-Automatic Scram Event Report (NUREG-0161))
(LER D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
...-.a m
.m.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME CATAwesa z DATE ul/id/96 REPORT MONTH December 1995 COMPLETED BY x.
A.
Williarhs PAGE 2 OF 2 TELEPHONE
( v ue ) -3 0z-d3 4 6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 12-P 95 4 S
B HA ZZZZZZ UNIT LOAD TRANSIENT TEST 13-P 95 4 S
B IF INSTRU DELTA T CALIBRATION 14-P 95 4 F
A HA TURBIN HIGH TURBINE BEARING VIBRATION (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scrant EntU Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161) i E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
DOCKET: 50-414 UNIT: Catawba 2 Date: 01/15/96 NARRATIVE
SUMMARY
MONTH: December 1995 Catawba Unit 2 began the month of December operating at approximately 10% full power. The unit decreased power and held at 9% power on 12/01/95 from 0015 to 0023 due to volume control valve repair.
The unit held at 20% power from 0229 to 0243 due to power escalation testing. 'Ihe unit held at 23%
power from 0345 to 0445 due to turbine control valve movement testing. On 12/01/95 from 0748 to 1320 the unit held at 30% power due to power escalation testing. The unit held at 47% power from 1955 to 2238 to place 'C' heater drain pump and '2B' feedwater pump in service. On 12/02/95 from 0601 to 12/03/95 at 1736 the unit held at 56% power to repair '2B' feedwater pump. On 12/04/95 from 0032 to 0348 the unit held due to unit load transient test and from 0925 to 1035 the unit held due to delta T calibration at 75% power. The unit held at 79% power from 1220 to 1340 due to high turbine bearing vibration. The unit returned to 100% full power on 12/07/95 at 0041 and operated at or near 100% full power the remainder of the month.
Prepared by: R. A. Williams Telephone: (7M)- 382 5345
MONTHLY REFUFI ING INFORMATION REOUEST 1.
' Facility name:
Catawba. Unit 2 2.
Scheduled next refueling shutdown: March 1997 3.
Scheduled restart following refueling: Anril 1997
. THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. -
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies -
(a) in the core: 111 (b) in the spent fuel pool: 524 8.
Present licensed fuel pool capacity: J.4.11 Size of requested or planned increase: :--
9.
Projected date oflast refueling which can be accommodated by present license capacity:
Seotember 2011 DUKE POWER COMPANY DATE: Januarv 15.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 I