Proposed Tech Specs Re Change to Refueling Cycles from 18 to 24 Months
ML20096D228
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/08/1991
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20096D226 List:
References
NUDOCS 9205150157
Download: ML20096D228 (5)


Text

.

I I

i ATTACHMENT 2 LIMERICK GENERATING STI. TION Docket Nos.

50-352 50-353 License Nor NP"-39 5.H -8 5 PROPOSED TECHNICAL SFLCIFICATIONS CHANGES List of Attached Pages Unit 1 3/4 3-72 3/4 4-7 Unit 2 3/4 3-72 3/4 4-7 9205:50157 910508 PDR ADOCK 05000352 P

PDR

4 TABLE 4.3.7.2-1 (Continued)

SEISMIC MONITORING INSTRUMENTATION SURVE!LLANCE REOUIREMEN!',

CHANNEL CHANNEL FUNCTIONAL CHANNEL INSTRUMENTS AND SENSOR LOCATIONS CHECK TEST CAllBRATION c.

Triaxial Seismic Trigger (S/T) 1)

XSH-VA-001 (Activates N.A.

SA R

ltems 1.b.1) thru 5) above) 2.

Triaxial Peak Recording Accelerograph (P/A's) l a.

XP-VA-151 Reactor Equipment N.A N.A.

(Top of reactor vessel head) b.

XR-VA-152 Reactor Piping N.A.

N.A.

R (Mn. Stm. Line

'0,' El 313',

in containment) c.

XR-VA-153 Reactor Equipment N.A.

N.A.

R Outside Containment (RHR Heat Exchanger, Loc. 203-Rif-201) 3.

Triaxial Seismic Switches a.

XSHH-VA-001 Primary Containment N.A.

SA R

Foundation (Loc. 118-R16-177) 4.

Triaxial Response Spectrum Analyzer N.A.

SA R

(RSA)

  • The calibration frequency for this instrument is once per 24 months.

LIMERICK - UNIT 1 3/4 3-72

REACTOR COOLANT SYSTEM 3/4.4.'2 SAFETY / RELIEF VALVES LIMITING CONDITION FOR OPERATION 3.4.2 The safety valve function of at least 11 of the following reactor coolant system safety / relief valves shall be OPERABLE with the specified code safety valve function lift settings:*#

4 safety / relief valves 1130 psig 11%

5 safety / relief valves 1140 psig 11%

5 safety / relief valves 1150 psig +1%

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a.

With the safety valve function of one or more of the above required safety / relief valves inoperable, be in at least HOT SHUTOOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

Withoneormoresafety/reliefvalvesstuckopeg,providedthatsuppression pool average water temperature is less than 105 F, close the stuck open safety /reliefvalve(s);ifunabletoclosethestuckopenvalvefs',within2 minutes or if suppression pool average water temperature is 110 F or greater, place the reactor mode switch in the Sr.utdown position.

c.

With one or more safety / relief valve acoustic monitors inoperable, restore the inoperable acoustic monitors to OPERABLE status within 7 days or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.2.1 The acoustic monito for each safety / relief valve shall be demonstrated OPERABLE with the setpoint verified to be 0.20 of the full open noise level ## by performance of a:

a.

CHANNEL FUNCTIONAL TEST at least once per 31 days, and a b.

CHANNEL CALIBRATION at least once per 18 months **.

4.4.2.2 At least 1/2 of the safety relief valves shall be removed, set pressure tested and reinstalled or replaced with spares that have been previously set pressure tested and stored in accordance with manufacturer's recommendations at least once per 24 months, and l

they shall be rotated such that all 14 safety relie" valves are removd, set pressure tested and reinstalled or replaced with spares that have been previously set pressure tested and stored in accordance with manufacturer's recommendations at least once per 54 l

months.

The lift setting pressure shall correspond to ambient conditions of the valves at nominal operating temperatures and pressures.

The provisions of Specification 4.0.4 are not applicable provided the Surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test.

Up to 2 inoperable valves may be replaced with spare OPERABLE valves with lower setpoints until the next refueling.

fnitial setting shall be in accordance with the manufacturer's recommendation. Adjustment to the valve full open noise level shall be accomplished during the startup test program.

LIMERICK - UNIT 1 3/4 4-7

{

TABLE-4.3.7.2d (Continued)

y. e SEISMI'C-MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS 1

CHANNEL

-CHAPNEL FUNCTIONAL CHANNEL-INSTRUMENTS AND SENSOR _ LOCATIONS CHECK TEST CALIBRATION

c. -

TriaxialSeismicTrigger(S/T) 1)

XSH-VA-001 (Activates N.A.

SA R

Items-1.b.1) thru 5) above) 2.

Triaxial Peak Recording Accelerograph (P/A's) a.

XR-VA-151 Reactor Equipment N.A.

N.A.

l (Top of reactor; vessel head)

~=

XR-VA-152 Reactor Piping N.A.

N.A.

R b.

(Mn..Stm. Line

'O,' El 313',

in containment)-

c.

XR-VA-153_ Reactor Equipment N.A.

N.A.

R Outside Containment (RHR Heat Exchanger, Loc. 203-R15-201) 3.

Triaxial Seismic Switches a.

XSHH-VA-001 Primary Containment N.A.

SA R

Foundation (Loc.118-R16-177)

- 4.

Triaxial Response' Spectrum Analyzer H.A.

SA R

. -(RSA).

~

  • -The calibration-frequency for this instrument is once per 24 months.-

r-LIHERICK-- UNIT 2

-3/4 1-72

m R'EACT'OR COOLANT-SYSTEM 7/4.'4 2 SAFETY / RELIEF VALVES LIMITING CONDITION FOR OPERATION 3.4.2 The safety valve function-of at least 11 of the following reactor coolant system safety / relief valves shall be OPERABLE with the specified code-safety valve function lift settings:*#

4 safety / relief-valves 1130 psig 1 %-

1 5 safety / relief valves 1140 psig 11%

5 safety / relief valves 1150 psig 11%

APPLICABILITY:

-OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION: _-

a.-

With the safety valve function of one or more of the above required safety / relief valves inoperable, be in'at least HOT SHUT 00WN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTOOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.-

Withoneormoresafety/reliefvalvesstuckopeg,providedthatsuppression pool average water-temperature is less than 105 F, close the stuck open safety /reliefvalve(s);ifunabletoclosethestuckopenvalvefs)within2 minutes or if suppression pool average water temperature is 110 F or greater, place the reactor mode switch in the Shutdown position.

c.

With one or.more safety / relief valve acoustic monitors inoperable, restore the inoperable acoustic monitors to OPERABLE status within 7 days or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following

-24 hours.

. SURVEILLANCE REQUIREMENTS l

4.4.2.1 'The. acoustic monitor for each safety / relief valve shall be demonstrated OPERABLE

'with the setpoint-verified to be 0.20 of the full open noise level ## by performance of a:

1 a.

CHANNEL FUNCTIONAL TEST at least once per 31 days, and a l

b.

CHANNEL CAu BRATION at-least once per 18 months **.

4.4.2.2 At least 1/2 of the safety relief valves shall be removed, set pressure tested and reinstalled or replaced with spares that have been previously set pressure tested and stored in accordance with manufacturer's recommendations at least once per 24 months, and l'

.they shall be rotated such.that all 14 safety relief valves are_ removed, set pressure

' tested and reinstalled or replaced with spares that have been previously set pressure L

tested and stored in accordance with manufacturer's recommendations at least once per 54 l

.i l: -months.

The lift setting pressure shall correspond to ambient conditions of the valves at nominal operating _ temperatures and pressures.

The provisions of Specification 4.0.4 are not applicable provided the l

Surveillance-is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is l

adequate to perform the test.

Up to 2 inoperable valves may be replaced with snara OPERABLE valves with lower setpoints until the next refueling.

Initial setting shall be in accordance with the manufacturer's recommendation.

Adjustment to the valve full open noise level shall_be accomplished during the startup test program.