f!E?
Southem Califomia Edison Company P. O. DOX 128 SAN CLEMENTE, CALIFORNIA 92674-0128 January ll' l996 WALTER C MARSH TN BAANAOLR OF NUCLE AR REGULATORY AFFAIRS (714) 368 7601 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.
20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Thirteenth Edition of the Integrated Implementation Schedule (IIS)
San Onofre Nuclear Generating Station Units 2 and 3
Reference:
Letter from W. C. Marsh (SCE) to Document Control Desk (NRC),
dated July 17, 1995; Twelfth Edition of the Integrated Implementation Schedule (IIS).
Enclosures 1 and 2 provide the Thirteenth Edition of the Integrated Implementation Schedule (IIS) for the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3. updates the Schedule A, B, and C projects listed in the Twelfth Edition of the IIS (referenced) for SONGS 2 and 3. provides the current Schedule A, B, and C projects for SONGS 2 and 3 for Cycles 8 and 9.
There are no ongoing evaluations of major issues for SONGS 2 and 3.
The Westinghouse Analytical Ranking Program (WARP) was not used to rank the relative safety significance of each Schedule A and B modification because their implementation schedules have been established in separate correspondence.
If you have any questions on the Thirteenth Edition of the San Onofre Units 2 and 3 IIS, please let me know.
Very truly yours, deep' Enclosures cc:
L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 H. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 960Y1705/3960111
^
PDR ADOCK 05000361 00 P
w I
l 1
1 1
l l
ENCLOSURE 1 SCIIEDULE A, B, AND C UPDATES (12th Edition IIS dated 07/17/95)
i 4
j e.
t i
! - 12th Edition IIS 1
t j
Schedule Updates 1i Schedule A Updates 1
l Update Unit Due Date DCP Desenptum Commente l
Number I
l
-m I
No Change C
2/29/96 7044 Vehicle Security Barriers Rule change affecting 10 CTR 73 j
Schedule B Updates I
Update Unis Due Date DCP Desenprku Commens q
Number us
-mmmmmmmmmmmmmmm-mmmmmmmmme i
complete 3
Cycle 8 2005.00 In-containment Post Accident Monitoring Instrumentation improvements
}
Complete 3
Cycle 8 6910 Upgrade Target Rock Solenoid Generic Letter 91-15 Valves a
q Complete 3
Cycle 8 6988 Addition of Valves and Drains Generic Letter 8944 for In-Service Test i
l i
.d 1
b i
. Schedule C Updates Update Unit Due Date DCP Descriptkm j
Number 6
m Complete 2
Cycle 8 6869 Auxiliary Feedwater Overspeed Trip Setpoint No Change 2
Cycle 9 6683.04 Snubber Reduction Complete 2
Cycle 8 6735.03 Ladders and Pistforms Complete 2
Cycle 8 6851.00 Replace Loose Parta and Vibration Monitoring System Complete 2
Cycle 8 6855.00 install Removable Digital Polar Crane Controla Complete 2
Cycle 8 6864.00 Install Removable Refueling Machine Controls No Change 2
Cycle 9 6876 00 Containment Purge and Plant Vent Stack Radiation Monitor Complete 2
Cycle 8 6885.00 Replace Turbine Plant Secondary System Chemistry Instrumentation From Cycle 8 2
Cycle 8 6946.00 Automatic Voltage Regulator Replacement to Cycle 9 No Change 2
Cycle 9 6990.00 Reactor Coolant Pump Design Changes No Change C
Cycle 8 6933.00 Toxic Gas isolation System Instrument Replacement Complete C
Cycle 8 7032.00 Replace HP1000 Computer and Meteorological Equipment Enclosure Delete C
Cycle 8 7041 800 Mih Cabinet Replacement Complete C
Cycle 8 2071 Instrument Air Modifications Complete 3
Cycle 8 6605.08 Control Room iluman Factors Complete 3
Cycle 8 6869 Auxiliary Feedwater Overspeed Trip Setpoint Complete 3
Cycle B 2012.00 F020 Filter Replacement Complete 3
Cycle 8 2061.00 Component Cooling Water Fuses Complete 3
Cycle 8 2063.00 Steam Generator Distribution Box Replacement
+
).
4 Schedule C Updates Update Unit Due Date DCP Desenpam Number I
Complete 3
Cycle 8 2067.00 Main Steam isolation Valve Bypasa Line Modification From Cycle 8 3
Cycle 8 6683.04 Snubber Reduction to Cycle 9 Complete 3
Cycle 8 6735.03 Ladders and Platforma Complete 3
Cycle 8 6851.00 Replace loose Parta and Vibration Monitoring System Complete 3
Cycle 8 6855.00 Install Removable Digital Polar Crane Controla Complete 3
Cycle 8 6864.00 Install Removable Refueling Machine Controls j
No Change 3
Cycle 9 6876.00 Containment Purge and Plant Vent Stack Radiation Monitor Complete 3
Cycle 8 6885.00 Replace Turbine Plant Secondary System Chenustry Instrumentation Complete 3
Cycle 8 6914.00 Turbine Governor Valve Modifications From Cycle 8 3
Cycle 8 6946.00 Automatic Voltage Regulator Replacement to Cycle 9 Complete 3
Cycle 8 6974.00 lead Center Transformer Replacement Complete 3
Cycle 8 6984.00 Ex-core Neutron Detectors From Cycle 8 3
Cycle 8 6990.00 Reactor Coolant Pump Design Changes to Cycle 9 No Change 2
Cycle 9 2057.00 Repair Amertrap Vault No Change 2
Cycle 9 2064.00 Modify H. P. Turbine No Change 2
Cycle 9 6683.05 Snubber Reduction - Phase VI No Change 2
Cycle 9 6926.00 Replace Nuclear Monitoring Corporation Radiation Monitors No Change 3
Cycle 9 2057.00 Repair Amertap Vault
1
-4 i
1 l
}
4 i
l Schedule C Updates
}
J Update Unit Due Dese DCP Desenptine Number l
1 i
ammunummu--
a i
No Change 3
Cycle 9 2064.00 Modify H. P. Turbine l
j No Change 3
Cycle 9 6683.05 Snubber Reduction - Phase VI l
No Change 3
Cycle 9 6926.00 Replace Nuclear Monitoring Corporation Radiation Monitors i
i t
t i
i 4
)
4 l
2 1
3 i
i i
4 1
I I
i i
(
i 1
4 d
l O
4 g,
ENCLOSURE 2 THIRTEENTII EDITION IIS (SONGS 2 AND 3) l
SONGS 2 & 3 Integrated Implementation Schedule Thirteenth Edition Schedule A Unit Due Dese DCP Number Desenptka C-MM C
2/29/96 7044 Vehicle Security Barriers Rule change effecting 10 CFR 73 Schedule B Unit Ibeription 2
There are no Schedule B items identified at this tirne 3
There are no Schedule B itenis identi6ed at this time
1
.- I Schedule C 1
Unit Due Date DCP Number Desenption m
C Cycle 8 6933.00 Toxic Gas laolation System Instrument Replacement 2
Cycle 9 2057.00 Repair Amertap Vault 2
Cycle 9 2064.00 MMify H. P. Turbine 2
Cycle 9 6683.04 Snubber Reduction 2
Cycle 9 6683.05 Snubber Reduction - Phase VI 2
Cycle 9 6876.00 Containment Purge and Plant Vent Stack Radiation Monitor 2
Cycle 9 6926.00 Replace Nuclear Monitoring Corporation Radiation Monitors 2
Cycle 9 6946.00 Automatic Voltage Regulator Replacement 2
Cycle 9 6990.00 Reactor Coolant Pump Design Changea 3
Cycle 9 2057.00 Repair Amertap Vault 3
Cycle 9 2064.00 Modify H. P. Turbine 3
Cycle 9 6876.00 Containment Purge and Plant Vent Stack Radiation Monitor 3
Cycle 9 6683.04 Snubber Reduction 3
Cycle 9 6683.05 Snubber Reduction - Mase VI 3
Cycle 9 6926.00 Replace Nuclear Monitanng Corporation Radiation Monitors 3
Cycle 9 6946.00 Automatic Voltage Regulator Replacement 3
Cycle 9 6990.00 Reactor Coolant Pump Design Changes