ML20096B667

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to RXE-95-002, CPSES Unit 1 Cycle 5 COLR & Rev 1 to RXE-94-004, CPSES Unit 2 Cycle 2 Colr
ML20096B667
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/11/1996
From: Terry C, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096B669 List:
References
TXX-96011, NUDOCS 9601160368
Download: ML20096B667 (1)


Text

-

l l

M Log # TXX 96011

==

File # 10010

~

l 916 (COLR)

Ref. # 10CFR50.36 l

1UELECTRIC January 11, 1996 C. Lance Terry Gnmp Mce President U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i DOCKET NOS. 50-445 AND 50 446 i

REVISED CORE OPERATING LIMITS REPORTS FOR UNIT 1, CYCLE 5 AND UNIT 2, CYCLE 2 Gentlemen:

l Enclosed are the revised Core Operating Limits Reports for Unit 1, Cycle 5 and Unit 2. Cycle 2, prepared and submitted pursuant to Technical Specification 6.9.1.6.

Sincerely, C. L. Terry

)

By:

D. R. Woodlan Docket Licensing Manager JDS/grp Enclosures cc:

Mr. L. J. Callan, Region IV Mr. W. D. Johnson, Region IV Mr. T. J. Polich, NRR Resident Inspectors 9601160368 960111 PDR ADOCK 05000445 P

PDR j

160093 i

MM Energy Plaza 1601 Bryan Street Dallas. Texas 75201-3411

'\\u