Ja Southern Nuclear Operating Company a
Post Offics Box 1295 B' mingham, Alabama 35201 w
Te'ephone (205) 868 5131
~
Southem Nudear Operating Company o.v. uor.y Vice President I
Farley Project the Southem eleCf9C System l
Deiember 21, 1995 e
Docket Nos.: 50-346 10 CFR 50.4 50-364 U. S. Nuclear Regulatoiy Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Resolution of Seismic Outliers Ladies and Gentlemen:
E By letter dated May 18,1995, Southern Nuclear provided the results of the seismic evaluation performed for Farley Nuclear Plant (FNP) in response to Generic Letter 87-02,
" Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46." By letter dated June 28,1995, Southern Nuclear provided the FNP response to GL 88-20 Supplement 4, " Individual Plant j
Examination for External Events for Severe Accident Vulnerabilities." These letters stated i
the Southern Nuclear intent to resolve certain outliers with regard to the seismic evaluation criteria by December 31,1995. Resolution of these outliers is nearing completion.
]
However, Southern Nuclear has determined that three items that were initially considered for resolution by year-end will not be completed. These items all involve improvements to equipment anchorage and are identified as follows:
l 1.
QSH21ES25-A Diesel Generator 1-2A Local Control Panel 2.
QSH22L502-A Diesel Generator 1-2A Relay Panel 3.
Q2R36A502-B 4 kV Switchgear 2L Surge Arrestor Items 1 and 2 will be coordinated with the next scheduled diesel generator outage and will be completed by April 1,1996. Item 3 is scheduled to be performed during the next i
refueling outage for Unit 2 (Fall 1996).
j i
I
)
o -m e n
~ 9512270154 951221 ff g g A
PDR ADOCK 05000348
. R... _.. _ _... _ _
.PDR -
O
,(
.3 U. S. Nuclear Regulatory Commission
. Page 2 If you have any questions, please advise.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY (YY llicru Dave Morey DPH/ cit:resoseis. doc cc: Mr. S. D. Ebneter, Region II Administrator Mr. B. L. Siegel, NRR Senior Project Manager Mr. T. M. Ross, Plant Resident Inspector
.