ML20095B884

From kanterella
Jump to navigation Jump to search
Forwards TMI-1 Cycle 11 COLR, Revs 0 & 1
ML20095B884
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/06/1995
From: James Knubel
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095B886 List:
References
C311-95-2441, NUDOCS 9512110252
Download: ML20095B884 (1)


Text

!

GPU Nucteer Corporation N

Mr Post Office Box 388 Route 9 South Forked River. New Jersey 08731-0388 609 971 4000 Writer's Direct Dial Nurnber:

December 06, 1995 C311-95-2441 U. S. Nuclear Regulatory Commission Atter. tion: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Three Mile Island Nuclear Generating Station, Unit 1 (TMI-1)

Operating. License No. DPR-50 Docket No. 50-289 Cycle 11 Core Operating Limits Report, Revision 0 and Revision 1 Pursuant to TMI-l Technical Specification Section 6.9.5.4, enclosed are copies of the Cycle 11 Core Operating Limits Report (COLR), Revision 0 and Revision 1. The Cycle 11 COLR Revision 0, contains the limits developed to support Cycle 11 startup, and several of the operating limits were only established to 75 Effective Full Power Days (EFPD) of operation.

The Cycle 11 COLR, Revision 1, provides the cycle-speci0c limits established to support operation to the end of Cycle 11. The cycle-specific core operating limits contained in these reports have been determined in accordance with Technical Specification 6.9.5.

If additional information is required, please contact us.

Sincerely, o

J. Knubel i

Vice President and Director, TMI-l DJD/ pip

Enclosures:

i

1) TMI-l Cycle 11 Core Operating Limits Report, Topical Report 101, Revision 0
2) TMI-l Cycle 11 Core Operating Limits Report, Topical Report 101, Revision 1 i

c: Region I, Administrator TMI-l Senior Resident inspector

- 9M2dO252 9M206

~

TMI-l Senior Project Manager PDR ADOCK 05000289

_ P.

PDR_,..,

g0l\\

t 10110 GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation( $