ML20090F513

From kanterella
Jump to navigation Jump to search
Advises That Draft Unit 1 Tech Specs Accurately Reflect as-built Plant & FSAR
ML20090F513
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/17/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8407230133
Download: ML20090F513 (3)


Text

. 9 O

Dmcu POWER Goxiwxy P.O. HOx 33180 CHAMLOTTE, N.C. 28242 IIAL H. TUCKEH Ten.epuose

.Z.","~1.

July 17, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

In response to Mr. T. M. Novak's letter of May 25, 1984 which transmitted the

" Draft"-Catawba Unit 1 Technical Specifications, Duke certified in my July 3, 1984 letter that the specifications as revised by your letters of June 8 and 22, 1984 accurately reflected the as-built plant. A subsequent letter dated July 17,.1984 transmitted a number of revised specifications.

Based on the extensive preparation and review effort that has gone into the development of the Catawba Unit 1 Technical Specifications, Duke Power Company certifies that, to the best of our knowledge, the " Draft" Catawba Unit 1 Technical Specificatio'ns, as revised by the three referenced letters, accurately reflect the as-built plant and the Catawba FSAR. Furthermore, we are not aware of any conflicts between the " Draft" Catawba Unit 1 Technical Specifications and the NRC staff's SER analyses.

Very truly yours, H. B. Tucker RWO/rbs Attachment cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station 8

f e 0 8407230133 840717 PDR ADOCK 05000

Mr. Harold R. D:nton, Director July 17, 1984 Pagn 2 Mr. Robert Guild, Esq.

Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135} Devine Street Columbia, South Carolina 29205

. Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 4

]

H i

i-4 a

f

'Mr. Harold R. Denton, Director July 17,1984 Pags 2 l

1 I

HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Certification of the Catawba Unit 1 Technical Specifications, and that all statements and matters set forth therein are true and correct to the best of his knowledge.

k Hal B. Tucker, Vice President Subscribed and sworn to before me this 17th day of July, 1984.

L 6 db 1/

Notary Public My Conmission Expires:

Gt,,A M 2o

  1. tV

/

l

.,n m.

y-

,m:

r

.,-v.-