Accordingly, Facility Operating License No. DPR-65 is hereby amended by modifying paragraph 2.C.(3) on page 4 to read as follows:
(3) Fire Protection l
The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report and as approved in the SER dated September 19, 1978, and supplements dated October 21, 1980, November 11, 1981, October 31, 1985, April 15, 1986, January 15, 1987, April 29,1988, July 17,1990, and November 3, 1995, subject to the following provisions.
The licensee may make changes to the approved Fire Protection Program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
The license is also amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 191, are hereby incorporated in the
'l license. The licensee shall operate the facility in accordance with the Technical Specifications.
1 3.
This license amendment is effective as of the date of issuance, to bc implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMISSION Y
i.
hillip F.
Kee, Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Attachments:
- 1. Page 4 of License
- 2. Changes to the Technical Specifications Date of Issuance: November 3, 1995
- Page 4 is attached, for convenience, for the composite license to reflect this change.
Correction Letter: November 24,1995 9511290116 951124 DR ADOCK 0500 6
i
IME LINITING COM ITIONS FOR OPERAT!0N AS $URVEILLANCE REQUIRE E NT3 4
SECTION 28K
)
3/4.2 POWER DISTRIBUTiGN LIMITS 3/4.2.1 LINEAR HEAT RATE.................... 3/42-1 3/4.2.2 Deleted T
3/4.2.3 TOTAL INTEGRATED RADIAL PEAKING FACTOR - F,.
...... 3/42-9 3/4.2.4 AZIMUTHAL POE R TILT
.................. 3/4 2-10 3/4.2.5 Deleted 3/4.2.6 DN8 MARGIN....................... 3/4 2-13 3/4,3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION 3/4 3-1 3/4.3.2 ENGINEERED SAFETY FEATURE ACTUATION SYSTEN INSTRUMENTATION.................... 3/4 3 3/4.3.3 NONITORING INSTRUNENTATION 3/4 3-26 Radiation Monitoring 3/43-26 Incore Detectors 3/43-30 Soismic Instrumentation................. 3/4 3-32 Meteorological Instrumentation 3/4 3-36 Remote Shutdown Instrumentation............. 3/43-39 I
Accident Monitoring................... 3/43-46 Radioactive Liquid Effluent Monitoring Instrumentation 3/4 3-50 Radioactive Gaseous Effluent Monitoring Instrumentation. 3/4 3-56 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 COOLANT LOOPS AND C0OLANT CIRCULATION.......... 3/44-1 Startup and Power Operation............... 3/44-1 Ilot St andby....................... 3/4 4-la Shutdown
........................ 3/4 4-lb Reactor Coolant Pumps - Shutdown 3/4 4-Id MILLSTONE - UNIT 2 V
Amondment No. 75,77,77,77,
- JM. 177. Jf7, 177 191
==
Correction Letter:
November 24,1995 l
i ADNINISTRATIVE C0ffrROLS Meetina Freauenev 4.5.1.4 The PORC shall acct at least once per calender month and as convened by the PORC Chairperson.
Quorum 6.5.1.5 A quorum of the PORC shall consist of the Chairperson, or Vice chairpersen, or Senior Vice President - Millstone Station and four members including alternates.
Rainantibilities 6.5.1.6 The PORC shall be responsible for:
Review of 1 allprocedures,exceptcosmonsiteprocedures, required by) Specification 4.8 and changes thereto, 2) any other a.
proposed procedures or changes thereto as determined by the Nuclear Unit Director to affect nuclear safety.
b.
Review of all proposed tests and experiments that affect nuclear safety.
c.
Review of all proposed changes to Sections 1.0 - 5.0 of these Technical Specifications.
F-d.
Review of all proposed changes or imodifications to plant systems or equipment that affect nuclear safety.
e.
Investigation of all violations of the Technical Specifications and preparation and forwarding of a report covering evaluation and recommendations to prevent recurrence to the Executive Vice President Nuclear and to the Chairperson of the Nuclear Safety Assessment Board, f.
Review of all REPORTABLE EVENTS.
I g.
Review of facility operations to detect potential safety hazards.
h.
Performance of special reviews and investigattuns and reports thereon as requested by the Chairperson of the Nuclear Safety Assessment Board.
1.
Render determinations in writing if any ilus considered under
(
6.5.1.6(a)through(d)above,asappropriateandasprovidedby 10CFR50.59 or 10CFR50.92, constitutes an unrevluwed safely cuestion or requires a significant hazards consideration
<etermination.
j.
Review of the fire protection program and implementing procedure.
Millstone Unit 2 6-6 Amendment No. J7, #p JJ, esas
- 77. JJJ 177 J/J. Jpp Ig1 Correction Letter:
Novenber 24, 1995
s ADNINISTRATIVE CONTROLS
\\
Meetina Frecuency 1
- i 6.5.2.4 The 50RC shall meet at least once per six months and as convened by the 50RC Chairperson.
Duorum 6.5.2.5 A cuorum of the SORC shall censist of the Chairperson or Vice Cha1rperson and five members including alternates.
Rainansih111 ties 6.5.2.6 The $0RC shall be responsible for:
Review of 1) d changes thereto. 2)d t all common site procedures required by specifi-a.
cation 6.8 an any other proposed procedures or changes thereto as e emined by the Senior Vice President - Millstone Station to affect site nuclear safety, b.
Review of all proposed changes to Section 6.0 " Administrative Controls" of these Technical Specifications, c.
Performance of special reviews and investigations and rararts as requested by the~ Chairperson of the Nuclear Safety Assessment Board.
d.
Review of the Plant Security Plan and implementing procedures' ~
and shall submit changes to the Chairperson of the Nuclear Safety Assessment Board.
e.
Review of the Emergency Plan and implementing procedures and 1
shall submit recommended changes to the Chairperson of the Nuclear Safety Assessment Board.
f.
Review of all cosumon site proposed tests and experiments that affect nuclear safety.
9 Review of all cosmon site proposed changes or modifications to systems or equipment that affect nuclear safety.
h.
Render detensinations in writing or meeting minutes if any ites considered under 6.5.2.6(a) through (g)FR50.92, constitutes an above, as appropriate and as provided by 10CFR50.59 or 10C unreviewed safety question or requires a significant hazards consideration determination.
1.
Review of the cosuson site fire protection program and implementing procedures.
Autharity 6.5.2.7 The 50RC shall:
a.
Recossnend to the Senior Vica presidant-Millstona.tation
~
written a> proval or disap) proval in meeting minutes of items considere< under 6.5.2.6(a through (g) above.
Millstone Unit t 6-8 AmendmentNo.pp. 17). 177 17#.
ess:
JM,191 Correction Letter:
November 24, 1995 1
-