UNITED STATES NUCLEAR REGULATORY COMMISSION wnwiwov oN. o. c. rot 56 W1101LILECTRIC COMPANY CAL l,AWAY PLANT. UNIT 1 DOCKET NQJ_iBJ MiDiDBINT 10 FACILITY OfffLATlHG LICENSE Amendment No. 69 License No. NPF-30 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment filed by Union Electric Company (Ut, the licensee) dated November 22, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter It B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Acce dingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of facility Operating License No. NPF-30 is hereby amended to read as follows:
9204010256 920326 PDR ADOCK 05000403 P
i o,
(2) hchnical Specifications and Envir01 rental Protection Plan The Technical Sr.ecifications contained in Appendix A, as revised through Arnendment No. 69, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the license. UE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective immediately to be implemented no later than 30 days from the date of its issuance.
The licensee will imediaticy inform the Commission, in writing, of the implementation date.
FOR Tile NUCLEAR REGULATORY COMMISSION John N. Hannon, Director Project Directorate 111-3 Division of Reactor Projects Ill/IV/V Office of Nu: lear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance: March 26. 1992
A11AUM!iL10_11CitiSEEUfDBufUf0. 09 OfLMllifLLitui1UiOJill-30 D.QELLlf0x3AdB1 Revise Appendix A Technical Specifications b/ removing the pages identified belo and inserting the enclosed pages.
1he revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of ch r ;e.
Corresponding overleaf pages are provided to maintain document er veteness.
RD10E ltiSIBI 3/4 3-19 3/4 3-19 3/4 3-20 3/4 3-20 3/4 7-14 3/4 7-14
l TABLE 3.3-3 (Continuad)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION n
E MINIMUM 5
' TOTAL NO.
CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CWJiNELS TO TRIP OPERABLE MODES ACTION
[
8.
Loss c' Power i
5 a.
4 kV Bus Undervoltage 4/ Bus 2/ Bus 3/ Bus 1, 2, 3, 4 19*
[
-Loss of Voltage b.
4 kV Bus Undervoltagt 4/ Bus 2/ Bus 3/ Bus 1, 2, 3, 4 19*
-Grid Degraded Voltage l
9.
Control Room Isolation
'a.
Manual Initiation 2
1 2
All 26****
l b.
Automatic Actuation 2
1 2
1, 2, 3, 4 26 M
Logic and Actuation
[
Relays (SSPS) 3 i
c.
Automatic Actuation Logic 2
1 2
All 26****
l and Actuation Relays l
Phase "A" Isolation See Item 3.a above for all Phase "A" Isolation initiating functions and requirements.
i 10.
Solid-State Load Sequencer 2-1/ Train 1/ Train 2-1/ Train I, 2, 3, 4 25 3I 11.
Egnineered Safety Features y
Actuation System Interlocks E
a.
Pressurizer Pressure, 3
2 2
1,2,3 20 g
P-ll-g b.
Reactor Trip, P-4 4-2/ Train 2/ Train 2/ Train 1, 2, 3 22 i
k
i l
T_ABLE 3.3 3 (Continued)
TABLE NOTATION
- Trip function may be blocked in this MODE below the P-ll (Pressurizer Pressure Interlock) Setpoint.
HTrip function automatically blocked above P-il and may be blocked below P il when Safety injection on low steam line pressure is not blocked.
hkirip function may be blocked just before shutdown of the last operating main feedwater pump and restored just after the first main feedwater pump is pu~t into service (following its startup trip test).
- Tb. orovisions of Specification 3.0.4 are not applicable.
- 0ne in separation Group 1 and one in Separation Group 4.
- The de-energization of one trsin of BOP-ESFAS actuation logic and actua.
i tion relay renders two of the four channels inoperable.
Action Statement 21 applies to both Functional Units 6.c and 6 9 in this case.
l
- The provisions of Specification 3.0.4 are not applicable in MODES 5 and 6.
l ACTION STATEMENTS ACTION 14 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveil-lance testing per Specification 4.3.2.1, provided the other channel i
is OPERABLE.
ACTION 15 - With the number of OPERABLE channels one less than the Total Number of Channels,, operation may proceed until performance of the next required ANAL 00 CHANNEL OPERATIONAL TESI provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
ACTION 16 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypass condition and the Mini.num Channels OPERABLE requirement is met.
One additional channel may be bypassed for up
- to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing-per Specification 4.3.2.1.
ACTION 17 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge supply and exhaust valves are maintained closed.
ACTION 18 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> $nd in_ COLD SHUTDOWN within the following
-30 hours.
ACTION 19'- With the number of OPERABLE channels one less than the Total Number of Channels STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
a.
The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and CALLAWAY - UNIT 1 3/4 3-20 Amendment No. 26,ff,69 a--wwer ye-Ng---w+,
w
-e-u--r&+yemw e-s,+pe-ergg M Mreg y r vi-sT Tr g u t -dew'*M-vtr94-y9 yy-g WW e' p vrmgei,yet -y w ww ww y 7 -_.
ggermy p-w gwya g r y+ m f ru w-wen p sme-iggy--
e--y, wtWSet-?
tt-
+w w ww d
-e e
s
e a
Pl. ANT $Y$1[M5 3/4.7.5 ULTIKAT[ HE A1 SINK LIMITING CONDITION FOP, OP[RAtl0N 3.7.5 The ultimate heat sink (VHS) shall be OPERABLE with:
a.
A minimum water level at or above 13.25 feet (El 831.2.6 feet MSL) from the bottom of the UH5.
b.
An average water temperature of less than or equal to 90'F. and C.
Two UHS cooling tower trains (2 cells per train).
APPLICAB!LITY: MODI $ 1, 2. 3 and 4.
ACTION:
a.
With the VHS inoperable as a result of level or temperature, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD
$HUTDOWN within the following 30 hocrs. -
b.
With one UHS cooling tower train inoperable, restore both trains i
to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHLfiDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURytllL ANCE REQUIR[MENTS
- 4. 7. 5.1 The UHS shall be detemined OPERABLE at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the average water temperature and water level to be within their limits.
4.7.5.2 The UHS cooling tower trains shall be demonstrated OPERABLE at least once per 31 days by verifying that each cooling toner fan operates for at least 15 minutes in both the slow and fast mode and at least once per 18 months by visually inspecting and verifying no abnomal breakage or degradation of the fill materials.
4.7.5.3 The UHS shall be detemined OPERABLE at least once per 31 days by visually inspecting the VHS riprap for any abnomal degradation which might lead to blockage of the tsW pump suction.
CALLAWAY - UNIT 1 3/4 7-13
/cendment No. 2.5 t
PtANT SY$1(MS 3/4.7.6 CONTROL ROOM EMERGINCY VENTILATION $Y$1EM LIMlflNG CONDITION FOR OPERATION 3.7.6 Twn independent Control Room En,ergency Ventilation Systems shall be OPERABLE.
i e I APPLICABILITY:
All HODES.*
i ACT10N:
I
- MODES 1, 2, 3 and 4:
With one Control Room Emergency Ventilation System inoperable, restore the inoperable system to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHU100WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
l MODES 5 and 6:
a.
With one Control Room Emergency Ventilation System inoperable.
restore the inoperable system to OPERABLE status within 7 days or initiate and maintain operation of the remaining OPERABLE Control Room Emergency Ventilation System in the recirculation mode.
b.
With both Control Room Emergency $ntilation Systems inoperable, or with the OPERABLE Control Room Emergency Ventilation System, required to be in the recirculation mode by ACTION a., not capable of being powered _by an OPERABLE emergency power source, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.
5URVEILLANCE REQUIREMENTS 4
4.7.6 Esch Control Room Emergency Ventilation System shall be demonstrated OP!RABLE:
a.,
At least once per 12 hors 1
- verifying that the control room air temperature is less than or equal to 84'F; b.
At least once per 31 days on a STAGGERED TEST BAS!$ by initiating, f rom the control room, flow through the "lPA filters and charcoal adsorbers of_both the filtration and Pressurization Systems and verifying that the Pressurization System operates for at least 10 continuous hours with the heaters operating;
^ The provisions of Specification 3.0.4 are not appliccble in MODES 5 and 6.
1-CALLAWAY
- UNil 1 3/4 7 14 Amendment No. 69
,-v,---
-,--rw,,+w,,,-y.,ww--
,,-y-
- +wy,,,,,,rw-wy--
w w w r e- = =r-y--v c-w,i,--,
ww v.wa---we v & wey-v w a=,vwww,-,-%,
v.-wy+w,--
, w w ww y, w+v vv - w
- w w--
www w e,*.v,v-e- v
-r ew