NRC MONTHLY OPERATIN3 REPORT SAN ONOFRE NUCLEAR GENERATIN3 tiTATION, UNIT 2 ,
NT4 DOCKET NO: 50-361 EUr UNIT NAME: SONGS - 2 -
DATE: November 15, 1995 3- COMPLETED BY:-C. E. Williams y TELEPHONE: (714) 368-6707
- no OPERATING STATUS O4
$ 1. Unit Name: San Onofre Nuclear Generating Station, Unit 2 g 2. Reporting Period: October 1995 cua 3. Licensed Thermal Power (MWt): 3390 M, 4. Nameplate Rating (Gross MWe): 1127 ,
- 5. Design Electrical Rating (Net MWe): 1070 '
- 6. Maximum Dependable Capacity (Gross MWe): 1127 '
- 7. Maximum Dependable Capacity (Net MWe): 1070
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: NA
- 9. Power Level To Which Restricted, If Any (Net Mwe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.00 7,296.00 106,993.00
- 12. Number Of Hours Reactor Was Critical 745.00 5,330.40 82,104.99 ;
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 745.00 4,768.32 80,399.66
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 2,440,983.00 15,459,559.00 262,837,414.85 i
- 17. Gross Electrical Energy Generated (MWH) 851,988.00 5,237,318.00 89,088,817.50
- 18. Net Electrical Energy Generated (MWH) 811,820.00 4,942,468.04 84,506,562.91
- 19. Unit Jervice Factor 100.00% 65.36% 75.14%
- 20. Unit Availability Factor 100.00% 65.36% 75.14%
- 21. Unit Capacity Factor (Using MDC Net) 101.84% 63.31% 73.82% i
- 22. Unit Capacity Factor (Using DER Net) 101.84% 63.31% 73.82% ,
- 23. Unit Forced Outage Rate 0.00% 1.82% 5.29% i
- 24. Shutdowns Scheduled over Next 6 Months (Type,-Date, and Duration of Each)-
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved ,
INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA ,
COtedERCIAL OPERATION NA NA 1 ,
t
. _ . . . _ ..- _ ._ . -_ ... _ _ . _ _._._ _ __. __. . _ . . _ . _ _ _ _ . . , _ . . m. _ . ._. ,,
f l
. AVERAGE-DAILY UNIT POWER LEVEL I i
, DOCKET NO: 50-361 i
, UNIT NAME: SONGS - 2 !
DATE: November 15, 1995 COMPLETED BY: -C. E. Williams ~"
TELEPHONE: (714) 368-6707 l
j MONTH: October 1995 .!
)
. DAY. AVERAGE. DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net)- (MWe-Net) !
1 1134.63 16 1103.50
'2 1091.25 17 1101.46 ;
)
3 1082.08 18 1101.46 ;
l 4 1086.33- 19 1099.25 j 15 1088.67 20 1098.71 i I
6 1088.13 21 1097.50 j l
7 1089.33 22 1097.29' j i
8 1091.17 23 1096.25 l 1
9 1095.92 24 1091.83 10 1095.46 25- 901.83 I
\
l 11 1097.46 26 1097.33- 1 i
12 1095.71 27 1100.96
?-
13 1096.29 28 1101.33 l
L 14 1098.79 29 1056.32 15 1100.08 30 1102.13 31 1103.38 l
l r
I 2
\
UNIT CHUTDONN3 AND POWER REDUCTION 3- DOCKET NO: 50-361 UNIT NAME: SONGS - 2
- REPORT. MONTH: October 1995 DATE: November 15, 1995 -
COMPLETED BY: C. E. Williams ,
TELEPHONE: (714) 368-6707 Method of Shutting Cause & Corrective Duration Down LER ' System Component Action to No. Date Type l (Hours) Reason 2 Reactor No. Code' Code 5 Prevent Recurrence i i
.There were no unit shutdowns or reductions in the Average Daily Power Level of more than 20% this reporting period. r i
l t
2 F-Forced 2 Reason: ' Method : "IEEE Std 805-1984 >
S-Scheduled A-Equipment Failure - (Explain) 1-Manual +
B-Maintenance or Test 2-Manual Scram. S IEEE Std 803A-1983 C-Refueling .3-Automatic Scram. l D-Regulatory Restriction '4-Continuation from E-Operator Training & License Examination Previous Month ;
F-Administrative 5-Reduction in~the Average ,
'G-Operational Error-(Explain) Daily Power Level ~of more i H-Other (Explain) than 20% from the previous day 6-Other (Explain) j i
t I
-[
c 3
. . y. _ _ -_ - . . - .
I
- ' . SUletARY OF OPERATING EXPERIENCE FOR THE MONTH {
I DOCKET NO: 50-361
- UNIT NAME: SONGS - 2 j DATE: November 15, 1995 ,
COMPLETED BY: C. E. Williams TELEPHONE: (714) 368-6707-l Date Time Event l L October- 01 0001 Unit is in Mode 1, 99.9% power, 1140 MWe. l l October 03 1610 Reactor power reduced to 97.2%, 1110 MWe, due i to circulating water 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> average delta ;
temperature of 20.4 degrees F. i l
October. 04 0600 Reactor power returned to 100% power,.1140 MWe.
l October 24 2355 Commenced lowering reactor power in preparation i for heat treatment of the circulating water system intake structure.
October 25 0305 Reactor power is at 81%, 890 MWe. i l
1050 Completed heat treatment of circulating system, '
commenced raising reactor power.
2130 Reactor power returned to 100%, 1154 Mwe.
October 29 0200 All' clocks adjusted back 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to conform to Pacific Standard Time.
October 31 2400 Unit is in Mode 1, 100% power, 1153 MWe.
1 1
4
. REPUELING INPDRMATION DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE: November 15, 1995 COMPLETED BY: C. E. Williams TELEPHONE: (714) 368-6707 1
-MONTH: October 1995 1
- 1. Scheduled date for next refueling shutdown. l Cycle 9 refueling outage is forecast for November 1996.
- 2. Scheduled date for restart following refueling.
Restart from Cycle 9 refueling outage is forecast for January 1997.
- 3. Will refueling or resumption of operation thereafter require a l Technical Specification change or other. license amendment? l i
Unknown at this time.
What will these be? ;
Unknown at this time.
]
- 4. : Scheduled date for submitting proposed licensing action and supporting I information. l Unknown at this time. l
- 5. Important licensing considerations associated with refueling, e.g. new l or different-fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Unknown at this time.
5
l REFUELING INFORMATION DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE: November 15, 1995 ;
COMPLETED BY: C. E. Williams I TELEPHONE: (714) 368-6707
- 6. The number of fuel assemblies.
A. In the core. 217 i
B. Ist the spent fuel storage pool. 770 Total Fuel Assemblies 700 Unit 2 Spent Fuel Assemblies 0 Unit 2 New Fuel Assemblies 70 Unit 1 Spent Fuel Assemblies C. In the New Fuel Storage Racks Zero Unit 2 New Fuel Assemblies
- 7. Licensed spent fuel storage capacity. 1542 1
Intended change in spent fuel storage capacity. None l
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 2005 (full off-load capability) ;
i I
6
NRC MONTHLY CPERATING REPORT SAN ONOFRE NUCLEAR GENERATING ETATION, UNIT 3 DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: November 15, 1995' COMPLETED BY: C. E. Williams TELEPHONE: (714) 368-6707 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generating Station, Unit 3
- 2. Reporting Period: October 1995
- 3. Licensed Thermal Power (MWt) : 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rating (Net MWe): 1080
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): 1080
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.00 7,296.00 101,544.00
- 12. Number Of Hours Reactor Was Critical 745.00 5,786.25 80,472.70
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 745.00 5,712.15 78,755.64
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Ger.erated (MWH) 2,522,349.10 18,469,487.41 253,617,533.40
- 17. Gross Electrical Energi Generated (MWH) 848,048.50 6,249,893.00 86,082,569.50
- 18. Net Electrical Energy Generated (MWH) 804,523.00 5,906,347.63 81,347,258.56
- 19. Unit Service Factor 100.00% 78.29% 77.56%
- 20. Unit Availability Factor 100.00% 78.29% -77.56%
- 21. Unit Capacity Factor (Using MDC Net) 99.99% 74.96% 74.18%
- 22. Unit Capacity Factor (Using DER Net) 99.99% 74.96% 74.18%
- 23. Unit Forced Outage Rate 0.00% 0.00% 5.69%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITT NA NA INITIAL ELECTRICITY NA NA CObetERCIAL OPERATION NA NA 1
. _ . . . . , _ . . . ~ ~ _ _ . . _ .
AVERAGE DAILY UNIT POWER LEVEL ,
1 DOCKET NO: 50-362 )
UNIT NAME: SONGS - 3 l
DATE: November 15, 1995 1 l_ -
COMPLETED BY: C. E. Williams J TELEPHONE: -(714) 368-6707 l t
i
-MONTH: October 1995- ;
J DAY. AVERAGE DAILY POWER LEVEL- DAY AVERAGE DAILY POWER I LEVEL '
I
, (MWe-Net) (MWe-Net) l L 1- 1051.67 16 1097.17- l t J f 2 1018.71 17 "1097.42 I
3- 1022.38 18 1095.75 1 l 4 1050.29 19 1094.25 l
l t
5 1048.83 20' 1095.21' 6 1047.92 21 1093.83 l 7 1060.04 l 22 1092.13 ,
8 1089.33 23 1091.58 '
I 9 10921~3 24 1090.83 l l
10 1032.83 25 1089.92 l l j 11- 1992.92 26 1090.'17 I
'12 1393.29 27 1087.96 1
~13 1094.13 28 1082.08 l
l -14 1095.13 29 1047.68 15 1097.29 30 1092.00 31 1092.63 l
l l ,
i i I
l' .- - _ . . . .
~
UNIT CHUTDONN3 AND POWER REDUCTION 3 DOCKET NO:- 50-362 UNIT NAME: SONGS - 3
- REPORT MONTH: October 1995 DATE: November 15, 1995 .
-COMPLETED BY: C. E. Williams ,
TELEPHONE: (714)- 368-6707 :
i I
Method of Shutting Cause & Corrective Duration Down. LER System Component Action to' No. Date Type 2 (Hours) Reason 2.
Reactor 3 No. Code' Code 5 ' Prevent Recurrence t
There were no unit shutdowns or reductions in the Average Daily Power Level of more than 20% this reporting period.
i k
2F-Forced 2 Reason: ' Method: 'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. SIEEE Std 803A-1983 !
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from I
E-Operator Training & License Examination- Previous Month .
! F-Administrative .5-Reduction in the Average .
G-Operational Error (Explain) Daily Power. Level of more H-Other (Explain) than 20% from the previous day .
6-Other (Explain) i I
i i
3 :
, I
. SUbMARY OF OPERATING EXPERIENCE IDR THE MONTH DOCKET NO: 50-362
-UNIT NAME: SONGS - 3 DATE: November 15, 1995 COMPLETED BY: C. E. Williams TELEPHONE: (714) 368-6707 Date Time- Event October 01 0001- Unit is in Mode'1, 91.3% power, 1045 MWe.
Reactor power limited in order to maintain steam generator pressure greater than 855 psia.
October- 07 1722 Commenced raising reactor power to full load.
1920 Reactor at 99.2% power, 1142 MWe,
-October' 29 0200 All clocks adjusted back 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to conform to Pacific Standard Time.
October 31 2400 Unit is in Mode 1, 99.6% power,-1143 MWe.
4
~ -
) i I
+ ,
. i I
~ .,
. REPUELING INFORMATION j DOCKET NO: 50-362 ,
UNIT NAME: SONGS - 3 '
DATE: November 15,.1995 C. E. Williams I l'
COMPLETED BY:
L TELEPHONE: (714) 368-6707 5
l i
0 MONTH:- October 1995- ;
l'
- 1. Scheduled date for next refueling shutdown.
Cycle 9 refueling outage is forecast for March 1997.
- 2. Scheduled date for restart following refueling. i l' Restart from Cycle 9 refueling outage is forecast for May 1997. !
l
- 3. Will refueling or resumption of operation thereafter require a' ,
Technical Specification change or other license amendment? )
Unknown at this time. I What will these be?
Unknown at this time.
- 4. Scheduled date for submitting proposed licensing action and supporting information. <
l Unknown at this time.
- 5. Important licensing considerations associated with refueling, e.g. new l or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating.
procedures.
Unknown at this time. ,
e h
l l 5
~ _ ._ . _ . . . _ _ . _ _ _ . _ . . . - _ _ - . _ _ . . . _ _ _ . . . , _ . . > _ _ _ _ _ _ - . _ _
b l
. l i
REFUELING INPURMATION l DOCKET NO: 50-362 )
UNIT NAME: SONGS - 3 !
DATE: November 15, 1995 '!
COMPLETED BY: C. E. Williams l TELEPHONE: (714) 368-6707 l
- 6. The. number of fuel assemblies. .
f A. In the core. 217 ;
B. In the spent fuel storage pool. 818 Total Fuel Assemblies 700 Unit 3 Spent Fuel Assemblies 0 Unit 3 New Fuel Assemblies _;
118 Unit 1 Spent Fuel Assemblies ;
l C. In the New Fuel Storage Racks Zero Unit 3 New Fuel Assemblies j
- 7. Licensed spent fuel storage capacity. 1542 l j Intended change in' spent fuel storage capacity. None ,
i i
- 8. . Projected date of last refueling that can be discharged to spent fuel
'stcrage pool assuming present capacity. {,
i Approximately 2003 (full off-load-capability). ;
l 1
r r
l i
i l !
i i
l i
i 6
]
, -