ML20094M168
| ML20094M168 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/15/1995 |
| From: | Marsh W SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20094M171 | List: |
| References | |
| NUDOCS 9511210301 | |
| Download: ML20094M168 (13) | |
Text
.
- M Southem Califomia Edison Company P. O. BOX 128 SAN CLEMENTE, CALIFORNIA 92674-0128 w^tTEn c. uans+
November 15, 1995 rus.e~e MONQGER OF P4UCLEAR REGULATORY AFF AIRS (714) 368-7500 l
l U.
S. Nuclear Regulatory Commission I
' Document Control Desk Washington, D.C.
20555 l
Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for October 1995 i
San Onofre Nuclear Generating Station,- Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating' Licenses NPF-10~
and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Edison to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to_the offsite Dose Calculation Manual (ODCM); and any major changes to the' radioactive waste treatment system.
All covered activities.are reported monthly, except for ODCM changes,.which are reported within 90 days from the time the changes are effective.
This letter transmits the October'1995 Monthly Operating Reports for Units 2 and-3, respectively.
There were no challeng'es to safety valves,"no major changes to the Units 2 and 3 radioactive waste
-treatment' systems, and no changes to the ODCM during the reporting period.
l If you require any additional information, please let me know.
I
?
Sincerely, g Dc t
m i
3 Enclosures-
'd cc:
L. J. Callan, Regional Administrator, NRC Region IV J.
E.
Dyer, Director, Division of Reactor Projects, NRC Region IV l
K.
E.
- Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV i
M.'B. Fields, NRC Project Manager, Units 2 and 3 J
J. A. Sloan, Senior NRC Resident Inspector, San Onofre Units 2 & 3 20CG56
~
l 9511210301 951115
/
l PDR ADOCK 0500 1
i g
.R 1
J