Monthly Operating Repts for Oct 1995 for McGuire Nuclear Station
ML20094L034
Person / Time
Site: McGuire, Mcguire  
Issue date: 10/31/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20094L033 List:
References
NUDOCS 9511200013
Download: ML20094L034 (10)


Text

1 l

OPERATikB CATA REPCRT DDCKET NO 50-369 DATE Nevenber 15. 1995 OPERATING STATUS COMPLETED BY R.A. Willines TELEPHONE 704-382-5346

! Unit Nases EcGuire 1

2. Reporting Period Octcber 1,1995-October 31,1995
3. Licensed Thereal Poner (MWt):

3411 i

4. Naseplate Rating (Bross MWe):

1305e Notes *Waseplate Rating

)

5.DesignElectricalRating(NetMWe):

11B0 (Bross MWe) calculated as

6. flaximus Dependable Capacity (Bross MWe):

!!71 1450.000 MVA x.90 power

7. Maximus Dependable Capacity (Net MWe):

1129 factor per Page lit, B. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

9. Power level 10 Which Restricted, If Any (Net MWe):

i

10. Reason for Restrictions, if any:

This Month Yr.-to-Date Cumulative i

11. Hours In Reporting Period 745.0 7296.0 121992.0
12. Number Df Hours Reactor Was Critical 718.1 7100.0 87459.3
13. Reactor Reserve Shutdown Hours

--0--

- --0--

14. Hours Generator On-Line 702.5 6982.9 86495.5
15. Unit Reserve Shutdown Hoats -

--0--

--0--

16. Srcss Thersal Energy Benerated (MWH) 2343625 23499684 271322110
17. Gross Electrical Energy Generated (MWH) 795324 8029944 93181667
18. Net Electrical Energy Generated (MWH) 763163 7714535 69021903
19. Unit Service Factor 94.3 95.7 70.9
20. Unit Availability Factor 94.3 95.7 70.9
21. Lnit Capacity Factor (Using MDC Net) 90.7 93.7 63.6
22. Unit Capacity Fa:tpr (Using DER Net) 86.8 09.6 61.8
23. Unit Forced Dutage Rate 5.7 4.3 13.7
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duraticn of Each):

Refueling - December 14, 1995 - 43 days

25. If Shut Denn At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Consercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9511200013 951115 PDR ADOCK 05000369 R

PDR

l i

1 e

OPERATING CATA REPDRI DDCKET NO 50-369 UNIT McGuire i DATE November 15. 1995 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 GONTH Octeter. 1995 E

AVERAGE DAILY F0WER LEVEL pH AVERAGE DAILY POWER LEVEL (MWe-Net)

O!We-Net) 1 185 17 1114 2

0 18 1116 3

369 19 1117 4

1102 20 1118 5

1107 21 1119 6

1113 22

!!21 7

1113 23 1120 8

1!!0 24

!!22 9

1108 25

!!PI 10

!!09 26 1121 11 1107 27 1124 12 1107 28 1125 13 1109 29

!!24 14

!!!4 30 1124 15 1113 31 1125 16 1115

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME muyvins 1 DATE 11/ id/ n REPORT MONTH October 1995 COMPLETED BY x.

A.

nilliams 2

TELEPHONE tius).3ez-334e (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE

[

N Y

S SHUT EVENT SYS-CAUSE AND'CCRRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO l

a DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 5-P 95 1 F

A HH PUMPXX

'1A' FEEDWATER PUMP TURBINE LOW PRESSURE STOP VALVE SERVO 4

95 1 F

29.15 A

3 CB PUMPXX

'1D' REACTOR COOLANT PUMP TRIPPED 3

t 5

95 2 F

13.37 A

HA CKTBKR MAIN GENERATOR BRFAKERS TRIPPED i

OPEN l

-l t

i F

+

6

! (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions i

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee !

C-Refueling 3-Automatic Scram Event Report (LER)-

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161).

E-Operator Training & License Examination

~

F-Administrative (5)

(Explain) (Explain)

G-Operator Error Exhibit I - Same Source l

H-Other l

i l

I L

.h l

l E.....

.~.-

l I

l i

~

DOCKET: 50-369 UNIT: McGuire 1 i

Date:

11/15/95 i

f i

NARRATIVE

SUMMARY

MONTil: October 1995

[

McGuire Unit I began the month of October operating at approximately 48% power due to 'l A' feedwater pump turbine low pressure stop valve servo. The unit experienced a reactor trip due to 'lD' reactor coolant pump trip due to surge arrestor failure on 10/01/95 at 1012. On 10/02/95 at 1521 while placing the i

generator on line, both main generator breakers tripped open and the reactor held at 6.5% power. The unit was placed on-line on 10/03/95 at 0443. The unit returned to 100% full power on 10/04/95 at 0035 and j

operated at or near 100% full power the remainder of the month.

i t

Prepared by: R. A. Williams t

Telephone:(704)- 382-5346 i

MONTHLY REFUELING INFORMATION REOUEST l.

Facility name:

McGuire. Unit 1 2.

Scheduled next refueling shutdown: December 1995 3.

Scheduled restart following refueling: January 1996 TiiE PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TliROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 611 8.

Present licensed fuel pool capacity: 1461 Size of requested or planned increase: =

9.

Projected date oflast refueling which can be accommodated by present license capacity: March

g...

DUKE POWER COMPANY DATE: November 15.1995 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

OPERATING DATA REPORT DOCKET NO 50-370 DATE Novesber 15. 1995 0FERATING STATUS COMPLETED BY R.A. Williass TELEPHONE 704-382-5346 3

1. Unit Names Mc6 cite 2 i

l

2. Reporting Period: October 1, 1995-October 31,1995
3. Licensed Thersal Power (MWt):

3411

6. Nameplate Rating (Bross MWe):

1305*

Notes *Naseplate Rating

5. Design Electrical Rating (Net MWe):

!!B0 (Gross FWs) calculated as

6. Maxisus Dependable Capacity (6 toss f!We):

!!?!

1450.000 MVA r.90 power

7. Marises Dependable Capacity (Net MWe):

!!29 factor per Page iii,

8. If Changes Dccur in Capacity Ratings (!tess Nuaber 3 Through 71 Since Last NUREG-0020.

Report. Gne Reasons:

9. Power Level To Which Restricted, If Any (Net NWel
10. Feason For Restrictions, if any:

This Mcnth Yr.-to-Date Cusulative

11. Hours in Reporting Period 745.0 7296.0 1022B8.0
12. Number Of Hours Reactor Was Critical 745.0 6920.9 B0473.7
13. Reactor Reserve Shutdemn Hours --0--

--0--

14. riours Benerator On-Line 745.0 6B70.2 79454.8
15. Unit Reserve Shutdown Hours -

--0--

--0--

16. Gross Thereal Energy Generated (MWH) 2536146 23174710 261020124 l
17. Gross Electrical Energy Generated (MWH) 874700 7987617 91035215
19. Net Electrical Energy Generated (MWHI B42128 7681921 87304267
19. Unit Service factor 100.0 94.2 77.7
20. Unit Availability Factor 100.0 94.2 77.7
21. Unit Capatity Factor (Using MDC Net) 100.1 93.3 74.8
22. Unit Capacity Factr,r (Using DER Net) 95.8 89.2 72.3
23. Unit Forced Outa;e Rate 0.0 2.3 6.3 l

l

24. Shutdown Echeduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - March 27, 1996 - 45 days

25. If Shut Denn At End Of Report Period. Estinated Date of Startup:
26. Units In Test Status (Prior to Cossercial Operationi:

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL 0FERATION l

OPERAi!NG DATA REPORT DOCKET NO 50-370 UNIT PcGuire 2 DATE November 15. 1995 COMPLETED BY R.A. Willians TELEPHCNE 704-382-5346 MONTH Octeber. 1995 Q$1 AVERASE DAILY POWER LEVEL pel AVERAGE DA!LY POWER LEVEL (MWe-Net)

(MWe-NetI i

!!23 17 1130 E

1125 18 1131 3

!!28 19

!!31 4

!!25 20

!!32 5

1129 21 1133 6

1129 22

!!34 7

!!29 23

!!34 8

!!26 24

!!35 9

1125 25 1135 10 1126 26

!!35 11

!!25 27

!!37 12

!!24 2B

!!37 13

!!27 29 1137 14 1130 30 1135 l

15 1129 31 1136 16 1130 1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-370 UNIT NAME Muuuixt, 2 DATE 11/1d/95 REPORT MONTH October 1995 COMPLETED BY x.

a Williams TELEPHONE tius;-Juz-dese (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent g Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulato n Restriction 4-Other (Explain)

File ( M EG-0161)

E-Operator Training & License Examination F-Acministrative (5)

G-Operator Error (Explain) (Explain)

Exhibit I - Same Source H-Other

9 DOCKET: 50 - 370 UNIT: McGuire 2 Date:

11/15/95 NARRATIVE

SUMMARY

MONTil: October 1995 McGuire Unit 2 began the month of October operating at 100% full power. The unit operated at or near 100% full power for the entire month.

Prepared by: R. A. Williams Telephone: (704)- 382-5346 i

l i

l

9 MONTilLY REFUELING INFORMATION REOUEST 1.

Facility name:

McGuire. Unit 2 2.

Scheduled next refueling shutdown: March 1996 3.

Scheduled restart following refueling: May 1996 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuelassemblies (a) in the core: 193 (b) in the spent fuel pool: 3.91 8.

Present licensed fuel pool capacity: Mfd Size of requested or planned increase:.--

9.

Projected date oflast refueling which can be accommodated by present license capacity:

December 2003 DUKE POWER COMPANY DATE: November 15.1991 Name of

Contact:

R. A. Williams Phone: (7041-382-5346

- _ - _ _ _ _