ML20094E895

From kanterella
Jump to navigation Jump to search
Forwards Answers to Applicant Motion for Summary Disposition Re Alleged Errors Made in Determining Damping Factors,Allegations Re Aws & ASME Code Provisions & Friction Force in Pipe Design.Related Correspondence
ML20094E895
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/06/1984
From: Ellis J
Citizens Association for Sound Energy
To: Bloch P, Jordan W, Mccollom K
Atomic Safety and Licensing Board Panel
Shared Package
ML20094E903 List:
References
OL, NUDOCS 8408090408
Download: ML20094E895 (1)


Text

,

CASE (CITIZENS ASSN. FOR SOUND ENERGY)

=Ev~

August 6, 1984 00 u.D Ep l Administrative Judge Peter B. Bloch Dr. Kenneth A..McNfom, Dean  !

U. S. Nuclear Regulatory Commission Division of Engineering, Architecture 4350. East / West Highway, 4th Floor and blchd6]ogy ll j j Bethesda, Maryland 20014 Oklahoma State Univers1 y Dr. Walter H. Jordan Stillwaterghlahoma I 74074 881 W. Outer Drive 00cMhiE;7sfpyIh SRANCH Oak Ridge, Tennessee 37830 Gentlemen:

SU8 JECT: In the Matter of Application of Texas Utilities Generating Company, et al . for An Operating License for Comanche Peak Steam Electric Station Units #1 and #2 (CPSES)

Docket Nos. 50-445 and 50-446 OC CASE's Answers to Some Motions for Summary Disposition We are attaching the following Answers to Applicants' Motions for Summary Disposition Regarding:

Alleged Errors Made in Determining Damping Factors for OBE and SSE Loading Conditions Certain CASE Allegations Regarding AWS and_ ASME Code Provisions Related to Design Issues Consideration of Friction Forces in the Design of Pipe Supports with Small Thermal Movements We have now been informed by the NRC Staff that they plan to have five or six additional Answers (in addition to those listed above) ready to mail the week of the 13th, probably around 8/15/84. Since most of our work on these Answers must be done on week-ends, we plan to mail whatever Answers we have co,mpleted on Monday, 8/13/84. We will do the best we can to comply with the Board's direction to beat the Staff in our filings; however, because of the amount of time necessary to prepare these answers, my best guess at this time is that we will not be able to file that many Answers before the Staff files, and some of those answers may not be for the same ones the Staff files first.

We will do the best we can; we can do no more. We will advise the Board if it looks as though we will not be able to meet the deadline, but this will not be known for sure until the week-end.

Sincerely, 8408090408 840806 s

  • PDR ADOCK 05000445 .

s c.</

G PDR irs.) Juanita Ellis, CASE Pr -ident '

cc: Service list i Attachments (3) b