OPERATING DATA REPORT DOCKET NO.
50-302 UNIT FLCRP-3 DATE January 10.1992 COMPLETED BY J. A. Binkowski TELEPHONE (904) 563-4485 OPERATING STATUS 1 U NIT N AME:.....,...........
CRYSTAL RIVER UNIT 1
- 2. REPORTING PERIOD:......
..................... N OVEM B E R 1-30 1.01
- 3. LICENSEC> THERMAL POWER (MWt):..
..-2544
- 4. NAMEPLATE RATING (GROSS MWe):..................
- 5. DESIGN ELECTRICAL RATING (NET MWe):...
825-
- 6. - MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):..,860 -
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):.. 821
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TOWHICH RESTRICTED,IF ANY (NET MWe):
N/A
- 10. REASONS FOR RESTRICTIONS,IF ANY:
N/A THIS MON 1H YR.TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD
'720.0 -
8,016.0_
129.024.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 99.5 '
6.833.7 83.482.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6
- 14. HRS GENERATOR ON LINE 97.2
- 6.785.6 81.795.7--
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0.
0.0 0.0 16, GROSS THERMAL ENERGY GENERATED (MWH) 210,6762
-15,893.509-185,397,715
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 71.385 5.410.052 63,298.517'
- 18. NET ELECTRICAL ENERGY CENERATED(MWH) 67.727 ~
5.147.591 60.122.141
- 19. UNIT SERVICE FACTOR 13.5 %
84.7 %
63.4 %
- 20. UNIT AVAILABLE FACTOR 13 5 %
84.7 %
63,4 %
- 21. UNIT CAPACITY FACTOR (using MDC not) 11.5 %
78.2 %
57.8 %
- 22. UNIT CAPACITY FACTOR (using DER net) 11.4 %
77.8%
56.5 %
- 23. UNIT FORCED OUTAGE RATE 23.3 %
. 2.0%
19.2%
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refue! 8 commencing on 4/30/92; duration of 56 days.
- 25. IF SHUTDOWN AT END OF REPORT PEWOD. ESTIM ATED DATE OF STARTUP:
N/A
- 26. UNITT IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
THIS.' TEM IS NOT APPLICABLE TO CR-3 F f'" AST ACHIEVED INITIAL CRITICALITY WA NA INITIAL ELECTRICITY Na NA COMMERCIAL OPERATION NA NA 9201270264 920110 PDR ADOCK 0S000302
.R ppg.
U; f
y 'a-:-
' AVERAGE DAILY UNIT POWER LEVEL ~
ye DOCKET NO.
~50-302
,n;,
UNIT __
- FLCRP-3 DATE-Docembo/ 03,1991 COMPLE1LD BY fA. Dinkowski--
TELEFHONE (904) 563-4485
_Y:.
-MONTH NOVEMBER
- M 1Lt.
i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) _
j~
05 17 DOA-
- 2 c0~,
18-
- 0-3>
02
.19 0-4i.
- 0!
'20 0-r 5
0' 21 0=
-- 6 :
30 ::-
22-
- 0':
2
'7:
10" 23
-0'
'B.
709 24 0 -'
g
- 0; 25, _
- 0' 10 !-
. : 0 :.
26 50L 3
11:
?OJ 27 386:~
' 10 -: -
28 7761 13i,.~
?06 29
' 818 ->
'842!
14- : =. : -
=0!
~
30 l
15 :-
~ 0 :-
16
.0
-INSTRUCTIONS:
- i On this format list the_ daily averago unit power levelin MWe-Net for each day m the-1 reporting month. Compute to the near6st whole megawatt.
i
.. e
, _ ~
_}
b
a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKER NO.
50-302 UNIT FLCRP-3 REPORT MONTH:. NOVEMBER DATE January 10,1992 COMPLETED BY J. A. BenkowaAs TELEPt40NE (904)563-4485 NO.
DATE TYPE (1)
DURATION REASON (2)
METHOD OF LaCENSEE SYSTG COMPONENT CAUSE AND CORRECTIVE HOURS.
SHUTTING EVENT CODE (4)
CODE (5)
ACDON TO PREVENT DOWN REACTOR (3) REPORT #
RECURRENCE 91-40 911125 F
- 29.6 *
'G-
'3>
91-014:
'CH-
- lNSTRU : ' Reactor trip on less of both Main Feedwater Pumpe caused by ;
. high deaeratorlevel. Root cause is considered to be failure to stabilize condensate /feedwater flow during startup(Unit was on lin3 for four minutes). Additionally,deaerator level indication failed low. Training is being provided to the operating ciews. The levelindication was repaired.
91-41.911126
'S:
622.8.-
B-
- 4 N/A ZZ -'
'eeeeee Completed mid cycle maintenance outage.-
- Note : These hours are listed separately but are included in the total mid cycle duration hours.
1 2
3 4
6 F: FORCED REASON:
METHOD DHIBIT G - 24STRUCTF'J4 EXHf0fT I - SAME SOUFG S-SCHEDULED A-EQUIPMENT FAILUFE 1-M ANUAL FOR PREPARATh>N OF DATA B aAAWTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C-NFUELING 3-AUTO SCRAM EVENT KFT.1RT (LER) FLE D-REOULATORY RESTFDCTION 4-CONTINUFD (NUREG4191)
E OPERATOR TFWNING &
6-REDUCED LOAD LICENSE ADufNISTRATION S.OTHER F-ADMW1STRAT10N G4PERAT10NAL ENROR H-O HFR
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO.
50-302 UNIT FLCRP-3 DATE January 10.1992 COMPLETED BY LA. Binkowski TELEr4 TONE (904)563-4485 MONTH: NOVEMBER
SUMMARY
STATEMENT:
Crystal River Unit 3 completed its first planned mid-cycle maintenance outage on November 26,1991. The outage exceeded the schedule by 10 days in order to accomodata replacement of an RCP Seal and to repair two control rod drive tube gaskets. As the plant was returning to full power, failure of the feedwater header cross tie valve and a recctor power level detector resulted in delay of the restart. An additional delay resulted when a reactor trip occurred after the plant had been on line for four minutes. The trip was attributed to high deaerator level and related instrument failure.
Some significant activities were: a) overhaul of a Raw Water Pump (RWP-3B); b) replacement of a Letdown Cooler; c) modification of a Primary Relief Valve Tailpipe (RCV-8); d) tie-in and testing of the new Turbine Building battery; e) teardown inspection of both Emergency Diesel Generators; f) repair of steam generator feedwater flange leak, and g) the leak-tightness test of the Reactor Building.