Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984
ML20094D777
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/14/1984
From: Cummings G, Wade W
LAWRENCE LIVERMORE NATIONAL LABORATORY
To: Morrill P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20094D695 List:
References
CON-FIN-A-0753, CON-FIN-A-753, CON-FIN-B-8552 WOW:-84-20, NUDOCS 8408080521
Download: ML20094D777 (6)


Text

F .

, , .l - n =

Lawrence Livermore National Laboratory May 14, 1984 WOW: 84-20 Mr. Phillip J. Morrill, Project Manager U. S. Nuclear Regulatory Agency, Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 PROGRESS REPORT, APRIL 1984 TECHNICAL ASSISTANCE FOR INSPECTION OF DIABLO CANYON DESIGN VERIFICATION PROGRAM, FIN B8552 (UNIT 1) AND FIN A0753 (UNIT 2).

1. Proiect Description As a consequence of an Independent Design Verification Program, many modifications and additions to the piping and electrical raceway support systems and building structural steel are being implemented at the Diablo Canyon Nuclear Power Plant. The LLNL is assisting the NRC Region V office in assessing the adequacy of this work.
2. Progress - April 1984 Inspection work continued in Unit 2 at the planned level-of-effort (see Attachment 1) with one exception. The week of April 2,1984 was de-voted to the inspection of rectangular tube steel with a perimeter < 14 inches that has been used for Safety Class I systems. The priiiiary objective was to examine 100-200 pieces to verify the outside radius of curvature to be < 2 times the wall thickness. The data was transmitted verbally on ApriT 6,1984 and a written report was issued on April 19, 1984.

Attempts to examine Unit 2 rupture restraints were unsuccessful. Most or 'all of these are apparently missing the bumpers and crushable pads.

Inspection of these items will therefore be delayed until much later in the year when Q.C. has been compl eted and all components have been installed.

3. Funding The detailed report of expenditures for this period is provided in Attachments 2 & 3.
4. Personnel, Subcontracts,andConsu]tants Mark Eli will be providing temporary assistance to the LLNL inspection program at SONGS during the next report period which may reduce the level-of-effort to this program.

8408080521 840727 PDR ADOCK 05000275 G PDR ni n& Ox e wn i n,m .t ngma c.ac nu . no nu um : z,n c ,m, amso raum.c:m.s??-noa Twox:m9ocw wn

W-0; -

fn p

Mr. Phil/ Morrill' May 14, 1984 p Page 2 L

+

q _ 5. Meetings / Travel k

4 v ' Mark Eli met with Dennis Kirsh in San Luis Obispo on . April 6, 1984 to transmit tube . steel inspection results. Wally Wade met with Phil

Morrill at the site on April 19, 1984 to resolve administrative topics, n- 6. . Concerns-None

'7. Plans.

Ins'pections are to continue in Unit 2.

L

WALLACE G. WADE

' PROJECT MANAGER

'EG&G MECHANICAL-ENGINEERING DEPARTMENT a -

!l: ~

L'~ LAppr0ved:

7-. .)) .e- -

.\

(Wf .)

- GARTH E. CUPNINGS iDEPUTY PROGRAM LEADER f

NUCLEAR SYSTEM SAFETY. PROGRAM

' WOW: cog

,  : Attachment

' Distribution:

LLNL- NRC EG8G/SR0 G. -Cumings '

-R. Gilbert A. Debeling

.J.JJohnson-l4 j . , B 46trsch - R. Pong

' R. Langland H. Canter. C. Morton b<

M. L Eli T. Bishop

-R. Isogdanowicz E. Frigillana 4

C.-Meier

-J. Selan-E R.' White d

r , Page 1 of 2

. ATTACHMENT 1 U

N LO6 I PART START COMPLETE STATUS MAN

-NUM LOC T ITEM NUMBER DATE DATE CRIT CONTACTS AFF STATUS DATE INSP HRS

- M0080 AUI BLDS 1 P!PE HANGER 585-138R 7/18/83 4/25/84 ESD 223 TINKLE PS PHYSICAL 1/12/84 MWE 16.0 HOWELL BE NPPR-DCl 3/30/84 MWE 5.0 SAUDIUSD P6 84-CC-2BS SWF-MM 3/30/64 MWE 5.0 1-83-516 ACCEPTED 4/25/84 MWE 3.0 Ml 3 TURBINE BLDG 1 RUPTURE RESTRNT 141RR  !!/16/83 4/25/84 ESD 243 MORGAN PG PHYSICAL 11/16/83 MWE 9.0 PARKER P6 RECORDS 12/13/83 ME 4.0 ACCEPTED 4/25/84 MWE 2.0 M1004 CONTAINMENTJ l RUPiliRE RESTRNT 7-4RR  !!/16/83 4/25/84 ESD 243 MORSAN P6 RECORDS 12/13/83 MWE 13.0 PARKER P6 ACCEPTED 4/25/84 MWE 2.0

-M1005 CONTAINMENT I RUPTURE RESTRNT l-7RR 11/17/83 4/25/84 ESD 243 MORGAN P6 RECORDS 12/13/83 MWE 11.0 PARKER P6 ACCEPTED 4/25/84 MWE 2.0 M1038 CONTAINMENT '2 SPRAY HANGER 20-96R- 2/22/84 4/25/84 ESD 223 BERNASCONI P6 WELD 2/22/84 MWE 10.0 MICHAELS P6 AS-BUILT 2/22/84 t'WE 2. 0

';. MVR M-4684 3/30/84 ACCEPTED 4/25/84 M1040 CONTAINMENT 2 SPRAY HANGER 20-33R 2/23/84 4/25/84 ESD 223 MICHAELS P6 DR 8174 2/23/84 MWE 9.0 ACCEPTED 4/25/84 PWE 2.0 M1049 CONTAIMENT' -2 SPRAY HANSER 20-12R 3/07/84 4/25/84 ESD 223 MICHAELS P6 RECORDS 3/08/84 PWE 5.0 ACCEPTED 4/25/84 PWE 2.0 M1051 CONTAINMENT 2 SPRAY HAN6ER 20-47R 3/07/84 4/25/84 ESD 223 BERNASCONI PG RECORDS 3/08/84 NWE 5.0 f ACCEPTED 4/25/84 MWE 4/10/84 JCS 2.0 1.5 M1055 CONTAINMENT '2 PIPE HAMBER 412-!!4SL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED THOMAS BE CHM 1.5 BENTACUR BE M1056 CONTAINMENT 2 P!PE HANGER 70-95L 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM 1.5 BENTACUR BE t

~ M1057 CONTAIMENT: 2 PIPE HAN6ER 96-3SL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM 1.5 BENTACUR BE M1058 CONTAI MENT 2 PIPE HANGER 78-260SL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM  !.5 BENTACUR - BE

M1059 CONTAINMENT 2 PIPE HANGER - 78-30BSL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM 1.5 BENTACUR BE

-M1060 CONTA! MENT 2 PIPE HANGER -412-4;SL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM 1.5

. . BENTACUR BE M1061 CONTA! MENT - '2 PIPE HANGER 97-12R 4/10'?4 4/10/04 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE j"L BENTACUR BE

- M1062 CONTA! MENT -2 PIPE HANGER 5-5R .4/10/94 ESD 223 KULIK0WSKI BE WELD 4/12/84JCS 1. 5 '

THOMAS BE CHM 1.5 BENTACUR BE

.M1063 CONTAINMENT 2 PIPE HANGER 70-66SL 4/11/84 4/11/84 EED 223 KULIK0WSKI BE ACCEPTED 4/11/64 JCS 1.0 THOMAS BE BENTACUR BE M1044 CONTA!WENT - 2 PIPE HAN6ER 412-63SL 4/11/84 ESD 223 KULIK0WSKI BE PHYSICAL 4/12/84 JCS 6.0 THOMAS BE

- BENTACUR BE

.M1065 CONTA! WENT 2 FIPE HANGER - 71-50SL 4/11/C4 4/11/54 ESD 223 KULIK0WSK! BE ACC-W/0-GA 4/11/84 JCS 1.0 THOMAS BE BENTACUR BE

, : M1066 PENETRAT BLDG 2 P!PE HANGER 413-310R 4/11/84 4/11/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/11/84 JCS 1.0 o' THOMAS BE BENTACUR BE

> M!i 7 CONTA! MENT 2 PIPE HANSER ' 71-68SL 4/12/64 ESD 223 KUllK0WSK! BE WLDR QF 4/12/84 JCS 1.5 E50 216 THOMAS BE CHM !.5 BENTACUR BE M1083 CONTAIMENT- 2 PIPE HAN6ER 7-56R' 4/24/84 ESD 223 KULIK0WSKI BE MVR M-4705 4/26/84 CHM 3.0 ESD 216 BERNASCONI BE M1084 CONTAIMENT 2 PIPE HANGER- 7-82R 4/24/84 4/24/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/24/84 CHM 2.0 BERNASCCNI BE

?M1085 VENTILATION: -2 PIPE HAN6ER 333-42R 4/24/84 ESD 223 KULIK0WRI BE MVR M-4706 4/26/84 CHM 3.0 BERNASCONI BE M1086 PENETRAT BLD6 2 PIPE HAN6ER 2045-IV '4/24/84 ESD 223 KUllK0WSKI BE RECORDS 4/26/84 CHM 2.0 BERNASCONI BE

- M1087 CONTAINMENT .-2 P!PE HANGER 78-2595L 4/24/84 4/24/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/24/84 CHM 2.0 BERNASCONI BE

.M1088 CONTAINMENT. . 2 PIPE HAN6ER 14R 4/25/84 4/25/84 ESD 223 KUllK0WSK! BE ACCEPTED 4/25/84 CHM 2.0 EERNASCON! BE k

'a _

Page P. of 2 g,K. 7 ,

ATTACHMENT 1

'N1089 CONTAIMENT  ? P!PE HAN6ER- 2-23V~ 4/25/84 ESD 223 KULIK0WSK! BE WLCR QF 4/26/84 CHM 3.0 ESD 216 BERNASCONI BE

N1090 CONTA! MENT'  : 2 PIPE HAN6ER 6-121R 4/25/84 4/25/84 ESD 223 KUllK0WSKI BE ACCEPTED 4/25/84 CHM 3.0

, BERNASCONI BE

.M1091 CONTA!'NMENT - ' 2 PIPE'HAN6ER6-132V 4/25/84 4/26/94 ESD 223 KULIK0WSKI BE ACCEPTED 4/26/84 CHM 2.0 F . .

BERNASCON! PE

.M1092 CONTAINMENT ~ . 2 PIPE HAN6ER. 412-IllR 4/25/84 4/25/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/25/84 CHM 2.0 BERNASCON! BE M1093 CONTA! MENT -2 PIPE HAN6ER 412-149SL 4/25/84 4/25/84 ESD 223 KULIK0WSK! BE ACCEPTED 4/25!84 CHM 2.0 0 ~

. BERNASCONI BE

- Ml Z4 AUX BLD6 ' 2 PIPE HAN6ER- 948-4R 4/25/84 4/26/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/26/84 CHM 2.0 BERNASCONI BE S1024 CONTAINMENT - ~2 A MULUS' 10033-C2-13-249 2/01/04 4/25/84 QCP 3 KCHLER BE WELD 2/01/84 MWE QCP 5A MUNRO BE WLDR QF 2/02/84 MWE 14.0 QCP C7 BECK 0RT F0 NCR 2/02/84 MWE QCP 5 AMARILLAS F0 54?2-455 BURD0!N NR CITAT!DN 2/10/84 ACC-W/0-QA 4/25/84 MWE 3.0 51025 CONTAINMENT ' 2 ANNULUS 10043-02-13-420 2/07/84 4/25/84 QCP 3 KOHLER BE PHYSICAL 2/07/84 MWE QCP 5A MUNR0 BE NCR 2/08/84 MWE 3.0 QCP C7 BECK 0RT F0 5422-466 3/30/84

.. , ACC-W/0-QA 4/25/84 MWE 3.0 51026 CONTA! MENT'. 2 ANNULUS 10074-C2-13-652 2/08/84 4/25/24 QCP 3 KOHLER BE PHYSICAL 2/08/84 MWE QCP 5A MUNR0 BE NCR 2/09/84 MWE 3.0 GCP C7 BECK 0RT F0 5422-462 3/30/84 ACC-W/0-QA 4/25/84 MWE 3.0

.: 51075 CONTAINMENT . 2 ANNULUS 10042-02-13-690 4/11/84 4/11/84 QCP 5A MUNR0 BE ACC-W/0-QA 4/11/84 JCS 1.0 QCP C7 BER6 F0 lS1076 CONTAINMENT" - 2 ANNULUS 10028-C2-13-113 4/11/84 4/11/84 QCP 5A MUNR0 BE ACC-W/0-QA 4/11/84JCS 1.0 GCP C7 BERS F0 S1077 CONTAINMENT . 2 ANNULUS 10003-C2-13-015 4/11/84 4/11/84 QCP 5A NUNR0 BE ACC-WID-QA 4/11/84 JCS 1.0 QCP C7 BERS F0 CHM 1.0 S1078 CONTAIMENT 2 ANNULUS. 10003-C2-13-003 4/11/84 4/12/84 QCP 5A MUNR0 BE ACC-W/0-QA 4/12/04 JCS 1.5 ECP C7 BERS F0 CHM !.5 QCP 5

. 51079 TURRINE BLD6 2 TURBINE BLD6 10181-t2-13-823 4/25/84 QCP 3 HARRISON BE RECORDS 4/25/84 MWE 4.0 QCP 5A BERS F0 QCP C7 3

a e

i, b

[_, --

. . -) . -

ATTACHMENT 2 s

UNIT )1 PROJECT FINANCIAL STATUS (THROUGH 30 APRIL 1984)*

M _

JA '. - STATUS'- (Dollars in thousands)

Total _ Projected. Funds Obligated Balance of Funds Due Project Cost To Date FY 1983

$345.0K $345.0K B. ANALYSIS Period Cumulative

' Direct Laboratory Staff Effort -(FTE) 0 1.2 Direct Salaries $ 0 $ 36.0 Material' and Services (Excluding ADP) $ - $ -

'ADP Support.. $ -

' Subcontracts (EG8G, Inc.) $ 7.5 $ 94.6 g Travel Expenses $ .2 $ 17.5 g iIndirect' Labor Costs $ 0 $ 34.8 h" Other~(TID)

~ '

$ 0 $ 0.2 l ,, ' General and Administrative $ 0.7 $ 27.5 mi . _

I:f;' ,

i h~ TOTAL $ 8.4 $210.6

=

Thy ,

Lieni $ (0.5)

L Total - Inc1 uding . Liens $210.1 )

bu.

1.m '

N '(Percent of~Available Funding) 61% I 4{e m .

  • NOTE: -Figures may differ slightly from final billing, y l G- -

ATTACHMENT 3 UNIT #2 PROJECT FINANCIAL STATUS (THROUGH 30 APRIL 1984)*

A. -STATUS (Dollars in thousands)

Total Projected Funds Obligated Balance of Funds Due l Project Cost To Date FY 1983 l

1

$125.0K $125.0K - 0_- I l

B. ANALYSIS Period Cumulative 3

Direct Laboratory Staff Effert (FTE) 1.7 4.9 Direct Salaries $ 7.3 $ 20.3 Material and Services (Excluding ADP) $ - $ -

ADP Support $ -

Subcontracts (EG8G,.Inc.) $ 9.3 $ 21.4 Travel Expenses $ 2.2 $ 6.0 l Indirect Labor Costs $ 9.4 $ 21.7 Other (TID) $ 0 $ 0 General and Administrative $ 3.9 $ 3.9 j

TOTAL $32.1 $ 73.3 Liens $ (1.4) )

l Total Including Liens $ 71.9 (Percent of Available Funding) 58%

  • NOTE: Figures may differ slightly from final billing.

I,