Category:CONTRACTED REPORT - RTA
MONTHYEARML20195K1351988-01-27027 January 1988 Technical Evaluation Rept of Dcrdr Pacific Gas & Electric Co,Diablo Canyon Power Plant Units 1 & 2 ML20195G5511987-09-30030 September 1987 Demonstration of Containment Vacuum/Overpressure Relief Valve Operability for Diablo Canyon Power Plant Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20205A3001985-02-11011 February 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Jan 1985 ML20205A2861985-01-14014 January 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Dec 1984 ML20205A2511984-12-12012 December 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Nov 1984 ML20112A7081984-11-14014 November 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Oct 1984 ML20112A6971984-10-10010 October 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Sept 1984 ML20112A6931984-09-19019 September 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Aug 1984 ML20098E8541984-08-0909 August 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for Jul 1984 ML20098E8511984-07-19019 July 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for June 1984 ML20098E8491984-06-13013 June 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for May 1984 ML20094D7771984-05-14014 May 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984 ML20091G0931984-04-30030 April 1984 Digman:A Computer Program to Illustrate the Complexities in Sampling Commercial LOW-LEVEL Waste Sites for Radionuclide Spills or Migration ML20094D7661984-04-11011 April 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Mar 1984 ML20094D7611984-03-14014 March 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984 ML20080F2001983-12-31031 December 1983 Equipment Qualification Insp Program - Annual Rept ML20210E6201983-11-22022 November 1983 Rev 0 to Project Quality Plan for Providing Assistance & Svcs to Support Nrc/Ie Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2. Supporting Documentation Encl ML20081C8211983-08-31031 August 1983 Insp Repts, Aug 1983 ML20081C7821983-07-31031 July 1983 Insp Repts, Jul 1983 ML20209C1501983-05-17017 May 1983 Summarizes Results of Plant Annulus Structure Horizontal Response to Hosgri Seismic Input Analysis Discussed W/Nrc in Mar 1983.Drawing List,Drawings & Envelope Spectra for Each of Four Floors Encl ML20072R6351983-03-11011 March 1983 Independent Design Verification Program Semimonthly Rept,830311 ML20071C6681982-11-30030 November 1982 Draft Identification & Ranking of Nuclear Plant Structures,Sys & Components & Graded QA Guidelines ML20070Q6801982-10-0808 October 1982 Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ ML20070Q6881982-10-0808 October 1982 Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ ML20065A6251982-08-31031 August 1982 Independent Seismic Evaluation of the Diablo Canyon Unit 1 Containment Annulus Structure and Selected Piping Systems ML20062K0861982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20039H1351981-11-30030 November 1981 Audit of PG&E Documentation Concerning Environ Qualification of Safety-Related Electrical Equipment Per NUREG-0588 for Diablo Canyon Nuclear Plants, Technical Evaluation Rept ML20203H3351981-10-22022 October 1981 Audit & Review Summary 811014-16. Supporting Documentation Encl ML20009F0611981-07-31031 July 1981 Diablo Canyon Nuclear Power Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation ML20117M9861977-06-30030 June 1977 Draft Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant 1988-01-27
[Table view] Category:QUICK LOOK
MONTHYEARML20195K1351988-01-27027 January 1988 Technical Evaluation Rept of Dcrdr Pacific Gas & Electric Co,Diablo Canyon Power Plant Units 1 & 2 ML20195G5511987-09-30030 September 1987 Demonstration of Containment Vacuum/Overpressure Relief Valve Operability for Diablo Canyon Power Plant Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20205A3001985-02-11011 February 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Jan 1985 ML20205A2861985-01-14014 January 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Dec 1984 ML20205A2511984-12-12012 December 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Nov 1984 ML20112A7081984-11-14014 November 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Oct 1984 ML20112A6971984-10-10010 October 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Sept 1984 ML20112A6931984-09-19019 September 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Aug 1984 ML20098E8541984-08-0909 August 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for Jul 1984 ML20098E8511984-07-19019 July 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for June 1984 ML20098E8491984-06-13013 June 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for May 1984 ML20094D7771984-05-14014 May 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984 ML20091G0931984-04-30030 April 1984 Digman:A Computer Program to Illustrate the Complexities in Sampling Commercial LOW-LEVEL Waste Sites for Radionuclide Spills or Migration ML20094D7661984-04-11011 April 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Mar 1984 ML20094D7611984-03-14014 March 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984 ML20080F2001983-12-31031 December 1983 Equipment Qualification Insp Program - Annual Rept ML20210E6201983-11-22022 November 1983 Rev 0 to Project Quality Plan for Providing Assistance & Svcs to Support Nrc/Ie Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2. Supporting Documentation Encl ML20081C8211983-08-31031 August 1983 Insp Repts, Aug 1983 ML20081C7821983-07-31031 July 1983 Insp Repts, Jul 1983 ML20209C1501983-05-17017 May 1983 Summarizes Results of Plant Annulus Structure Horizontal Response to Hosgri Seismic Input Analysis Discussed W/Nrc in Mar 1983.Drawing List,Drawings & Envelope Spectra for Each of Four Floors Encl ML20072R6351983-03-11011 March 1983 Independent Design Verification Program Semimonthly Rept,830311 ML20071C6681982-11-30030 November 1982 Draft Identification & Ranking of Nuclear Plant Structures,Sys & Components & Graded QA Guidelines ML20070Q6801982-10-0808 October 1982 Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ ML20070Q6881982-10-0808 October 1982 Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ ML20065A6251982-08-31031 August 1982 Independent Seismic Evaluation of the Diablo Canyon Unit 1 Containment Annulus Structure and Selected Piping Systems ML20062K0861982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20039H1351981-11-30030 November 1981 Audit of PG&E Documentation Concerning Environ Qualification of Safety-Related Electrical Equipment Per NUREG-0588 for Diablo Canyon Nuclear Plants, Technical Evaluation Rept ML20203H3351981-10-22022 October 1981 Audit & Review Summary 811014-16. Supporting Documentation Encl ML20009F0611981-07-31031 July 1981 Diablo Canyon Nuclear Power Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation ML20117M9861977-06-30030 June 1977 Draft Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant 1988-01-27
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20195K1351988-01-27027 January 1988 Technical Evaluation Rept of Dcrdr Pacific Gas & Electric Co,Diablo Canyon Power Plant Units 1 & 2 ML20195G5511987-09-30030 September 1987 Demonstration of Containment Vacuum/Overpressure Relief Valve Operability for Diablo Canyon Power Plant Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20205A3001985-02-11011 February 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Jan 1985 ML20205A2861985-01-14014 January 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Dec 1984 ML20205A2511984-12-12012 December 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Nov 1984 ML20112A7081984-11-14014 November 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Oct 1984 ML20112A6971984-10-10010 October 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Sept 1984 ML20112A6931984-09-19019 September 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Aug 1984 ML20098E8541984-08-0909 August 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for Jul 1984 ML20098E8511984-07-19019 July 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for June 1984 ML20098E8491984-06-13013 June 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for May 1984 ML20094D7771984-05-14014 May 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984 ML20091G0931984-04-30030 April 1984 Digman:A Computer Program to Illustrate the Complexities in Sampling Commercial LOW-LEVEL Waste Sites for Radionuclide Spills or Migration ML20094D7661984-04-11011 April 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Mar 1984 ML20094D7611984-03-14014 March 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984 ML20080F2001983-12-31031 December 1983 Equipment Qualification Insp Program - Annual Rept ML20210E6201983-11-22022 November 1983 Rev 0 to Project Quality Plan for Providing Assistance & Svcs to Support Nrc/Ie Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2. Supporting Documentation Encl ML20081C8211983-08-31031 August 1983 Insp Repts, Aug 1983 ML20081C7821983-07-31031 July 1983 Insp Repts, Jul 1983 ML20209C1501983-05-17017 May 1983 Summarizes Results of Plant Annulus Structure Horizontal Response to Hosgri Seismic Input Analysis Discussed W/Nrc in Mar 1983.Drawing List,Drawings & Envelope Spectra for Each of Four Floors Encl ML20072R6351983-03-11011 March 1983 Independent Design Verification Program Semimonthly Rept,830311 ML20071C6681982-11-30030 November 1982 Draft Identification & Ranking of Nuclear Plant Structures,Sys & Components & Graded QA Guidelines ML20070Q6801982-10-0808 October 1982 Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ ML20070Q6881982-10-0808 October 1982 Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ ML20065A6251982-08-31031 August 1982 Independent Seismic Evaluation of the Diablo Canyon Unit 1 Containment Annulus Structure and Selected Piping Systems ML20062K0861982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20039H1351981-11-30030 November 1981 Audit of PG&E Documentation Concerning Environ Qualification of Safety-Related Electrical Equipment Per NUREG-0588 for Diablo Canyon Nuclear Plants, Technical Evaluation Rept ML20203H3351981-10-22022 October 1981 Audit & Review Summary 811014-16. Supporting Documentation Encl ML20009F0611981-07-31031 July 1981 Diablo Canyon Nuclear Power Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation ML20117M9861977-06-30030 June 1977 Draft Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant 1988-01-27
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20154B1301988-08-29029 August 1988 Notification of Contract Execution,Mod 8,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada-Reno,Mackay School of Mines ML20195K1351988-01-27027 January 1988 Technical Evaluation Rept of Dcrdr Pacific Gas & Electric Co,Diablo Canyon Power Plant Units 1 & 2 ML20236T2601987-11-19019 November 1987 Notification of Contract Execution Mod 5,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada - Reno ML20236T2731987-11-19019 November 1987 Mod 5,revising Paragraph C.3, Meeting & Travel as Stated, to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML20195G5511987-09-30030 September 1987 Demonstration of Containment Vacuum/Overpressure Relief Valve Operability for Diablo Canyon Power Plant Units 1 & 2, Technical Evaluation Rept ML20235M9311987-09-29029 September 1987 Notification of Contract Execution,Mod 6,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada,Reno ML20206J1191987-04-0808 April 1987 Notification of Contract Execution,Mod 4,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada - Reno,Mackay School of Mines ML20206J1371987-04-0808 April 1987 Mod 4,recognizing Administrative Changes Due to NRC Reorganization & Changing Billing Address,To Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML20207B7811986-12-17017 December 1986 Notification of Contract Execution,Mod 3,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada-Reno ML20207B8081986-12-17017 December 1986 Mod 3,providing Incremental Funding,To Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20197B6501986-10-20020 October 1986 Notification of Contract Execution,Mod 2,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada-Reno,MacKay School of Mines ML20197B6601986-10-20020 October 1986 Mod 2,providing Incremental Funding,To Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML20203N2241986-04-24024 April 1986 Notification of Contract Execution,Mod 1,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada-Reno ML20203N2331986-04-24024 April 1986 Mod 1,providing Funding Action,Changing B&R Number & Changing Project Officer,To Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML20129H2041985-07-0808 July 1985 Notification of Contract Execution, Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant, Awarded to Univ of Nevada ML20129H2351985-07-0808 July 1985 Contract: Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant, Awarded to Univ of Nevada ML20205A3001985-02-11011 February 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Jan 1985 ML20205A2861985-01-14014 January 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Dec 1984 ML20205A2511984-12-12012 December 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Nov 1984 ML20112A7081984-11-14014 November 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Oct 1984 ML20112A6971984-10-10010 October 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Sept 1984 ML20112A6931984-09-19019 September 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Aug 1984 ML20098E8541984-08-0909 August 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for Jul 1984 ML20098E8511984-07-19019 July 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for June 1984 ML20098E8491984-06-13013 June 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for May 1984 ML20094D7771984-05-14014 May 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984 ML20091G0931984-04-30030 April 1984 Digman:A Computer Program to Illustrate the Complexities in Sampling Commercial LOW-LEVEL Waste Sites for Radionuclide Spills or Migration ML20094D7661984-04-11011 April 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Mar 1984 ML20094D7611984-03-14014 March 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984 ML20080F2001983-12-31031 December 1983 Equipment Qualification Insp Program - Annual Rept ML20210E6201983-11-22022 November 1983 Rev 0 to Project Quality Plan for Providing Assistance & Svcs to Support Nrc/Ie Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2. Supporting Documentation Encl ML20081C8211983-08-31031 August 1983 Insp Repts, Aug 1983 ML20081C7821983-07-31031 July 1983 Insp Repts, Jul 1983 ML20209C1501983-05-17017 May 1983 Summarizes Results of Plant Annulus Structure Horizontal Response to Hosgri Seismic Input Analysis Discussed W/Nrc in Mar 1983.Drawing List,Drawings & Envelope Spectra for Each of Four Floors Encl ML20072R6351983-03-11011 March 1983 Independent Design Verification Program Semimonthly Rept,830311 ML20071C6681982-11-30030 November 1982 Draft Identification & Ranking of Nuclear Plant Structures,Sys & Components & Graded QA Guidelines ML20070Q6801982-10-0808 October 1982 Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ ML20070Q6881982-10-0808 October 1982 Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ ML20065A6251982-08-31031 August 1982 Independent Seismic Evaluation of the Diablo Canyon Unit 1 Containment Annulus Structure and Selected Piping Systems ML20062K0861982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20039H1351981-11-30030 November 1981 Audit of PG&E Documentation Concerning Environ Qualification of Safety-Related Electrical Equipment Per NUREG-0588 for Diablo Canyon Nuclear Plants, Technical Evaluation Rept ML20203H3351981-10-22022 October 1981 Audit & Review Summary 811014-16. Supporting Documentation Encl ML20009F0611981-07-31031 July 1981 Diablo Canyon Nuclear Power Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation ML20117M9861977-06-30030 June 1977 Draft Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant 1988-08-29
[Table view] |
Text
F .
, , .l - n =
Lawrence Livermore National Laboratory May 14, 1984 WOW: 84-20 Mr. Phillip J. Morrill, Project Manager U. S. Nuclear Regulatory Agency, Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 PROGRESS REPORT, APRIL 1984 TECHNICAL ASSISTANCE FOR INSPECTION OF DIABLO CANYON DESIGN VERIFICATION PROGRAM, FIN B8552 (UNIT 1) AND FIN A0753 (UNIT 2).
- 1. Proiect Description As a consequence of an Independent Design Verification Program, many modifications and additions to the piping and electrical raceway support systems and building structural steel are being implemented at the Diablo Canyon Nuclear Power Plant. The LLNL is assisting the NRC Region V office in assessing the adequacy of this work.
- 2. Progress - April 1984 Inspection work continued in Unit 2 at the planned level-of-effort (see Attachment 1) with one exception. The week of April 2,1984 was de-voted to the inspection of rectangular tube steel with a perimeter < 14 inches that has been used for Safety Class I systems. The priiiiary objective was to examine 100-200 pieces to verify the outside radius of curvature to be < 2 times the wall thickness. The data was transmitted verbally on ApriT 6,1984 and a written report was issued on April 19, 1984.
Attempts to examine Unit 2 rupture restraints were unsuccessful. Most or 'all of these are apparently missing the bumpers and crushable pads.
Inspection of these items will therefore be delayed until much later in the year when Q.C. has been compl eted and all components have been installed.
- 3. Funding The detailed report of expenditures for this period is provided in Attachments 2 & 3.
- 4. Personnel, Subcontracts,andConsu]tants Mark Eli will be providing temporary assistance to the LLNL inspection program at SONGS during the next report period which may reduce the level-of-effort to this program.
8408080521 840727 PDR ADOCK 05000275 G PDR ni n& Ox e wn i n,m .t ngma c.ac nu . no nu um : z,n c ,m, amso raum.c:m.s??-noa Twox:m9ocw wn
W-0; -
fn p
Mr. Phil/ Morrill' May 14, 1984 p Page 2 L
+
q _ 5. Meetings / Travel k
4 v ' Mark Eli met with Dennis Kirsh in San Luis Obispo on . April 6, 1984 to transmit tube . steel inspection results. Wally Wade met with Phil
- Morrill at the site on April 19, 1984 to resolve administrative topics, n- 6. . Concerns-None
'7. Plans.
- Ins'pections are to continue in Unit 2.
L
- WALLACE G. WADE
' PROJECT MANAGER
'EG&G MECHANICAL-ENGINEERING DEPARTMENT a -
!l: ~
L'~ LAppr0ved:
7-. .)) .e- -
.\
(Wf .)
- GARTH E. CUPNINGS iDEPUTY PROGRAM LEADER f
NUCLEAR SYSTEM SAFETY. PROGRAM
' WOW: cog
, : Attachment
' Distribution:
LLNL- NRC EG8G/SR0 G. -Cumings '
-R. Gilbert A. Debeling
.J.JJohnson-l4 j . , B 46trsch - R. Pong
' R. Langland H. Canter. C. Morton b<
M. L Eli T. Bishop
-R. Isogdanowicz E. Frigillana 4
C.-Meier
-J. Selan-E R.' White d
r , Page 1 of 2
. ATTACHMENT 1 U
N LO6 I PART START COMPLETE STATUS MAN
-NUM LOC T ITEM NUMBER DATE DATE CRIT CONTACTS AFF STATUS DATE INSP HRS
- M0080 AUI BLDS 1 P!PE HANGER 585-138R 7/18/83 4/25/84 ESD 223 TINKLE PS PHYSICAL 1/12/84 MWE 16.0 HOWELL BE NPPR-DCl 3/30/84 MWE 5.0 SAUDIUSD P6 84-CC-2BS SWF-MM 3/30/64 MWE 5.0 1-83-516 ACCEPTED 4/25/84 MWE 3.0 Ml 3 TURBINE BLDG 1 RUPTURE RESTRNT 141RR !!/16/83 4/25/84 ESD 243 MORGAN PG PHYSICAL 11/16/83 MWE 9.0 PARKER P6 RECORDS 12/13/83 ME 4.0 ACCEPTED 4/25/84 MWE 2.0 M1004 CONTAINMENTJ l RUPiliRE RESTRNT 7-4RR !!/16/83 4/25/84 ESD 243 MORSAN P6 RECORDS 12/13/83 MWE 13.0 PARKER P6 ACCEPTED 4/25/84 MWE 2.0
-M1005 CONTAINMENT I RUPTURE RESTRNT l-7RR 11/17/83 4/25/84 ESD 243 MORGAN P6 RECORDS 12/13/83 MWE 11.0 PARKER P6 ACCEPTED 4/25/84 MWE 2.0 M1038 CONTAINMENT '2 SPRAY HANGER 20-96R- 2/22/84 4/25/84 ESD 223 BERNASCONI P6 WELD 2/22/84 MWE 10.0 MICHAELS P6 AS-BUILT 2/22/84 t'WE 2. 0
';. MVR M-4684 3/30/84 ACCEPTED 4/25/84 M1040 CONTAINMENT 2 SPRAY HANGER 20-33R 2/23/84 4/25/84 ESD 223 MICHAELS P6 DR 8174 2/23/84 MWE 9.0 ACCEPTED 4/25/84 PWE 2.0 M1049 CONTAIMENT' -2 SPRAY HANSER 20-12R 3/07/84 4/25/84 ESD 223 MICHAELS P6 RECORDS 3/08/84 PWE 5.0 ACCEPTED 4/25/84 PWE 2.0 M1051 CONTAINMENT 2 SPRAY HAN6ER 20-47R 3/07/84 4/25/84 ESD 223 BERNASCONI PG RECORDS 3/08/84 NWE 5.0 f ACCEPTED 4/25/84 MWE 4/10/84 JCS 2.0 1.5 M1055 CONTAINMENT '2 PIPE HAMBER 412-!!4SL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED THOMAS BE CHM 1.5 BENTACUR BE M1056 CONTAINMENT 2 P!PE HANGER 70-95L 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM 1.5 BENTACUR BE t
~ M1057 CONTAIMENT: 2 PIPE HAN6ER 96-3SL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM 1.5 BENTACUR BE M1058 CONTAI MENT 2 PIPE HANGER 78-260SL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM !.5 BENTACUR - BE
- M1059 CONTAINMENT 2 PIPE HANGER - 78-30BSL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM 1.5 BENTACUR BE
-M1060 CONTA! MENT 2 PIPE HANGER -412-4;SL 4/10/84 4/10/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE CHM 1.5
. . BENTACUR BE M1061 CONTA! MENT - '2 PIPE HANGER 97-12R 4/10'?4 4/10/04 ESD 223 KULIK0WSKI BE ACCEPTED 4/10/84 JCS 1.5 THOMAS BE j"L BENTACUR BE
- M1062 CONTA! MENT -2 PIPE HANGER 5-5R .4/10/94 ESD 223 KULIK0WSKI BE WELD 4/12/84JCS 1. 5 '
THOMAS BE CHM 1.5 BENTACUR BE
.M1063 CONTAINMENT 2 PIPE HANGER 70-66SL 4/11/84 4/11/84 EED 223 KULIK0WSKI BE ACCEPTED 4/11/64 JCS 1.0 THOMAS BE BENTACUR BE M1044 CONTA!WENT - 2 PIPE HAN6ER 412-63SL 4/11/84 ESD 223 KULIK0WSKI BE PHYSICAL 4/12/84 JCS 6.0 THOMAS BE
- BENTACUR BE
.M1065 CONTA! WENT 2 FIPE HANGER - 71-50SL 4/11/C4 4/11/54 ESD 223 KULIK0WSK! BE ACC-W/0-GA 4/11/84 JCS 1.0 THOMAS BE BENTACUR BE
, : M1066 PENETRAT BLDG 2 P!PE HANGER 413-310R 4/11/84 4/11/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/11/84 JCS 1.0 o' THOMAS BE BENTACUR BE
> M!i 7 CONTA! MENT 2 PIPE HANSER ' 71-68SL 4/12/64 ESD 223 KUllK0WSK! BE WLDR QF 4/12/84 JCS 1.5 E50 216 THOMAS BE CHM !.5 BENTACUR BE M1083 CONTAIMENT- 2 PIPE HAN6ER 7-56R' 4/24/84 ESD 223 KULIK0WSKI BE MVR M-4705 4/26/84 CHM 3.0 ESD 216 BERNASCONI BE M1084 CONTAIMENT 2 PIPE HANGER- 7-82R 4/24/84 4/24/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/24/84 CHM 2.0 BERNASCCNI BE
?M1085 VENTILATION: -2 PIPE HAN6ER 333-42R 4/24/84 ESD 223 KULIK0WRI BE MVR M-4706 4/26/84 CHM 3.0 BERNASCONI BE M1086 PENETRAT BLD6 2 PIPE HAN6ER 2045-IV '4/24/84 ESD 223 KUllK0WSKI BE RECORDS 4/26/84 CHM 2.0 BERNASCONI BE
- M1087 CONTAINMENT .-2 P!PE HANGER 78-2595L 4/24/84 4/24/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/24/84 CHM 2.0 BERNASCONI BE
.M1088 CONTAINMENT. . 2 PIPE HAN6ER 14R 4/25/84 4/25/84 ESD 223 KUllK0WSK! BE ACCEPTED 4/25/84 CHM 2.0 EERNASCON! BE k
'a _
Page P. of 2 g,K. 7 ,
ATTACHMENT 1
'N1089 CONTAIMENT ? P!PE HAN6ER- 2-23V~ 4/25/84 ESD 223 KULIK0WSK! BE WLCR QF 4/26/84 CHM 3.0 ESD 216 BERNASCONI BE
- N1090 CONTA! MENT' : 2 PIPE HAN6ER 6-121R 4/25/84 4/25/84 ESD 223 KUllK0WSKI BE ACCEPTED 4/25/84 CHM 3.0
, BERNASCONI BE
.M1091 CONTA!'NMENT - ' 2 PIPE'HAN6ER6-132V 4/25/84 4/26/94 ESD 223 KULIK0WSKI BE ACCEPTED 4/26/84 CHM 2.0 F . .
BERNASCON! PE
.M1092 CONTAINMENT ~ . 2 PIPE HAN6ER. 412-IllR 4/25/84 4/25/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/25/84 CHM 2.0 BERNASCON! BE M1093 CONTA! MENT -2 PIPE HAN6ER 412-149SL 4/25/84 4/25/84 ESD 223 KULIK0WSK! BE ACCEPTED 4/25!84 CHM 2.0 0 ~
. BERNASCONI BE
- Ml Z4 AUX BLD6 ' 2 PIPE HAN6ER- 948-4R 4/25/84 4/26/84 ESD 223 KULIK0WSKI BE ACCEPTED 4/26/84 CHM 2.0 BERNASCONI BE S1024 CONTAINMENT - ~2 A MULUS' 10033-C2-13-249 2/01/04 4/25/84 QCP 3 KCHLER BE WELD 2/01/84 MWE QCP 5A MUNRO BE WLDR QF 2/02/84 MWE 14.0 QCP C7 BECK 0RT F0 NCR 2/02/84 MWE QCP 5 AMARILLAS F0 54?2-455 BURD0!N NR CITAT!DN 2/10/84 ACC-W/0-QA 4/25/84 MWE 3.0 51025 CONTAINMENT ' 2 ANNULUS 10043-02-13-420 2/07/84 4/25/84 QCP 3 KOHLER BE PHYSICAL 2/07/84 MWE QCP 5A MUNR0 BE NCR 2/08/84 MWE 3.0 QCP C7 BECK 0RT F0 5422-466 3/30/84
.. , ACC-W/0-QA 4/25/84 MWE 3.0 51026 CONTA! MENT'. 2 ANNULUS 10074-C2-13-652 2/08/84 4/25/24 QCP 3 KOHLER BE PHYSICAL 2/08/84 MWE QCP 5A MUNR0 BE NCR 2/09/84 MWE 3.0 GCP C7 BECK 0RT F0 5422-462 3/30/84 ACC-W/0-QA 4/25/84 MWE 3.0
.: 51075 CONTAINMENT . 2 ANNULUS 10042-02-13-690 4/11/84 4/11/84 QCP 5A MUNR0 BE ACC-W/0-QA 4/11/84 JCS 1.0 QCP C7 BER6 F0 lS1076 CONTAINMENT" - 2 ANNULUS 10028-C2-13-113 4/11/84 4/11/84 QCP 5A MUNR0 BE ACC-W/0-QA 4/11/84JCS 1.0 GCP C7 BERS F0 S1077 CONTAINMENT . 2 ANNULUS 10003-C2-13-015 4/11/84 4/11/84 QCP 5A NUNR0 BE ACC-WID-QA 4/11/84 JCS 1.0 QCP C7 BERS F0 CHM 1.0 S1078 CONTAIMENT 2 ANNULUS. 10003-C2-13-003 4/11/84 4/12/84 QCP 5A MUNR0 BE ACC-W/0-QA 4/12/04 JCS 1.5 ECP C7 BERS F0 CHM !.5 QCP 5
. 51079 TURRINE BLD6 2 TURBINE BLD6 10181-t2-13-823 4/25/84 QCP 3 HARRISON BE RECORDS 4/25/84 MWE 4.0 QCP 5A BERS F0 QCP C7 3
a e
i, b
[_, --
. . -) . -
ATTACHMENT 2 s
UNIT )1 PROJECT FINANCIAL STATUS (THROUGH 30 APRIL 1984)*
M _
JA '. - STATUS'- (Dollars in thousands)
Total _ Projected. Funds Obligated Balance of Funds Due Project Cost To Date FY 1983
$345.0K $345.0K B. ANALYSIS Period Cumulative
' Direct Laboratory Staff Effort -(FTE) 0 1.2 Direct Salaries $ 0 $ 36.0 Material' and Services (Excluding ADP) $ - $ -
'ADP Support.. $ -
' Subcontracts (EG8G, Inc.) $ 7.5 $ 94.6 g Travel Expenses $ .2 $ 17.5 g iIndirect' Labor Costs $ 0 $ 34.8 h" Other~(TID)
~ '
$ 0 $ 0.2 l ,, ' General and Administrative $ 0.7 $ 27.5 mi . _
I:f;' ,
i h~ TOTAL $ 8.4 $210.6
- =
Thy ,
Lieni $ (0.5)
L Total - Inc1 uding . Liens $210.1 )
bu.
1.m '
N '(Percent of~Available Funding) 61% I 4{e m .
- NOTE: -Figures may differ slightly from final billing, y l G- -
ATTACHMENT 3 UNIT #2 PROJECT FINANCIAL STATUS (THROUGH 30 APRIL 1984)*
A. -STATUS (Dollars in thousands)
Total Projected Funds Obligated Balance of Funds Due l Project Cost To Date FY 1983 l
1
$125.0K $125.0K - 0_- I l
B. ANALYSIS Period Cumulative 3
Direct Laboratory Staff Effert (FTE) 1.7 4.9 Direct Salaries $ 7.3 $ 20.3 Material and Services (Excluding ADP) $ - $ -
ADP Support $ -
Subcontracts (EG8G,.Inc.) $ 9.3 $ 21.4 Travel Expenses $ 2.2 $ 6.0 l Indirect Labor Costs $ 9.4 $ 21.7 Other (TID) $ 0 $ 0 General and Administrative $ 3.9 $ 3.9 j
TOTAL $32.1 $ 73.3 Liens $ (1.4) )
l Total Including Liens $ 71.9 (Percent of Available Funding) 58%
- NOTE: Figures may differ slightly from final billing.
I,